|
US$559.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ34124-2017: General specifications for intelligent protection and control equipment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 34124-2017 | English | 559 |
Add to Cart
|
5 days [Need to translate]
|
General specifications for intelligent protection and control equipment
| Valid |
GB/Z 34124-2017
|
PDF similar to GBZ34124-2017
Basic data | Standard ID | GB/Z 34124-2017 (GB/Z34124-2017) | | Description (Translated English) | General specifications for intelligent protection and control equipment | | Sector / Industry | National Standard | | Classification of Chinese Standard | K45 | | Classification of International Standard | 29.240.01 | | Word Count Estimation | 28,229 | | Date of Issue | 2017-07-31 | | Date of Implementation | 2018-02-01 | | Quoted Standard | GB/T 191; GB/T 2887-2011; GB/T 2900.1; GB/T 2900.17; GB/T 2900.49; GB/T 4208; GB/T 4798.2; GB/T 7261-2016; GB/T 9361-2011; GB/T 11287-2000; GB/T 13384; GB/T 13729-2002; GB/T 13850; GB/T 14285-2006; GB/T 14537; GB/T 14598.2-2011; GB/T 14598.26-2015 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the technical requirements, test methods, inspection rules and marking, packaging, transportation and storage requirements of the intelligent protection and control equipment for substation, including conventional protection and control devices and intelligent substation protection and control devices (hereinafter referred to as "devices"). This standard is suitable for 110kV and below the voltage level substation in the intelligent protection and control equipment, and as the device development, design, manufacture, testing and operation basis. |
GBZ34124-2017: General specifications for intelligent protection and control equipment---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General specifications for intelligent protection and control equipment
ICS 29.240.01
K45
People's Republic of China national standardization of technical guidance documents
Intelligent protection monitoring and control equipment technical specifications
2017-07-31 Posted
2018-02-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 technical requirements 2
4.1 Environmental conditions 2
4.2 Rated electrical parameters 3
4.3 overload capacity 4
4.4 Power consumption 4
4.5 Structure and appearance 4
4.6 Functional Requirements 5
4.7 Performance Requirements 10
4.8 Safety Requirements 12
4.9 Insulation performance 12
4.10 Electromagnetic compatibility performance 12
4.11 resistance to heat and humidity 13
4.12 Mechanical Properties 13
4.13 continuous power 13
5 test methods 13
5.1 Test conditions 13
5.2 high and low temperature test 14
5.3 temperature storage test 14
5.4 overload test 14
5.5 power consumption test 14
5.6 DC power supply impact test 14
5.7 outlet relay test 14
5.8 device function requirements 14
5.9 Communication and Protocol Tests 14
5.10 device performance test 19
5.11 Safety Requirements Test 19
5.12 Insulation Performance Test 19
5.13 Electromagnetic compatibility performance test 19
5.14 Humidity resistance test 20
5.15 Mechanical Performance Test 20
5.16 continuous power test 21
5.17 Structure and appearance inspection 21
5.18 shell protection 21
6 Inspection rules 21
6.1 Test classification 21
6.2 factory inspection 21
6.3 type test 22
7 Marking, Packaging, Transport and Storage 23
7.1 mark 23
7.2 Packaging 23
7.3 Transportation 23
7.4 Storage 23
8 product accompanying documents 23
9 Quality Assurance 24
Foreword
This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009.
This guidance document is proposed by China Electrical Equipment Industry Association.
This Guidance Document is governed by the National Technical Committee for Standardization of Relays and Protective Equipment (SAC/TC154).
The drafting of the guidance of technical documents. Beijing Sifang Automation Co., Ltd. Jisheng Electronics Co., Ltd., Xuchang open
General Electric Research Institute, Nanjing NARI Insurance Co., Ltd., Xu Ji Electric Co., Ltd., Harbin Electric Group Co., Ltd. Acheng Relay
Responsible company, Xuchang Cape Detection Technology Co., Ltd., State Grid Hebei Electric Power Company, China Electric Power Research Institute, State Power Nanjing Automation Unit
Co., Ltd., Beijing Ziguang Measurement and Control Co., Ltd., Evergreen Shenzhen Rui Bao Automation Co., Ltd., State Grid Electric Power Research Institute, Oriental Electronics
Co., Ltd., Zhuhai Wanlida Electric Automation Co., Ltd., Hebei Beheng Electric Technology Co., Ltd., Jiangsu Jinzhi Technology Co., Ltd.
Division, ABB (China) Co., Ltd., Schneider Electric (China) Co., Ltd., Siemens Power Automation Co., Ltd.
The main drafters of this technical guidance document. Song boat, Wei Xin, Yang Huixia, Xiong Muwen, Ni Chuankun, Chen Cheng, Chen Ming, Ren Jiangbo, Ai Shuyun,
Yao Liang, Ge Rong Shang, Liu Hongjun, Yu Bo, Quan Xianjun, Zhu Zhiwei, Yang Chunli, Zengbing Yuan, Li Zhixiu, Xu Chenliang, Zhang excited, Zheng Peng.
Intelligent protection monitoring and control equipment technical specifications
1 Scope
This Guidance Technical Document specifies the substation intelligent protection monitoring and control equipment, including conventional protection and monitoring devices, smart substation protection and control
Equipment (hereinafter referred to as the device) technical requirements, test methods, inspection rules and signs, packaging, transportation and storage requirements.
This guideline is applicable to intelligent protection and control equipment in 110kV and below substations
Development, design, manufacture, test and operation of the basis.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
General specifications for computerized premises GB/T 2887-2011
GB/T 2900.1 Electrotechnical terminology Basic terms
GB/T 2900.17 Electrotechnical terminology measuring relays
GB/T 2900.49 Electrotechnical terminology Power system protection
GB/T 4208 enclosure protection (IP code)
GB/T 4798.2 electrical and electronic products application environmental conditions transportation
Basic test methods for protection and safety automatic devices GB/T 7261-2016
GB/T 9361-2011 Calculation of station site safety requirements
GB/T 11287-2000 Electrical relays - Part 21. Vibration, shock, bump and earthquakes of measuring relays and protection devices
Test Part 1. Vibration test (sine)
GB/T 13384 mechanical and electrical product packaging General technical conditions
Telecontrol terminal equipment
GB/T 13850 AC power conversion to analog or digital signal of the electrical measurement transmitter
Technical specifications for relay protection and safety automatic devices
Shock and collision tests for measuring relays and protection equipment
Measuring relays and protection equipment - Part 1. General requirements GB/T 14598.2-2011
GB/T 14598.26-2015 Measuring relays and protection equipment - Part 26. EMC requirements
GB/T 14598.27-2008 Measuring relays and protection equipment - Part 27. Product safety requirements
Electromagnetic compatibility (EMC) - Testing and measurement techniques - Pulsed magnetic field immunity test
GB/T 17626.10-1998 Electromagnetic compatibility Testing and measurement techniques Shock magnetic field immunity test
GB/T 19520.12 electronic equipment mechanical structure 482.6mm (19in) series mechanical structure size 3-101 section.
And its plug-ins
Transformers - Part 7. Electronic voltage transformers
Transformers - Part 8. Electronic current transformers
GB/T 21711.1 Basic electromechanical relays - Part 1. General and safety requirements
GB/T 25919.1 Modbus test specification Part 1. Modbus serial link conformance test specification
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ34124-2017_English be delivered?Answer: Upon your order, we will start to translate GBZ34124-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ34124-2017_English with my colleagues?Answer: Yes. The purchased PDF of GBZ34124-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|