|
US$744.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ33588.8-2022: Lightning protection system components (LPSC) - Part 8: Requirements for components for isolated LPS Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 33588.8-2022 | English | 744 |
Add to Cart
|
7 days [Need to translate]
|
Lightning protection system components (LPSC) - Part 8: Requirements for components for isolated LPS
| Valid |
GB/Z 33588.8-2022
|
PDF similar to GBZ33588.8-2022
Basic data | Standard ID | GB/Z 33588.8-2022 (GB/Z33588.8-2022) | | Description (Translated English) | Lightning protection system components (LPSC) - Part 8: Requirements for components for isolated LPS | | Sector / Industry | National Standard | | Classification of Chinese Standard | K10 | | Word Count Estimation | 42,491 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GBZ33588.8-2022: Lightning protection system components (LPSC) - Part 8: Requirements for components for isolated LPS ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB /Z 33588.8-2022
Lightning protection system components (LPSC) - Part 8.Requirements for components for isolated LPS
ICS 91.120.40
CCSK10
National Standardization Guiding Technical Document of the People's Republic of China
Lightning Protection System Components (LPSC)
Part 8.Requirements for isolation components of lightning protection systems
(IEC TS62561-8.2018, IDT)
Published on 2022-07-11
2023-02-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Insulation bracket 4
4.1 Category 4
4.2 Requirement 4
4.3 Test method 6
4.4 Electromagnetic Compatibility (EMC) 15
4.5 Structure and content of test report 15
5 Insulation down conductor 16
5.1 Classification and classification 16
5.2 Lightning current carrying capacity 16
5.3 Preferred value of equivalent isolation distance se 17
5.4 Requirement 17
5.5 Test methods 18
5.6 Electromagnetic Compatibility (EMC) 27
5.7 Structure and content of test report 27
Appendix A (normative) Environmental Impact Test Corrosion Resistance 30
Appendix B (normative) Environmental impact test UV resistance 31
Appendix C (normative) Test flow chart of insulating support 32
Appendix D (normative) Test flow chart of insulated down conductors 33
Appendix E (informative) High-voltage shock test for determining the actual correction factor kx of the insulating support 34
Appendix F (Informative) Assembly Verification Test for Insulation Down-conductors 36
Reference 37
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
This document is part 8 of GB/T (Z) 33588 "Lightning Protection System Components (LPSC)". GB/T (Z)33588 has been released
The following parts.
--- Part 1.Requirements for connectors;
--- Part 2.Requirements for air-terminations, down conductors and grounding electrodes;
--- Part 3.Requirements for isolation discharge gaps (ISG);
--- Part 4.Fastener requirements for conductors;
--- Part 5.Requirements for grounding electrode detection boxes and grounding electrode seals;
--- Part 6.Requirements for lightning strike counters (LSC);
--- Part 7.Requirements for grounding resistance-reducing materials;
--- Part 8.Requirements for isolation components of lightning protection systems.
This document is equivalent to IEC TS62561-8.2018 "Lightning Protection System Components (LPSC) Part 8.Lightning Protection System Isolation"
Parts Requirements", the document type is adjusted from IEC technical specifications to my country's national standardization guiding technical documents.
The following editorial changes have been made to this document.
---According to the citation method of the text, the normative referenced document IEC 62561-2 is supplemented in the list of normative references in Chapter 2, and the
ISO 4892-3.2016 adjusted to references;
--- Corrected the error of the column item in 5.7.6, corrected the number of the column item "d) test procedure" to 5.7.7, and revised the column item e)~i) to 5.7.7
Items a)~e), the original numbers of 5.7.7~5.7.9 are extended in turn.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by the National Lightning Protection Standardization Technical Committee (SAC/TC258).
This document is drafted by. Dehesheng Electric (Shanghai) Co., Ltd., Shanghai Electric Power University, Donghua Engineering Technology Co., Ltd., Shanghai University
Xue, Xinjiang Goldwind Technology Co., Ltd., Taizhou Guilong Lightning Protection Engineering Co., Ltd., Jiangsu Tianan Lightning Protection Engineering Co., Ltd., China Standard
Standardization Association.
