HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GBZ33875-2017 English PDF

US$1159.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ33875-2017: Guidelines for the use of GB/T 2624-2006
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/Z 33875-2017English1159 Add to Cart 7 days [Need to translate] Guidelines for the use of GB/T 2624-2006 Valid GB/Z 33875-2017

PDF similar to GBZ33875-2017


Standard similar to GBZ33875-2017

GB/T 778.4   GB/T 778.1   GB/T 21117   GB/T 42567.5   GB/T 45124   

Basic data

Standard ID GB/Z 33875-2017 (GB/Z33875-2017)
Description (Translated English) Guidelines for the use of GB/T 2624-2006
Sector / Industry National Standard
Classification of Chinese Standard N12
Classification of International Standard 17.120.10
Word Count Estimation 58,521
Date of Issue 2017-07-12
Date of Implementation 2018-02-01
Quoted Standard GB/T 2624.1-2006; GB/T 2624.2-2006; GB/T 2624.3-2006; GB/T 2624.4-2006; ISO 2186; ISO 4006; ISO/TR 3313-1998
Adopted Standard ISO/TR 9464-2008, IDT
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the use of GB / T 2624-2006 (all parts) GB / T 2624-2006 is a circular pipe in the contraction caused by the pressure difference based on the measurement of national standards (see GB / T 2624.1-2006 5.1). It is based on the field of flow measurement theory and experimental work put forward a series of requirements and requirements. For more information on the scope, see Chapter 1 of GB / T 2624.1-2006. The definitions and symbols applicable to this standard are found in Chapter 3, Chapter 4 of GB / T 2624.1-2006. GB / T 2624.1-2006 and this standard do not discuss the details of the theoretical background, the relevant content can refer to other fluid flow on the textbook. Press GB / T

GBZ33875-2017: Guidelines for the use of GB/T 2624-2006

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guidelines for the use of GB/T 2624-2006 ICS 17.120.10 N12 People's Republic of China national standardization of technical guidance documents Guidance for use GB/T 2624-2006 (ISO /T R9464.2008, Guidelinesfortheuse of ISO 5167.2003, IDT) 2017-07-12 Posted 2018-02-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 The corresponding relationship between this guide and GB/T 2624 (all parts) 2 5 GB/T 2624-2006 (all parts) user guide 2 5.1 GB/T 2624.1-2006 Guidelines for use 2 Guide for use GB/T 2624.2-2006 Guide for use GB/T 2624.3-2006 Guide for use GB/T 2624.4-2006 6 General information relevant to the application of GB/T 2624-2006 (all parts) 20 6.1 Secondary device 20 6.2 Measurement of pressure and differential pressure 22 6.3 Temperature Measurement 25 6.4 Determination of density 29 6.5 Power and Electrical Equipment 33 Appendix A (informative) measurement and calculation principle 34 Appendix B (Informative) Calculation of Natural Gas Compressibility 46 Appendix C (informative) orifice assembly 47 References 55

