HJ 790-2016: Technical guidelines for environmental protection in polyester industry for check and accept of completed project
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
HJ 790-2016English759 Add to Cart 5 days [Need to translate] Technical guidelines for environmental protection in polyester industry for check and accept of completed project Valid HJ 790-2016

PDF similar to HJ 790-2016


Standard similar to HJ 790-2016

GB 22128   GB 8702   HJ 607   HJ 792   HJ 793   HJ 791   

Basic data

Standard ID HJ 790-2016 (HJ790-2016)
Description (Translated English) Technical guidelines for environmental protection in polyester industry for check and accept of completed project
Sector / Industry Environmental Protection Industry Standard
Classification of Chinese Standard Z05
Word Count Estimation 33,319
Date of Issue 2016-03-29
Date of Implementation 2016-07-01
Quoted Standard GB 3096; GB 5468; GB 12348; GB 18597; GB 18599; HJ 2025; HJ/T 55; HJ/T 91; HJ/T 92; HJ/T 194; HJ/T 373; HJ/T 397; HJ 493; HJ 494; HJ 495; HJ 630
Regulation (derived from) Ministry of Environmental Protection Announcement No
Issuing agency(ies) Ministry of Ecology and Environment

HJ 790-2016: Technical guidelines for environmental protection in polyester industry for check and accept of completed project


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical guidelines for environmental protection in polyester industry for check and accept of completed project National Environmental Protection Standard of the People 's Republic of China Technical specification for acceptance of environmental protection for construction project completion Polyester Technical guidelines for environmental protection for polyester industry project for Check and accept of completed construction project 2016-3-29 released 2016-7-1 implementation Ministry of Environmental Protection released Directory

Foreword

1 Scope of application 1 2 normative reference document 1

3 Terms and Definitions

4 General .2

5 technical requirements for the acceptance phase

6 Preparation of acceptance of technical programs

7 Implementation of acceptance of technical programs 13 8 Preparation of acceptance technical report (table) 13 Appendix A (Normative Appendix) Acceptance Monitoring Program, Report Layout and Content Appendix B (informative) Overview of the main process flow Appendix C (informative) Acceptance monitoring program, report refer to Figure.25

Foreword

In order to implement the Environmental Protection Law of the People's Republic of China, the Environmental Impact Assessment Law of the People's Republic of China, Environmental protection management regulations, "the implementation of the" completion of construction projects environmental protection acceptance management approach "to protect the ecological environment, norms Polyester construction project completed environmental protection and acceptance work, the development of this standard. This standard specifies the polyester construction project completion of environmental protection and acceptance of technical work procedures, the overall requirements, acceptance technology side Case and acceptance technical report preparation requirements. Appendix A of this standard is a normative appendix, Appendix B and Appendix C are informative appendices. This standard is the first release. This standard is organized by the Ministry of Environmental Protection Science and Technology Standards Division. The drafting of this standard. Nanjing Environmental Monitoring Center Station. This standard is approved by the Ministry of Environmental Protection on March 29,.2016. This standard has been implemented since July 1,.2016. This standard is explained by the Ministry of Environmental Protection. Construction project completed environmental protection acceptance technical specifications polyester

1 Scope of application

This standard specifies the polyester construction project completion of environmental protection and acceptance of technical work procedures, the overall requirements, acceptance technology side Case and acceptance technical report preparation requirements. This standard applies to the completion of polyester production and construction projects of environmental protection and acceptance work. This standard does not apply to renewable polyester production and construction projects.

2 normative reference documents

The contents of this standard refer to the following documents or the terms of the following. Those who do not note the date of the reference file, the effective version of the appropriate For this standard. GB 3096 sound environmental quality standards Test method for boiler smoke and dust Standard for Environmental Noise Discharge of Industrial Enterprises Standard for Control of Pollutants in Hazardous Waste Storage Standard for Pollution Control of Storage and Disposal Site for General Industrial Solid Waste Determination of particulate matter and sampling method of gaseous pollutants in exhaust gas of fixed pollution sources GB/T 16157 Technical specification for storage and transportation of hazardous wastes Technical Guidelines for Unorganized Emissions Monitoring of Air Pollutants Technical specification for surface water and wastewater monitoring Technical specification for monitoring total water pollutant discharge Technical specification for manual monitoring of ambient air quality HJ/T 373 fixed pollution source monitoring quality assurance and quality control technical specifications (Trial) Technical specification for HJ/T 397 fixed source exhaust gas monitoring Technical specification for preservation and management of samples of water quality SJ Technical guidance for water quality sampling of HJ/T 494 Technical Guidance for Design of Water Quality Sampling Scheme for HJ/T 495 Technical Guidelines for Environmental Monitoring Quality Management "Notice on the Relevant Issues concerning the Supervision and Management of the Acceptance and Acceptance of Environmental Protection Facilities for Construction Projects" (State Environmental Protection Administration Ring hair (2000) 38)

