US$459.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 997-2015: Verification Regulation of Liquefied Petroleum Gas Dispenser Status: Valid JJG 997: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJG 997-2015 | English | 459 |
Add to Cart
|
4 days [Need to translate]
|
Verification Regulation of Liquefied Petroleum Gas Dispenser
| Valid |
JJG 997-2015
|
JJG 997-2005 | English | RFQ |
ASK
|
9 days [Need to translate]
|
Liquefied Petroleum Gas Dispensers
| Obsolete |
JJG 997-2005
|
PDF similar to JJG 997-2015
Basic data Standard ID | JJG 997-2015 (JJG997-2015) | Description (Translated English) | Verification Regulation of Liquefied Petroleum Gas Dispenser | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A53 | Classification of International Standard | 17.120 | Word Count Estimation | 20,290 | Date of Issue | 2015-12-07 | Date of Implementation | 2016-06-07 | Older Standard (superseded by this standard) | JJG 997-2005 | Quoted Standard | GB 19159; GB/T 19238; GB 50156; SH/T 0221; OIML R117-1-2007; ASTM IP-API | Regulation (derived from) | ?AQSIQ 2015 Nian (No.148) | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard applies to liquefied petroleum gas filling machine (hereinafter referred to as filling machine) the first test, follow-up verification and use of inspection. |
JJG 997-2015: Verification Regulation of Liquefied Petroleum Gas Dispenser---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Liquefied Petroleum Gas Dispenser
National Metrological Verification Regulation of the People's Republic of China
Liquefied petroleum gas filling machine
2015-12-07 released
2016-06-07 implementation
State Administration of Quality Supervision, Inspection and Quarantine issued
Liquefied petroleum gas filling machine
Verification procedures
Replacing JJG 997-2005
Responsible Unit. National Traffic Capacity Measurement Technical Committee
The main drafting unit. Shenyang measurement test institute
Shanghai Institute of Metrology and Testing Technology
Fu standard measuring instrument (Shanghai) Co., Ltd.
Participated in the drafting unit. China Institute of Metrology
Measurement and Testing Institute of Heilongjiang Province
Shenyang Quality and Technical Supervision Bureau
This procedure entrusts the National Flow Capacity Measurement Technical Committee to explain
The main drafters of this procedure.
Sun Dayong (Shenyang Metrology Institute)
Zhang jinming (Shanghai Institute of Metrology and Testing Technology)
Wang Rongjie (Fu standard measuring instrument (Shanghai) Co., Ltd.)
Participate in the drafters.
Meng Tao (China Institute of Metrology)
Liu Yong (Heilongjiang Province measurement test test hospital)
Yu Li (Shenyang City Quality and Technical Supervision)
Ma Liqiang (Shenyang Metrology Institute)
table of Contents
Introduction (II)
1 Scope (1)
2 References (1)
3 terms and units of measurement (1)
3.1 Terms (1)
3.2 Units of measurement (3)
4 Overview (3)
4.1 Principles (3)
4.2 Construction (4)
5 Metrological performance requirements (4)
5.1 Maximum allowable error (4)
5.2 Flow range (4)
5.3 Minimized measurement of the filling machine (4)
5.4 Density range (4)
5.5 minimum volume variable (4)
5.6 Paid amount error (4)
6 General technical requirements (4)
6.1 appearance and random file (4)
6.2 Flowmeter (5)
6.3 Electronic meter control (5)
6.4 Additional equipment (6)
6.5 Temperature sensor (6)
6.6 Density (6)
6.7 Sealing (6)
7 Metering device control (6)
7.1 Test conditions (6)
7.2 Verification projects and methods (7)
7.3 Processing of Verification Results (11)
7.4 Verification cycle (11)
Appendix A Standard Mass Flowmeter Verification Method (12)
Appendix B Verification Certificate and Verification Result Incoming Page Format (13)
Appendix C Verification of the original record format (14)
Introduction
This procedure is in accordance with JJF1002-2010 "national measurement procedures for the preparation of rules" requirements,
Learning, operability, economy, according to OIMLR117-1..2007 "non-aqueous liquid dynamic measurement system
The first part of the measurement and technical requirements ", combined with China's liquefied petroleum gas filling machine technical level and industry status
And is revised to be equivalent to international recommendations on key technical indicators. Compared with JJG 997-2005, in addition to editorial changes
The main technical changes are as follows.
