HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

JJG 1106-2015 English PDF

US$719.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
JJG 1106-2015: Static Harmonic Meters of Active Electrical Energy for Working
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
JJG 1106-2015English719 Add to Cart 6 days [Need to translate] Static Harmonic Meters of Active Electrical Energy for Working Valid JJG 1106-2015

PDF similar to JJG 1106-2015


Standard similar to JJG 1106-2015

JJF 1234   JJG 376   JJF 1106   JJF 2000   JJG 1115   JJG 1112   

Basic data

Standard ID JJG 1106-2015 (JJG1106-2015)
Description (Translated English) Static Harmonic Meters of Active Electrical Energy for Working
Sector / Industry Metrology & Measurement Industry Standard
Classification of Chinese Standard A55
Classification of International Standard 17.22
Word Count Estimation 31,346
Date of Issue 2015-01-30
Date of Implementation 2015-04-30
Quoted Standard JJG 596-2012; JJG 597-2005; GB/T 17215.302-2013; GB/T 17215.352-2009
Regulation (derived from) The State Administration of Quality Supervision, Inspection and Quarantine Announcement 2015 No. 19
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine
Summary This Standard applies to the fundamental frequency is 50 Hz or 60 Hz single-phase, three-phase operation with static harmonic active energy meter (referred to as harmonic meter) of the initial verification, subsequent verification.

JJG 1106-2015: Static Harmonic Meters of Active Electrical Energy for Working

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Static Harmonic Meters of Active Electrical Energy for Working State verification procedures People's Republic of China Working with static harmonic active power meter Issued on. 2015-01-30 2015-04-30 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Working with static harmonic active power meter Verification Regulation Focal point. the National Technical Committee on Electromagnetic measurement Main drafting unit. Zhejiang Institute of Metrology Jiangsu Province Institute of Metrology Participated in the drafting unit. China Institute of Metrology Ningbo Ji Wei Electric Co., Ltd. The measurement procedure commissioned the National Technical Committee is responsible for interpreting electromagnetic The main drafters of this procedure. Chou Park (Zhejiang Institute of Metrology) Zhu Zhongwen (Zhejiang Institute of Metrology) Dao-liter (Jiangsu Province Institute of Metrology) Drafters participate. Peng Xiaoxiao (Zhejiang Institute of Metrology) Wang Lei (China Institute of Metrology) Wuwei Zong (Ningbo Ji Wei Electric Co., Ltd.)

table of Contents

Introduction (Ⅱ) 1 Scope (1) 2. References (1) 3 Overview (1) 4 metering performance requirements (1) 4.1 basic error (1) 4.2 creep (2) 4.3 Start (2) 4.4 meter constant (3) 4.5 day clock timing error (3) 5 General technical requirements (3) Flag 5.1 (3) 5.2 AC voltage test (3) 6 Control of measuring instruments (3) 6.1 for initial verification and subsequent verification (4) 6.2 test conditions (4) 6.3 Verification Project (6) 6.4 Verification Methods (6) 6.5 Verification Results Processing (9) 6.6 test cycle (9) Appendix A test reference the original record format (10) Appendix B test certificates/test results in the notice page format (15)

Introduction

This procedure based on JJF1002-2010 "national verification procedures write rules" establishment. The regulations refer JJG 596-2012 "electronic AC meter", JJG 597-2005 "AC Meter Unit Fixed device "and GB/T 17215.302-2013" AC measuring equipment - Specific requirements - Part 2. Static Harmonic active energy meter "and other national regulations and standards. This procedure should JJG 596-2012 "electronic AC meter" used in conjunction, have completed static harmonic Reactive energy meter verification work. This procedure was first formulated. Working with static harmonic watthour meter testing procedures

1 Scope

The order applies to the fundamental frequency of 50Hz or 60Hz single-phase, three-phase operation with a static harmonic active power meter (Referred to as the harmonic power meter) of the initial verification, subsequent verification. For other meter has a harmonic function, the same verification procedure of the project implementation. 2. References This procedure refers to the following documents. JJG 596-2012 electronic AC power meter JJG 597-2005 AC power meter testing equipment GB/T 17215.302-2013 AC measuring equipment - Specific requirements - Part 2. there are static harmonic Power meter GB/T 17215.352-2009 AC measuring equipment - Specific requirements - Part 52. Symbols For dated references, only the dated edition applies to this procedure; undated reference documents Member, the latest edition (including any amendments) applies to this procedure.

3 Overview

Harmonic power meter means were measured and recorded (s) 2 - (s) N harmonic fundamental active power and provisions Static active energy meter, N generally take 21, 31 or 41 times and so on.

4 metering performance requirements

4.1 basic error The basic error of the fundamental harmonic active energy meter shall comply with the provisions of JJG 596-2012 4.1. The basic error of using harmonic harmonic active power meter indicates the relative error, response measurement of each harmonic direction Basic error test wave active energy. 6.2.1 Under the provisions of reference conditions, the basic error of a single harmonic energy limit Tables 1 and 2 shall satisfy the provisions of (a reference to GB/T 17215.302-2013) 1.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of JJG 1106-2015_English be delivered?

Answer: Upon your order, we will start to translate JJG 1106-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of JJG 1106-2015_English with my colleagues?

Answer: Yes. The purchased PDF of JJG 1106-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.