3 terms and definitions

The following terms and definitions apply to this standard. 3.1 polyethylene terephthalate This standard refers to the purified terephthalic acid (Purified Terephthalic Acid, PTA) and ethylene glycol (Ethylene Glycol, EG) is subjected to polycondensation reaction to produce polyethylene glycol terephthalate (PET). 3.2 polyester polyester Refers to the macromolecular backbone of the chain through the ester-linked fiber-polymerized synthetic fiber, the scientific name poly-p-xylene Ethyl glycol ester fiber, that is, polyester fiber, commonly known as polyester. Polyester includes polyester staple fiber and polyester filament, polyester filament main Including Polyester Pre-Oriented Yarn (POY), Fully Drawn Yarn (FDY), Stretch Draw Texturing Yarn (DTY). 3.3 polyester manufacturing polyester manufacluring Refers to the direct esterification of terephthalic acid to produce polyester and polyester as raw material to produce polyester activities. 3.4 effluent volume Refers to the amount of wastewater discharged by a production facility or enterprise outside the legal boundary of the enterprise, including direct or indirect relationship with production Of various effluent effluents (such as factory sewage, cooling wastewater, flushing wastewater, filtration wastewater, plant boilers and power station drainage Wait). 3.5 production conditions Refers to the state of the production plant or facility operation, including normal production conditions and abnormal production conditions. Normal production conditions The condition of the production plant or facility in accordance with the design process parameters is stable. Abnormal production conditions refer to production equipment or facilities Vehicle, downtime, maintenance or process parameters when the instability of the production state.

4 General

4.1 Acceptance requirements 4.1.1 on the staging of construction, phased production of polyester manufacturing and construction projects, can be carried out in phases. For staging Construction projects, environmental protection facilities should meet the operational requirements of the stage. 4.1.2 The overall acceptance should be stable in the working conditions, the production load to achieve the design load of more than 75% (including 75%), environmental protection Normal operation of the case. If the production load is less than 75%, is a stage acceptance. 4.2 Acceptance period and scope 4.2.1 According to the characteristics of polyester manufacturing and construction projects, the period of acceptance monitoring and investigation is mainly carried out during the trial production period. 4.2.2 The acceptance scope is in principle consistent with the scope of environmental impact assessment. When the actual project content or the environment changes, or When the environmental impact assessment fails to fully reflect the environmental impact, the scope of work should be adjusted accordingly. When the actual construction content is significant When the change is made, it shall be checked and approved after the supplement to the EIA. 4.3 acceptance evaluation criteria 4.3.1 In principle, the evaluation criteria for the environmental impact assessment document of the construction project and its approval documents shall be used as the acceptance evaluation standard. 4.3.2 The revised or newly developed environmental quality standards, pollutant discharge standards, the use of revised or newly developed environmental quality The amount of standards, pollutant discharge standards as the acceptance of inspection standards. 4.3.3 The environmental impact assessment document and its approval documents are not required, refer to the current national, local and industry standards Or foreign standards. 4.3.4 At this stage there is no environmental protection criteria, but the corresponding factor in the EIA report to make an assessment, should be based on the EIA Report evaluation, if the EIA report is not evaluated, according to the actual situation analysis. 4.4 Acceptance of technical work principles and methods 4.4.1 According to the characteristics of each polyester manufacturing and construction projects closely linked to the recommendations of the EIA and its approval requirements. 4.4.2 using data research, field survey, on-site monitoring and investigation methods to carry out acceptance of technical work. 4.4.3 monitoring, investigation process and the use of technical methods should be consistent with the relevant national regulatory requirements. 4.5 Acceptance of technical procedures and content Polyester construction project completed environmental protection acceptance technical work, including preparation, preparation of acceptance technology program, the implementation of acceptance technology Technical program and the preparation of acceptance of technical reports (table) four stages. Acceptance of technical work procedures shown in Figure 1. Figure 1 polyester construction project completed environmental protection acceptance technical working procedures Preparation of acceptance technology program engineering Profile Pollution sources and Governance measures Acceptance evaluation standard Acceptance monitoring