- the specific requirements have been added to the terminology and content;
The measurement repeatability of the filling machine indication shall be modified to not exceed 0.3% (see 5.1.1);
- The minimum measured repeatability of the aerator shall be modified to not exceed 0.6% (see 5.1.2);
--- The flow rate range of the filling machine is changed to the maximum flow rate of not less than 40L/min, the range is not less than 5. 1
(See 5.2);
--- Increases the amount of payment for the filling machine (see 5.6);
--- According to OIMLR117-1..2007, the general technical requirements for the filling machine are more scientific and reasonable
Provisions;
--- refinement of the test conditions;
--- The expansion uncertainty of the standard device should not exceed 1/3 of the absolute value of the maximum permissible error of the aerator
7.1.3);
--- environmental conditions have been properly modified;
--- for the filling machine test status quo, the standard volumetric flow meter test method as a main test method to be described
(See 7.2);
--- According to JJF1002-2010 "national measurement procedures for the preparation of rules" requirements, re-modify the test
Certificate/Verification Result Page format.
The previous versions of this order are released as follows.
--- JJG 997-2005.
Verification rules for liquefied petroleum gas filling machine
1 Scope
This procedure applies to the first test of liquefied petroleum gas filling machine (hereinafter referred to as filling machine), subsequent verification and use
Check in.
2 reference file
This procedure refers to the following documents.
GB 19159 Car Liquefied petroleum gas
GB/T 19238 Liquefied petroleum gas filling machine for automobiles
Code for design and construction of GB 50156 automobile refueling station
SH/T 0221 Determination of liquefied petroleum gas density or relative density (pressure density meter method)
OIMLR117-1..2007 Dynamic metering systems for non-aqueous liquids - Part 1 Metrology and technical requirements
(Dynamicmeasuringsystemsforliquidsotherthanwater-Part 1. metrologicaland
technicalrequirements
ASTM-IP-API Light Carbonate Liquid Petroleum Measurement Form (ASTM-IP-APIPetroleum
measurementtablesforlighthydrocarbonliquid, 1986)
Petroleum Measurement Standards Manual 11.2.2. Hydrocarbons in (350 to 637) kg/m3 and (-46 ~
Compression factor at 60 ° C (Manual of petroleum measurement standards, Chapter
11.2.2M-Compressibilityfactorsforhydrocarbons. 350-637kilogramspercubic
metredensity (15 ° C) and-46 ° C to 60 ° C meteringtemperature, 1986)
For dated references, only the dated edition applies to this rule; references that are not dated
, The latest version (including all amendments) applies to this procedure.
3 terms and units of measurement
3.1 terminology
3.1.1 Car liquefied petroleum gas liquefiedpetroleumgasforvehicle
A liquid petroleum products for automotive fuels, referred to as LPG, propane, butane as the main component.
3.1.2 Baseline conditions basecondition
LPG at 15 ° C, saturated vapor pressure conditions.
3.1.2 base volume basevolume
The volume value of LPG under the reference condition.
Gasoline Gas Filling Machine LPGdispenser
For liquefied petroleum gas vehicles to provide liquefied petroleum gas fuel filling services, and with a metering, pricing device dedicated
equipment.
[GB/T 19238, definition 3.1]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 997-2015_English be delivered?Answer: Upon your order, we will start to translate JJG 997-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJG 997-2015_English with my colleagues?Answer: Yes. The purchased PDF of JJG 997-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJG 997-2015?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 997-2015 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|