The main drafters of this document. Tang Xiaofeng, Bian Xiaoyan, Wang Tianyi, Li Zheng, Sheng Weiwei, Yao Ximei, Zhou Qibin, Yuan Yue, Li Rui, Liu Yan,
Guo Kaimin.
Introduction
GB/T (Z) 33588 aims to establish the various requirements for lightning protection systems (LPS) designed and installed according to the IEC 62305 series of standards.
The requirements and test methods for this component are to be composed of eight parts.
--- Part 1.Requirements for connectors. Establishes requirements and test methods for metallic connectors that form part of lightning protection systems.
--- Part 2.Requirements for air terminals, down conductors and earth electrodes. Metal conductors (not "self-
"Conductor") and the requirements and test methods for the metallic earth electrodes constituting the earthing device.
--- Part 3.Requirements for isolation discharge gaps (ISG). Establishes requirements and tests for isolation discharge gaps for lightning protection systems
method.
--- Part 4.Fastener requirements for conductors. Gold for securing and supporting conductors such as air terminals, down conductors and grounding systems is established.
Requirements and test methods for metallic, non-metallic, and composite fasteners.
--- Part 5.Requirements for grounding electrode detection boxes and grounding electrode seals. Established the ground electrode detection box (terminal box) and the ground electrode density
Requirements and test methods for seals.
--- Part 6.Lightning strike counter (LSC) requirements. Requirements and test methods for lightning strike counters are established.
--- Part 7.Requirements for grounding resistance-reducing materials. The requirements and test methods for grounding resistance-reducing materials in lightning protection systems are established.
--- Part 8.Requirements for isolation components of lightning protection systems. Established insulation brackets and insulation down conductors and their special fasteners
Requirements and test methods.
Lightning Protection System Components (LPSC)
Part 8.Requirements for isolation components of lightning protection systems
1 Scope
This document specifies the requirements and test methods for insulating supports and insulating down conductors and their special fasteners. Insulating brackets cooperate with air-termination and
Use down conductors to maintain proper separation distance; insulated down conductors can reduce the separation distance.
This document does not cover testing of insulating supports and insulating down conductors for use in explosive atmospheres.
Performance requirements and test methods for other types of isolation components of lightning protection systems are under study.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 2423.18-2021 Environmental Testing Part 2.Test Method Test Kb. Salt Spray, Alternating (Sodium Chloride Solution)
(IEC 60068-2-52.2017, IDT)
GB/T 9789-2008 Sulfur dioxide corrosion test of metals and other inorganic coatings under normal condensation conditions (ISO 6988.
1985, IDT)
GB/T 33588.1-2020 Lightning Protection System Components (LPSC) Part 1.Requirements for Connectors (IEC 62561-1.2017,
IDT)
ISO 4892-2 Plastics laboratory light source exposure test methods - Part 2.Xenon arc lamp (Plastics-Methods of exposure
Note. GB/T 16422.2-2022 Plastics Laboratory Light Source Exposure Test Method Part 2.Xenon Arc Lamp (ISO 4892-2.2013, IDT)
ISO 4892-4 Plastics—Test methods for exposure to laboratory light sources—Part 4.Open carbon arc lamps (Plastics-Methodsof
Note. GB/T 16422.4-2022 Plastics Laboratory Light Source Exposure Test Method Part 4.Open Carbon Arc Lamp (ISO 4892-4.2013, IDT)
rosionresistance)
Note. GB/T 16927.2-2013 High Voltage Test Technology Part 2.Measurement System (IEC 60060-2.2010, MOD)
IEC 60068-2-75.2014 Environmental Testing Part 2-75.Test Method Test Eh. Hammer Test (Environmental
Note. GB/T 2423.55-2006 Environmental Testing of Electrical and Electronic Products Part 2.Test Method Test Eh. Hammer Test (IEC 60068-2-75.
1997, IDT)
Note. GB/T 16896.1-2005 High Voltage Impulse Measuring Instruments and Software Part 1.Requirements for Instruments (IEC 61083.2001, MOD)
IEC 61083-2 Measuring instruments and software for high voltage and high current tests - Part 2.For impulse voltage and impulse current tests
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ33588.8-2022_English be delivered?Answer: Upon your order, we will start to translate GBZ33588.8-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ33588.8-2022_English with my colleagues?Answer: Yes. The purchased PDF of GBZ33588.8-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|