US$439.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 996-2012: Verification Regulation of Compressed Natural Gas Dispensers Status: Valid JJG 996: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJG 996-2012 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Verification Regulation of Compressed Natural Gas Dispensers
| Valid |
JJG 996-2012
|
JJG 996-2005 | English | RFQ |
ASK
|
9 days [Need to translate]
|
Compressed Natural Gas Dispensers
| Obsolete |
JJG 996-2005
|
PDF similar to JJG 996-2012
Basic data Standard ID | JJG 996-2012 (JJG996-2012) | Description (Translated English) | Verification Regulation of Compressed Natural Gas Dispensers | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A53 | Classification of International Standard | 17.120 | Word Count Estimation | 19,118 | Older Standard (superseded by this standard) | JJG 996-2005 | Quoted Standard | GB 18047; GB/T 19236; GB/T 19237; GB 50156; OIML R139-2007 (E) | Adopted Standard | OIML R139-2007(E), NEQ | Regulation (derived from) | AQSIQ Announcement No. 199 of 2012 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard applies to compressed natural gas filling machine (hereinafter referred to as filling machine) the initial verification, testing and use of follow-up checks. |
JJG 996-2012: Verification Regulation of Compressed Natural Gas Dispensers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Compressed Natural Gas Dispensers
State verification procedures People's Republic of China
CNG filling machine
Issued on. 2012-12-03
2013-06-03 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
CNG filling machine
Verification Regulation
ensers
Replacing JJG 996-2005
Focal point. the National Technical Committee on Metering flow capacity
Main drafting unit. Chongqing Institute of Metrology and Quality Inspection
China Testing Technology Research Institute
Beijing Institute of Metrology detection
Participated in the drafting unit. China Institute of Metrology
Chongqing, a giant metering equipment Ltd.
This procedure flow capacity commissioned the National Technical Committee responsible for the interpretation of measurement
The main drafters of this procedure.
Wang Shuo (Chongqing Institute of Metrology and Quality Inspection)
Zhaopu Jun (China Testing Technology Research Institute)
Guan Jin Wei (Beijing Institute of Metrology detection)
Drafters participate.
Meng Tao (China Institute of Metrology)
Qining Wu (Chongqing Institute of Metrology and Quality Inspection)
Zhang Zehong (Chongqing Institute of Metrology and Quality Inspection)
Liu Wei (Chongqing Juchuang metering equipment Co., Ltd.)
table of Contents
Introduction (Ⅲ)
1 Scope (1)
2. References (1)
3 terminology and units of measurement (1)
3.1 The term (1)
3.2 units of measurement (2)
4 Overview (2)
4.1 structure (2)
4.2 Principle (2)
5 metering performance requirements (3)
5.1 The maximum permissible error (3)
5.2 Repeatability (3)
5.3 Amount Paid error (3)
6 General Requirements (3)
6.1 Appearance and accompanying documents (3)
6.2 feature set (3)
Tightness 6.3 (4)
6.4 limiting protection (4)
7 control of measuring instruments (4)
7.1 test conditions (4)
7.2 test items and methods (5)
7.3 Verification Results Processing (8)
7.4 test cycle (8)
Appendix A mass Gas Flow Standard Device (9)
Table B Standard Gas Flow Standard Device appendix (11)
Appendix C without pressure limiting protection of the filling machine (12)
Appendix D calibration certificate/test results notice within the page and format (13)
Introduction
This procedure is based on the national standard GB/T 19237-2003 "car with compressed natural gas filling machine" and international law
System Metrology Organization (OIML) International Recommendation R139.2007 (E) "vehicle fuel gas compression system for measuring"
(Compressedgaseousfuelmeasuringsystemsforvehicles) as a technical basis, combined with our filling
Situation machine industries, JJG 996-2005 "CNG refueling machine" subject to revisions. In the main technical means
Superscript and international recommendations, national equivalents.
Compared with JJG 996-2005, this procedure except editorial changes, the major technical changes are as follows.
--- Modify the scope of application of procedures;
--- Remove the original procedure in Appendix A "type of evaluation items and test methods", as a national type evaluation outline
Technical specifications shall be formulated;
--- Increased by large, medium and small flow filling machine terminology;
--- Modify the nameplate of measuring instruments, increasing the minimum content to be measured;
--- Modified with a pressure limiting protection structure and working principle function filling machine;
--- Increase the structure and working principle without pressure limiting protection filling machine;
--- Modify the voltage limiting protection pressure range;
--- Modified using standard means test specifications;
--- Modify the quality of the Gas Flow Standard device parameters associated equipment;
--- Modify the measurement accuracy check (traffic interval, data processing, etc.);
--- Modified calibration certificate/test results in the notice page format.
For CNG refueling machine volume displayed within one year after the implementation of this Regulation shall be changed to significant quality
It shows the filling machine.
CNG filling machine verification procedures
1 Scope
The order applies to compressed natural gas filling machine (hereinafter referred to as filling machine) initial verification, use and subsequent verification
Check.
2. References
GB 18047 CNG
GB/T 19236 cars with compressed natural gas dispensing nozzles
GB/T 19237 Automotive CNG refueling machine
GB 50156 car design and construction of refueling stations
OIMLR139.2007 (E) vehicle compressed gaseous fuel measuring systems (Compressedgaseousfuel
measuringsystemsforvehicles)
For dated references, only the dated edition applies to this procedure; undated reference documents
Member, the latest edition (including any amendments) applies to this procedure.
3 terminology and units of measurement
3.1 Terms
3.1.1 CNG refueling machine compressednaturalgas (CNG) dispenser
CNG filling the gas container, with special equipment and devices such as metering and pricing. It comprises a mass
Meter, electronic meter controller, quick disconnect valve, dispensing nozzles and the like.
3.1.2 Electronic meter controller electroniccomputer
Computing and control means filling machine. May receive transmitted flow meter signal and voltage limiting transmission to the sensor
Pressure signal, according to pre-set and filling machine parameters for computing and processing; you can transfer data and display operation
Make, and automatically determine and control the flow of gas.
Note. The electronic meter controller to achieve the main function indication indicator, zeroing, adjust function, indicating the amount paid functions.
3.1.3 adjustment means adjustmentdevice
For adjusting the filling machine indication error, error indication ensure maximum permissible error of the device.
3.1.4 auxiliary device ancilarydevice
Means for realizing filling machine special functions.
Note. The auxiliary device can achieve the main function preset function, the print function or IC card pre-paid functions.
3.1.5 Additional means additionaldevice
In order to ensure proper filling machine simplify device operation or measuring device for measuring an auxiliary operation and safe operation beyond.
Note. There are additional means dispensing nozzles, high pressure hose, pull off valves, quick disconnect valve or pressure-limiting sensors.
3.1.6 dispensing nozzles dispensernozzle
For filling or discharge of compressed natural gas, and in accordance with the manual specific tools GB/T 19236 requirements.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 996-2012_English be delivered?Answer: Upon your order, we will start to translate JJG 996-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJG 996-2012_English with my colleagues?Answer: Yes. The purchased PDF of JJG 996-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJG 996-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 996-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|