HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (1 Nov 2025)

HYT0273.3-2021 English PDF

US$599.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
HYT0273.3-2021: Technical directives for risk assessment and zoning of marine disaster - Part 3: Tsunami
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
HY/T 0273.3-2021English599 Add to Cart 3 days [Need to translate] Technical directives for risk assessment and zoning of marine disaster - Part 3: Tsunami Valid HY/T 0273.3-2021

PDF similar to HYT0273.3-2021


Standard similar to HYT0273.3-2021

GB/T 33673   DZ/T 0175   HY/T 0273.4   HY/T 0273.5   HY/T 0273   

Basic data

Standard ID HY/T 0273.3-2021 (HY/T0273.3-2021)
Description (Translated English) Technical directives for risk assessment and zoning of marine disaster - Part 3: Tsunami
Sector / Industry Marine Industry Standard (Recommended)
Classification of Chinese Standard A45
Word Count Estimation 26,275
Issuing agency(ies) Ministry of Natural Resources of the People's Republic of China

HYT0273.3-2021: Technical directives for risk assessment and zoning of marine disaster - Part 3: Tsunami


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical directives for risk assessment and zoning of marine disaster-Part 3.Tsunami ICS 07.060 CCSA45 Marine Industry Standard of the People's Republic of China Technical Guidelines for Marine Disaster Risk Assessment and Zoning Part 3.Tsunami Part 3.Tsunami 2021-02-09 release 2021-06-01 implementation Issued by the Ministry of Natural Resources of the People's Republic of China

Table of contents

Foreword Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Working Principle 2 4.1 Comprehensive 2 4.2 Reliability 3 4.3 Consistency 3 4.4 Subscale 3 5 National scale assessment and zoning 3 5.1 Data collection 3 5.2 Determination of potential earthquake and tsunami source 3 5.3 Model establishment 4 5.4 Model verification 4 5.5 Numerical simulation calculation of tsunami 4 5.6 Tsunami disaster risk assessment and zoning 5 5.7 Results Mapping 5 5.8 Evaluation report preparation 5 6 Provincial scale assessment and zoning 5 6.1 Data collection 5 6.2 Model building 6 6.3 Tsunami risk assessment and zoning 6 6.4 Vulnerability assessment of disaster-bearing body 6 6.5 Tsunami disaster risk assessment 6 6.6 Tsunami disaster risk zoning 7 6.7 Results Mapping 7 6.8 Preparation of Evaluation Report 7 7 City (county) scale assessment and zoning 7 7.1 Data collection and supplementary investigation 7 7.2 Identification of potential tsunami source 8 7.3 Model building 8 7.4 Model verification 9 7.5 Numerical calculation of tsunami 9 7.6 Tsunami risk assessment and zoning 9 7.7 Analysis of Tsunami Inundation Risk and Emergency Evacuation 10 7.8 Results Mapping 10 7.9 Evaluation report preparation 10 8 Results management 10 8.1 Review and acceptance 10 8.2 Achievement summary and management 10 8.3 Update 10 Appendix A (informative) OKADA dislocation model 11 Appendix B (Informative) Tsunami Numerical Model 12 Appendix C (Normative) Technical Report Format Requirements for Tsunami Disaster Risk Assessment and Zoning 14 Appendix D (Normative) Reference Table 16 for the relationship between land use and the vulnerability of important and prone secondary disaster-bearers Appendix E (Normative) Instructions for the compilation of the tsunami disaster inundation risk map and emergency evacuation map 19 Reference 21

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. This document is part 3 of HY/T 0273.HY/T 0273 has released the following parts. ---Part 1.Storm surge; ---Part 3.Tsunami; ---Part 5.Sea level rise. This document was proposed by the Ministry of Natural Resources of the People's Republic of China. This document is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283). Drafting organizations of this document. National Marine Environmental Forecasting Center, Zhejiang Marine Monitoring and Forecasting Center. The main drafters of this document. Yu Fujiang, Hou Jingming, Yuan Ye, Zhao Lianda, Wang Peitao, Wu Wei, Che Zhumei, Gao Yi, Wang Juncheng.

Introduction

Marine disaster risk assessment and zoning are important basic tasks for marine disaster prevention and mitigation, and effective response to marine disasters for local governments at all levels And planning and layout of coastal economic and social development has an important guiding role. HY/T 0273 is to guide governments at all levels to carry out marine disaster risk Basic and universal industry standards for assessment and zoning work. In view of the length of the document and the mechanism and cause of various marine disasters The reasons are different, HY/T 0273 is proposed to be composed of 5 parts. ---Part 1.Storm surge; ---Part 2.Waves; ---Part 3.Tsunami; ---Part 4.Sea ice; ---Part 5.Sea level rise. Technical Guidelines for Marine Disaster Risk Assessment and Zoning Part 3.Tsunami

1 Scope

This document stipulates the working principles, technical methods and results management of tsunami disaster risk assessment and zoning. This document is applicable to tsunami disaster risk assessment and zoning work.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB/T 21010-2017 Classification of land use status HY/T 058 Operational specification for ocean survey, observation and monitoring archives

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Tsunami The fierce and extremely harmful waves are formed by long waves caused by submarine earthquakes, volcanic eruptions or underwater collapses and landslides. [Source. GB/T 15920-2010, 2.5.60, with modification] 3.2 Local tsunami A tsunami that is within 100km of the area affected by the devastating effect of the tsunami. 3.3 Regional tsunami A tsunami within 1000km of the area affected by the tsunami from the source of the tsunami. 3.4 Ocean-widetsunami Remote tsunami A tsunami whose source is more than 1000km away from the area affected by the tsunami. 3.5 Traveltime The time required for the first wave of a tsunami to propagate from the source of the tsunami to a fixed point on the coast. 3.6 Traveltimemap A graph showing the isochron of tsunami propagation.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of HYT0273.3-2021_English be delivered?

Answer: Upon your order, we will start to translate HYT0273.3-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of HYT0273.3-2021_English with my colleagues?

Answer: Yes. The purchased PDF of HYT0273.3-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information