|
US$259.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 753-2012: Steam condition series for utility boilers Status: Valid GB/T 753: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 753-2012 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
Steam condition series for utility boilers
| Valid |
GB/T 753-2012
|
| GB 753-1965 | English | 199 |
Add to Cart
|
2 days [Need to translate]
|
Specification for steam boilers
| Obsolete |
GB 753-1965
|
PDF similar to GB/T 753-2012
Basic data | Standard ID | GB/T 753-2012 (GB/T753-2012) | | Description (Translated English) | Steam condition series for utility boilers | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J98 | | Classification of International Standard | 27.060 | | Word Count Estimation | 11,161 | | Quoted Standard | GB/T 321; GB/T 754; GB/T 2900.48; GB/T 5578; GB 50660; DL/T 5054; DL/T 5072 | | Regulation (derived from) | National Standards Bulletin 2012 No. 42 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the boiler steam parameters serialization requirements. This standard applies to burning fossil fuels, biomass boilers and waste incineration as well as direct-fired boiler waste heat protection, non- direct-fired heat recovery boi |
GB/T 753-2012: Steam condition series for utility boilers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Steam condition series for utility boilers
ICS 27.060
J98
National Standards of People's Republic of China
Power plant boiler steam parameters series
Issued on. 2012-12-31
2013-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points.
This standard by the Shanghai Power Equipment Research Institute is responsible for drafting, Shanghai Boiler Works, Ltd., Dongfang Boiler Co.,
Harbin Boiler Factory Co., Ltd., Beijing Babcock & Wilcox Co., Nantong Wanda Boiler Co., Ltd. and other units
Involved in the drafting.
The main drafters of this standard. Lu Xiang, Chen Xiubin, Chen Yongqi, PF Yiu Rong, Xu Yujun, Luo sound, Di Xu Ping, Xie Xianhua, Jiang Xiuhua.
Introduction
When GB/T 753-1965 release parameters of steam boiler by the state regulations. Since the 1980s, China's electricity
With only boiler station on the parameter and large capacity development, the manufacturer also added steam parameters can be modified to meet the needs of different users
need.
Follow the revision of this standard when the following three principles.
--- Adapt to specific requirements of power plant boiler, steam turbine and supporting capacity and parameters to match;
--- To meet the needs of the market transition period of development, users and manufacturers have more choice;
--- Implementation of national energy conservation policies.
Power plant boiler steam parameters series
1 Scope
This standard specifies the requirements for serialization boiler steam parameters.
This standard applies to the burning of fossil fuels, waste incineration boilers and boiler fuels and biomass direct-fired heat recovery boilers, non-direct fired
Waste heat boiler, when required, the steam parameters can refer to this standard.
NOTE. The standard refers to the boiler and condensing steam turbine for power generation or cogeneration steam turbine power station boilers.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 321 priority number and priority number system
GB/T 754 steam turbine for power generation parameters series
GB/T 2900.48 Electrotechnical terminology boiler
GB/T 5578 stationary power generation steam turbine specification
GB 50660 and medium-sized thermal power plant design procedures
DL/T 5054 thermal power plant steam piping design technical regulations
DL/T 5072 thermal power plant paint design requirements
3 Terms and Definitions
GB/T 2900.48 and GB/T 5578 defining the terms and definitions (see Appendix A) and the following terms and definitions apply to this document.
3.1
Unit rated power ratedpoweroftheunit
Steam turbine rated power as a unit rated power.
3.2
Units steam parameters steamconditionsoftheunit
The new steam turbine with a rated pressure and temperature rating as a unit steam parameters. Reheat steam parameters unit also includes re-rated
Hot temperature.
Note. The new steam known as the main steam, the main steam valve steam inlet, see GB/T 5578.
3.3
Basic series basicseries
Precedence series.
3.4
Supplement Series complementaryseries
The basic series of complementary parts.
4 unit rated power series
Unit rated power is the main basis for determining the capacity of the boiler and steam parameters.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 753-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 753-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 753-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 753-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 753-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 753-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|