HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 34121-2017 English PDF

US$839.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 34121-2017: Technical specification for relay protection configuration tool in smart substation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 34121-2017English839 Add to Cart 7 days [Need to translate] Technical specification for relay protection configuration tool in smart substation Valid GB/T 34121-2017

PDF similar to GB/T 34121-2017


Standard similar to GB/T 34121-2017

GB/T 38953   GB/T 37155.2   GB/T 19826   GB/T 34123   GB/T 34122   

Basic data

Standard ID GB/T 34121-2017 (GB/T34121-2017)
Description (Translated English) Technical specification for relay protection configuration tool in smart substation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K45
Classification of International Standard 29.240
Word Count Estimation 42,472
Date of Issue 2017-07-31
Date of Implementation 2018-02-01
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 34121-2017: Technical specification for relay protection configuration tool in smart substation


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for relay protection configuration tool in smart substation ICS 29.240 K45 National Standards of People's Republic of China Technical Specifications of Intelligent Substation Relay Protection Configuration Tools 2017-07-31 Posted 2018-02-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Abbreviations 1 5 General 2 6 Configuration Tool Technical Requirements 2 7 Conformance test 5 Appendix A (Informative) Test Case Step 10

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents. This standard proposed by the China Electricity Council and centralized. This standard drafting unit. State Grid Zhejiang Power Dispatching Control Center, the State Power Dispatching Control Center, Zhejiang Electric Power Research Institute, in China Southern Power Grid Power Dispatching Control Center, Shandong Power Dispatching Control Center, Guangdong Power Dispatching Control Center, China Electric Power Research Institute, Jiangsu Electric Power Research Institute, North China Electric Power Design Institute Co., Ltd., Guangdong Electric Power Design Institute, State Power Nanjing Automation Co., Ltd., Nanjing NARI Following Paul Engineering Ltd., Beijing Sifu Automation Co., Ltd., Xu Ji Electric Co., Ltd., Evergreen Park Rui Ji Automation Co., Ltd., Dongfang Electronics Co., Ltd., Siyuan Electric Co., Ltd., State Power NARI Technology Co., Ltd., Beijing Bo Li Xinli Electric Co., Ltd., Xuchang Cape Detection Technology Co., Ltd., South Germany will Group. The main drafters of this standard.Wang Song, Qiu Yu Tao, Zhou Hongyang, Xu Peng, Zhang Dao Nong, Jia Hongzhou, Ye Xiang, Zhao Xinchun, Dong Bei, Zhang Qiao Bin, Liu Kun, Tang Yi, Luo Keyu, Gao Jie, Zhao Xicai, Zhang Yinhuai, Zeng Shengwu, Medde, Zhao Yingke, Feng Jun, Quan Xianjun, He Chun, Yang Yi, Liu Hongjun, Li Yanjun, Gao Lei, forward. Technical Specifications of Intelligent Substation Relay Protection Configuration Tools

1 Scope

This standard specifies the technical requirements and conformance testing of the relevant configuration tools for intelligent substation using DL860 standard content. This standard applies to the DL860 standard smart substation secondary equipment and configuration tools development, testing and automation systems Engineering Applications.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. IEC 61850 Engineering Application Model for Relay Protection GB/T DL860 (all parts) Substation Communication Network and System

3 Terms and definitions

DL860 (all parts) as defined by the following terms and definitions apply to this document. 3.1 Systemconfigurator IED communication among processing systems, multiple IED universal attribute configurations, and logical association between IED function blocks and monitored process layers Tool of. Note. The system configuration tool is a tool that is independent of the IED. It imports and exports DL860 standard definition of the configuration file, in accordance with the system layer configuration Need to import ICD files for several IEDs, configure system information shared by different IEDs, generate substations that comply with the DL860 series of standards SCD file. The SCD file is fed back to the IED configuration tool as a system dependent IED configuration. The system configuration tool should be able to read SSD files, for example As a starting system configuration, or with the same substation system has been implemented for comparison. 3.2 IED Configurator IEDconfigurator Specific configuration and download tools that handle their specific configuration data for a particular type of IED. Note. The CONFIG tool is a manufacturer-specific tool. The tool to import and export DL860 series of standard definition of the document, providing IED-specific settings, resulting IED specific profile and download the profile to the IED.

4 Abbreviations

The following abbreviations apply to this document. CAD Computer Aided Design (ComputerAidedDesign) CID IED instance configuration description (ConfiguredIEDDescription) CRC Cyclic Redundancy Check (CyclicRedundancyCheck) GOOSE Generic Object Oriented Substations Events (GenericObjectOrientedSubstationevents) ICD IED Capability Description (IEDCapabilityDescription)

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 34121-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 34121-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 34121-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 34121-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.