|
US$259.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. HYT0306-2021: Area control index for industrial sea use Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| HY/T 0306-2021 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
Area control index for industrial sea use
| Valid |
HY/T 0306-2021
|
PDF similar to HYT0306-2021
Basic data | Standard ID | HY/T 0306-2021 (HY/T0306-2021) | | Description (Translated English) | Area control index for industrial sea use | | Sector / Industry | Marine Industry Standard (Recommended) | | Classification of Chinese Standard | A45 | | Word Count Estimation | 11,137 | | Issuing agency(ies) | Ministry of Natural Resources of the People's Republic of China |
HYT0306-2021: Area control index for industrial sea use---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Area control index for industrial sea use
ICS 07.060
A45
Marine Industry Standard of the People's Republic of China
Industrial Sea Area Control Index
Released on 2021-02-09
2021-06-01 implementation
Issued by the Ministry of Natural Resources of the People's Republic of China
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General 1
5 Control indicators 2
5.1 Sea area utilization 2
5.2 Coastline change ratio 2
5.3 Proportion of ecological space area 2
5.4 Investment intensity 3
5.5 Floor area ratio 3
5.6 Proportion of the area of administrative office and living service facilities 3
5.7 Develop the back-off distance 4
5.8 Proportion of land reclamation 4
5.9 Control index value 4
Appendix A (Normative Appendix) Industrial Sea Area Control Index Value 5
Appendix B (Normative Appendix) Description of Types of Use of Industrial Sea Areas 7
Reference 8
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Ministry of Natural Resources of the People's Republic of China.
This standard is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283).
Drafting organizations of this standard. National Ocean Technology Center, First Institute of Oceanography of Ministry of Natural Resources, South China Sea Planning and Environmental Research of State Oceanic Administration
Research Institute.
The main drafters of this standard. Yue Qi, Zhang Jingyi, Xu Wei, Yang Liang, Liu Dahai, Wang Ping, Xie Sumei, Yang Lijing, Teng Xin, Xing Wenxiu, Hu Heng,
Li Yanping.
Industrial Sea Area Control Index
1 Scope
This standard specifies the control indicators for industrial sea area.
This standard is applicable to the area control of the sea for newly-built fishery, industry, transportation, tourism and entertainment, land reclamation projects and other projects.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document.
HY/T 124 Regulations for the investigation of maritime registration
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Control index
An indicator for controlling the use of sea areas in a construction project.
3.2
Seaareautilizationrate
The effective use area within the project's land reclamation area accounts for the proportion of the project's land reclamation area.
3.3
Areaoflandformseareclamation
The effective land area formed by the project through land reclamation, that is, the land area within the shoreline (bank revetment) formed by land reclamation.
3.4
Areaofeffectiveuse
Various buildings, structures used for production and direct production services, open-air equipment yards, storage yards and operation yards and other sea areas.
3.5
Coastline change ratio
The ratio of the length of the newly formed shoreline of reclamation to the length of the original shoreline (including natural shoreline and artificial shoreline) occupied by the project.
3.6
Investment intensity
The amount of investment in fixed assets per unit area within the project's land reclamation area.
4 General
Strictly control the scale of industrial sea reclamation and the length of the occupied shoreline, improve the efficiency of sea area development and utilization, and realize the smallest sea area space resources
Consumption and minimal impact on the marine environment serve the sustainable development of the marine economy and promote the economical and intensive use of coastal resources in the sea. Industrial Sea
Control principles include.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HYT0306-2021_English be delivered?Answer: Upon your order, we will start to translate HYT0306-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of HYT0306-2021_English with my colleagues?Answer: Yes. The purchased PDF of HYT0306-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|