US$369.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 656-2013: Verification Regulation of Nitrate-Nitrogen Automatic Analyzers Status: Valid JJG 656: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJG 656-2013 | English | 369 |
Add to Cart
|
3 days [Need to translate]
|
Verification Regulation of Nitrate-Nitrogen Automatic Analyzers
| Valid |
JJG 656-2013
|
JJG 656-1990 | English | 599 |
Add to Cart
|
4 days [Need to translate]
|
Verification Regulation of Nitrate Automatic Monitor
| Obsolete |
JJG 656-1990
|
PDF similar to JJG 656-2013
Basic data Standard ID | JJG 656-2013 (JJG656-2013) | Description (Translated English) | Verification Regulation of Nitrate-Nitrogen Automatic Analyzers | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A61 | Classification of International Standard | 17.020 | Word Count Estimation | 16,123 | Older Standard (superseded by this standard) | JJG 656-1990 | Regulation (derived from) | AQSIQ Announcement No. 122 2013 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | Summary | This standard applies to: electrode method and spectrophotometry automatic monitor nitrate -based initial verification, testing and use of the follow-up examination. |
JJG 656-2013: Verification Regulation of Nitrate-Nitrogen Automatic Analyzers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Nitrate-Nitrogen Automatic Analyzers
State verification procedures People's Republic of China
Nitrate Diver
Issued on. 2013-09-02
2014-03-02 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
Nitrate Diver
Verification Regulation
AutomaticAnaly
zers
Replacing JJG 656-1990
Focal point. the National Technical Committee on Environment stoichiometry
Main drafting unit. Shanghai Institute of Measurement and Testing
Participated in the drafting unit. Jiangsu Province Institute of Metrology
Shanghai Electronics Science Instrument Co., Ltd.
This procedure commissioned the National Technical Committee of the stoichiometric environment responsible for interpreting
The main drafters of this procedure.
Ding Min (Shanghai Institute of Measurement and Testing)
Gu Wei Ran (Shanghai Institute of Measurement and Testing)
Gongfei Yan (Shanghai Institute of Measurement and Testing)
Drafters participate.
Cai Ye Qiang (Jiangsu Province Institute of Metrology)
Jiangxiao Xiong (Jiangsu Province Institute of Metrology)
Wang Qiaomei (Shanghai Electronics Science Instrument Co., Ltd.)
table of Contents
Introduction (Ⅲ)
1 Scope (1)
2 Overview (1)
3 metering performance requirements (1)
4 General Requirements (1)
4.1 Appearance (1)
4.2 Safety Requirements (2)
5 control of measuring instruments (2)
5.1 verification Conditions (2)
5.2 Verification Project (2)
5.3 Verification Methods (3)
6 test results processing (4)
7 test cycle (4)
A standard solution of nitrate formulated appendix (5)
Appendix B Nitrate Diver Verification original records (6)
Appendix C calibration certificate/test results in the notice page format (8)
Introduction
JJG 656-2013 "Nitrate Diver" is JJG 656-1990 "nitrate Diver"
Amendments. Compared with JJG 656-1990 "nitrate automatic monitoring instrument", in addition to editorial changes, the main technical change
Of the following.
--- Name change procedures to "nitrate nitrogen Diver";
--- Revised overview of Nitrate automatic monitor Principle and purpose (see 2);
--- Remove the original statutes of electric meter performance requirements;
--- Revised stability program technical requirements and test methods (see Table 1 and 5.3.4);
--- Revised indication error, repeatability, stability and response time test project using standard mass concentration solution
(See 5.3.2,5.3.3,5.3.4,5.3.5);
--- Increased dielectric strength and leakage current test project requirements (see 4.2 and 5.3.6);
--- Increased the list of test items of measuring instruments control (see Table 2);
--- Revised Appendix 1 for preparing standard solution and the buffer solution (see Appendix A).
Nitrate Diver verification procedures
1 Scope
The order applies to electrode method based on spectrophotometric and online automatic monitor nitrate initial verification, follow-up inspection
And given the use of checks.
2 Overview
Nitrate Diver automatic continuous monitoring of groundwater, surface water, sewage and industrial waste water and other water bodies
The nitrate concentrations.
Nitrate Diver measurement method and the main electrode. Spectrophotometry by measuring a specific wavelength
The absorbance of water samples quantitative determination of nitrate nitrogen content; electrode is obtained nitrate in water samples by measuring the electrode potential
Acid nitrogen content.
Instrument consists of sampling, processing water samples, testing, data acquisition, processing, display and transmission unit.
3 metering performance requirements
Performance measurement instrument requirements in Table 1.
Table 1 nitrate nitrogen automatically monitors the performance measurement requirements
Project Performance Requirements
Indication error ± 10%
Repeatability ≤3%
No more than ± 10% within 4h stability
Response time * ≤10min
Note. Fields marked "*" are the only electrode instrument calibration project, the same below.
4 General technical requirements
4.1 Appearance
4.1.1 All equipment parts and accessories should be tight and not loose; connector should be connected well; moving parts should be free movement
Live, smooth; pipe connection ports inside and outside the various instruments must be reliably sealed to prevent leakage. After the instrument is powered, the components are
To work properly, all knobs, buttons shall be able to adjust the display unit displays the results should be clear and complete.
All newly manufactured instrument plating surface 4.1.2 There shall be no peeling, painted surface color should be uniform, not Ariake
Obvious scratches, show the bottom of cracks, blistering and corrosion phenomenon, the exposed parts joints should be neat, no rough phenomenon.
The use of the instrument should not affect the normal operation of its damage.
4.1.3 Instrument nameplate should be marked with the instrument name, model, serial number, date of manufacture, manufacturer's name, manufacturing measurement
Appliance license logo and number.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJG 656-2013_English be delivered?Answer: Upon your order, we will start to translate JJG 656-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJG 656-2013_English with my colleagues?Answer: Yes. The purchased PDF of JJG 656-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJG 656-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 656-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|