Foreword

This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document uses the translation method equivalent to ISO /T R9464.2008, "ISO 5167-2003, User Guide". My documents related to the consistency of normative references in this document are as follows. --- GB/T 17611-1998 Measurement of fluid flow in closed conduits Terms and symbols (ISO 4006.1991, IDT) --- GB/T 26801-2011 Fluid flow in closed pipes Connection of pressure signal transmission between primary and secondary units Act (ISO 2186.2007, IDT) The following editorial changes have been made to this technical document. --- Change the file name to "GB/T 2624-2006 User Guide". This guidance document corrects editorial errors in ISO /T R9464.2008. --- 6.3.5f) Refer to 6.1.9 of GB/T 2624.1-2006 to refer to its 7.1.7; --- Figure 16, Figure C.7, Figure C.8, the orifice plus two vertical lines; --- Figure A.1 ~ Figure A.4 flow chart, the criteria En plus absolute symbols, changed to | En |. This guidance document is proposed by China Machinery Industry Federation. This Guidance Document is governed by the National Technical Committee for Measurement, Control and Automation of Industrial Processes (SAC/TC124). The guiding technical document is drafted by Shanghai Institute of Industrial Automation Instrumentation. The guidance of technical documents to participate in the drafting unit. Beijing Ruipu ternary Instrument Co., Ltd., Fujian Run Precision Instrument Co., Ltd., Jiangsu Provincial Quality and Technical Supervision gas flow measurement and testing center, Jiangyin City, throttling Plant Co., Ltd., Shanghai Weier Tai Industrial Automation Co., Ltd. Company, Shenyang North Star Instrument Manufacturing Co., Ltd., Tianxin Instrument Group Co., Ltd., Tianjin billion Central Automation Instrumentation Technology Co., Ltd., Tianjin Shinco Complete Instrument Co., Ltd., Zhejiang Cangnan Instrument Group Co., Ltd. The main drafters of this technical guidance document Xiao Hong Lian, Li Minghua, Li Zhenzhong, Ge Jian, Shi Jianrong, Yan Yongfeng, Xu Zhen, Chen Ping, Tao Zhaojian, Liu Yang, Xing Ligang, Zhang Sheng Italy. Guidance for use GB/T 2624-2006

1 Scope

This Guidance Document gives guidance on the use of GB/T 2624-2006 (all parts). GB/T 2624-2006 is a circle The pressure drop caused by the contraction in the shape pipe is based on the national standard for measuring the flow (see 5.1 of GB/T 2624.1-2006). It is based on traffic measurement The amount of theory and experimental work carried out a series of rules and requirements. The details of the range see GB/T 2624.1-2006 Chapter 1. This document applies to the definition and symbols see GB/T 2624.1- 2006 Chapter 3, Chapter 4. GB/T 2624.1-2006 and this document do not discuss the theoretical background details, the content can refer to other related to the fluid flow of teaching Book. According to the provisions and requirements of GB/T 2624.1-2006, the uncertainty of the flow measurement can be achieved to about 1% of the calculated value of the flow. Before selecting the most suitable type of differential pressure device for a particular application, consider each of the types given in GB/T 2624-2006 (Parts 2 to 4) Limit the use of a device. Parts 2 to 4 also serve as a basis for preliminary design of the metrology system. GB/T 2624-2006 (parts 2 to 4) gives the detailed design, manufacture and final inspection necessary information. GB/T 2624.1-2006 does not include secondary devices, but Chapter 6 of this document made a normative reference to ISO 2186.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2624.1-2006 Measurement of full pipe fluid flow using differential pressure devices installed in circular sectioned pipes - Part 1. General Principles and requirements (ISO 5167-1.2003, IDT) GB/T 2624.2-2006 Measurement of full pipe fluid flow using a differential pressure device installed in a circular sectioned pipe - Part 2 - Orifice (ISO 5167-2.2003, IDT) GB/T 2624.3-2006 Manifold fluid flow measurement using a differential pressure device mounted in a circular sectioned pipe - Part 3. Nozzle And Venturi nozzle (ISO 5167-3.2003, IDT) GB/T 2624.4-2006 Manifold fluid flow measurement using differential pressure devices installed in circular sectioned pipes - Part 4 Ventura In tube (ISO 5167-4.2003, IDT) ISO 2186 Measurement of fluid flow in closed conduits Connection of pressure signals between primary and secondary units (Fluid flowinclosedconduits-Connectionsforpressuresignaltransmissionsbetweenprimaryandsecondary elements ISO 4006 closed pipe fluid flow measurement terms and symbols (Measurementoffluidflowinclosedcon- duits-Vocabularyandsymbols) ISO /T R3313.1998 Measurement of Fluid Flow in Closed Pipes Flow Pulse Effects on Flow Measuring Instruments (Meas- urementoffluidflowinclosedconduits-Guidelinesontheffectsofflowpulsationsonflow-meas- urementinstruments)

3 Terms and definitions

ISO 4006 defined terms and definitions apply to this document.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ33875-2017_English be delivered?

Answer: Upon your order, we will start to translate GBZ33875-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ33875-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ33875-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.