content

Analysis method and Quality assurance Environmental management an examination Public opinion survey Preparation Phase Data collection, analysis, Site survey Implementation of acceptance technology program Site monitoring and investigation Monitoring data and surveys Result finishing Preparation of Acceptance Technical Report (Table) Condition analysis Quality control and Quality assurance Monitoring results Analysis and evaluation Results of the survey Analysis and evaluation Monitoring conclusions And recommendations Technical Reports annex 4.5.1 preparation phase Data collection, analysis, site survey and so on. 4.5.2 Preparation of acceptance technology program stage In the access to relevant information, on-site investigation on the basis of determining the scope of acceptance, acceptance evaluation criteria, acceptance monitoring and inspection Check the contents of the investigation. 4.5.3 Implementation of acceptance technology program stage According to the acceptance of technical programs to determine the content of the work to monitor and investigate. 4.5.4 Preparation of acceptance technical report (table) stage Summary monitoring data and survey results, analysis and evaluation concluded that the acceptance of technical reports (table) form reflects the construction Project completion of environmental protection acceptance monitoring, the results of the survey, as the construction project completed environmental protection acceptance of technical basis. 4.6 Acceptance of technical results and report form 4.6.1 Preparation of environmental impact report of the polyester manufacturing project to accept the monitoring report form report monitoring and investigation results. 4.6.2 Preparation of environmental impact report form of polyester manufacturing projects to check the form of monitoring reports to monitor and investigate the results.

5 Acceptance stage technical requirements

5.1 Data collection and analysis 5.1.1 Data collection 5.1.1.1 File report data A) the construction project environmental impact assessment documents and environmental protection departments at all levels of the approval of the views; B) changes in the design and construction of the construction project and the corresponding approval documents; C) preliminary design of the construction project (environmental protection articles); D) the construction project approval, trial production approval (except for trial production approval) and so on. 5.1.1.2 Profile information Construction project location map, plant layout plan (should be marked with the main source of pollution and plant surrounding environment Condition, drainage network, environmental sensitive point distribution, etc.), the project location wind direction rose map, material and water balance map, production workers Art flow and pollution generated schematic diagram, pollution treatment process flow chart, the main management facilities design drawings. 5.1.1.3 Environmental management information A) Construction unit Environmental protection organization, environmental management system; B) Construction unit Environmental protection facilities Operation desk account; Sewage access control materials; Solid waste account, solid waste entrusted handling treatment (Or contract) and the qualification certificate of the entrusted party; C) daily environmental monitoring plan; D) the implementation of environmental risk prevention measures/facilities, emergency environmental contingency plans and filing documents; E) documents relating to environmental sensitive points, approval documents, supporting documents and other relevant documents, such as demolition certificate; F) Environmental supervision report (EIA approval required). 5.1.2 Data analysis The technical information collected for finishing, research, familiar with and master the following. 5.1.2.1 Construction content and scale Including the construction of the main works, public works and environmental protection projects and the scale of the construction. Change, expansion project should be identified "to New with the old, the total reduction "and other specific requirements. 5.1.2.2 Production Process and Pollution Analysis Including major raw and auxiliary materials, intermediate products, main products and by-products. Analyze exhaust gas, waste water, solid waste according to production process Noise, etc., the main pollution factors, the corresponding supporting governance facilities, processing technology and emissions to the scene, the implementation of the scene Key points of exploration. 5.1.2.3 Total layout of plant area Including the plant waste, organized, unorganized emission sources, waste water treatment unit of the device imports, exports, the total discharge of waste water, Rain, noise, vibration and other specific location. It is planned to organize the emission of non - organized, organized discharge monitoring points, waste water, rainwater Emission monitoring point, the factory boundary noise, vibration monitoring point. 5.1.2.4 Environmental sensitive points Including the acceptance of water bodies, atmospheric sensitive points, noise sensitive points and solid waste may cause secondary pollution protection objectives, indeed Whether it will involve the necessary environmental quality monitoring survey. 5.1.2.5 Environmental management of construction projects Including the establishment of environmental management agencies and the establishment of environmental rules and regulations, the establishment of environmental protection monitoring stations and daily monitoring plan, Disposal of solid waste disposal requirements, and environmental protection investment plans (including environmental protection facilities, measures, monitoring equipment Etc.) list statistics to be reconnaissance on site. 5.2 Site survey 5.2.1 Main engineering survey The production process of the production equipment, the main raw and auxiliary materials storage and use, the distribution of pollution sources, the main pollution Child and discharge. The specific production process is shown in Appendix B, Figures B.1-B.4. A) slurry mixing process Investigation of the production and treatment of particulate matter, acetaldehyde and ethylene glycol exhaust gas. B) Esterification step The type of the process tower, the type of condenser, the type of tail gas scrubber and the type of heat medium furnace, the amount of ethylene glycol recovered, the ester Steam stripping waste water, tail gas scrubber condensate, tail gas scrubber, heat medium furnace exhaust gas generation and treatment. C) polycondensation process To investigate the composition of the extender, the composition of the catalyst, the recovery of the ethylene glycol, the generation of the condensed wastewater, the generation of the exhaust gas Situation. D) melt filtration process Investigate the type of melt filter, the generation and handling of waste melts. E) pelletizing process Investigation of the production and treatment of waste polyester. F) before spinning process And investigate the generation and treatment of organic waste gas in the spinning process. G) post-processing step Investigate the generation, treatment and discharge of waste gas, oil sumps, heating tanks and heat-setting sections, the generation of waste filaments, and Deal with the situation. 5.2.2 public auxiliary engineering survey Investigation of water supply, water supply, steam supply; boiler or thermal oil furnace model, evaporation, quantity and operating load, Chimney number and height; view and investigate the type of fuel, quality, origin, dosage. 5.2.3 Investigation of pollution sources and environmental protection facilities 5.2.3.1 Exhaust gas Organized emissions. Exhaust gas, major pollution factors, treatment facility process and design and handling efficiency, exhaust Quantity/height, the same type of exhaust pipe spacing, processing facilities entrance, exhaust cylinder size. Exhaust gas discharge port standardized monitoring hole settings; online monitoring system installation, daily operation and maintenance management. The main pollution factors for unorganized emissions, the geographical conditions and meteorological conditions for unorganized emissions monitoring. 5.2.3.2 Wastewater Production of waste water and domestic sewage. emissions, the main pollution factors and emissions to the sewage treatment station construction scale and If the waste water into the centralized sewage treatment plant, should be based on the actual situation of centralized sewage treatment plant construction scale and Processing process to investigate; Sewage diversion, rain and sewage diversion implementation of the situation; sewage reuse, the initial rainwater collection, accident emergency pool construction and Switching measures; Waste water discharge standard setting; online monitoring system installation, the daily operation and maintenance management. 5.2.3.3 Solid waste General sources of waste (waste silk, waste, waste packaging materials, household waste, etc.) of the source, type, quantity, processing Set to go. Whether the storage site to meet the requirements of GB 18599, the disposal site may cause soil, groundwater secondary pollution, ring Determination of sensitive targets for environmental protection. Source of Hazardous Waste, Type, Quantity, Disposal of Disposal and Hazardous Waste Transfer. Whether the storage field is consistent GB 18597 requirements. If the project supporting the construction of hazardous waste disposal facilities, should also be in accordance with the relevant technical specifications such as HJ 2025 check Check its processing technology, anti-seepage measures, operation and management of the content. 5.2.3.4 Noise/vibration Survey noise/vibration (spinning machine, water pump, boiler fan, air compressor, sewage treatment station Roots blower, etc.) source, Control of the facility, the specific location of the sound source in the plant layout and the distance from the plant's external noise protection sensitive target. 5.2.3.5 Site survey of environmental protection facilities Polyester manufacturing and construction projects on-site investigation of environmental protection facilities refer to Table l. Table 1 List of site survey contents of environmental protection facilities for polyester construction projects Source of pollution investigation site (1) Gaseous pollution sources and environmental protection facilities Organized Source of emissions Polyester PTA silo, craft tower, glycol back Receiving device, air stripping tower, tail gas scrubber, Heat furnace and so on Exhaust gas source of the device type, quantity, capacity and operating load, exhaust gas Emissions, the main pollution factor, waste gas treatment process and design and processing efficiency, Discharge mode, the number of exhaust pipes, height, the same type of exhaust pipe spacing, Processing facilities entrance, exhaust cylinder size, standardized monitoring hole settings, Site monitoring conditions; investigate the type of fuel, quality, origin, dosage. Polyester Oil, oil immersion, heating and other sections, spinning Silk fumes and other oil-producing tail gas, heat Media furnace and so on Unorganized Source of emissions Polyester Slurry configuration, hot wells, vacuum systems, Ethylene glycol tank and so on Exhaust gas source of the production capacity and operating load, the main pollution factor, monitoring Geographical conditions and meteorological conditions. Polyester workshop with oil tail gas (2) Water pollution sources and environmental protection facilities Production waste Polyester Ester stripping wastewater, tail ...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of HJ 790-2016_English be delivered?

Answer: Upon your order, we will start to translate HJ 790-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of HJ 790-2016_English with my colleagues?

Answer: Yes. The purchased PDF of HJ 790-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.