Line traps for a.c. power systems
| Valid |
GB/T 7330-2008
|
| GB/T 7330-1998 | English | 919 |
Add to Cart
|
6 days [Need to translate]
|
Line traps for a. c. power systems
| Obsolete |
GB/T 7330-1998
|
| GB 7330-1987 | English | 799 |
Add to Cart
|
5 days [Need to translate]
|
Line traps for A. C. power systems
| Obsolete |
GB 7330-1987
|
PDF similar to GB/T 7330-2008
Basic data | Standard ID | GB/T 7330-2008 (GB/T7330-2008) | | Description (Translated English) | Line traps for a.c. power systems | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | M31 | | Classification of International Standard | 33.060.40 | | Word Count Estimation | 33,334 | | Date of Issue | 2008-03-25 | | Date of Implementation | 2008-10-01 | | Older Standard (superseded by this standard) | GB/T 7330-1998 | | Quoted Standard | GB 311.1-1997; GB 1094.2-1996; GB/T 5273-1985; GB 7327-1987; GB 11032-2000; GB/T 11604-1989; GB/T 16927.1-1997; GB/T 16927.2-1997; JB/T 6479-1992 | | Adopted Standard | IEC 60353-1989, NEQ | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 5, 2008 (No. 118 overall) | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the definition of the relevant traps, working conditions, requirements, testing and recommended values. This standard applies to series with the HV and EHV AC power lines in the traps. The device to prevent frequency is generally in the range of 40kHz ~ 500kHz carrier signal in the power system under various conditions occur excessive wear and tear, and to the interference from adjacent carrier minimized. This standard does not apply for other purposes in the high-voltage power line inductor and for the AC-DC converter stations traps. For AC-DC converter stations wave trap information see Appendix A. |
GB/T 7330-2008: Line traps for a.c. power systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Line traps for ac power systems
ICS 33.060.40
M31
National Standards of People's Republic of China
Replacing GB/T 7330-1998
AC power system traps
(IEC 60353. 1989, NEQ)
Posted 2008-03-25
2008-10-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Requirements 5
5 Test methods 9
6 recommended 16
Appendix A (informative) AC-DC converter station using traps 17
Annex B (informative) Supplement 19
Annex C (normative) tuning capacitor dielectric claim 22
Foreword
1989 "AC power system traps" and its 2002 Supplement to Appendix C "tuning capacitor. This standard corresponds to IEC 60353
Dielectric requirements ", with its non-equivalent.
This standard and IEC 60353. 1989 comparison, the main differences are as follows.
--- In the format, the international standard retains 30 years ago published the first edition of IEC 60353. 1971 format, and
The provisions of GB/T 1.1-2000 vary greatly. Writing rules according to our standards, the number of articles in which the cancellation, the original 1,2
Chapter merged into Chapter 1, "scope" adds Chapter 2, "Normative references", the original Chapter 3, "Symbols" and Section 2 "Definitions"
Merged into Chapter 3, "terminology, symbols and definitions", the original working conditions in Chapter 4, Section 3, "requirements" and Chapter 12 Section 4 of the original
"Nameplate" merged into Chapter 4, "requirements", the original Section 5, "test" Chapter 2 merged into Chapter 5, "test", the original Article 6
"Recommended" in Chapter 4 merged Chapter 6, "recommended." Thus, reduced from IEC 60353 23 of chapter 6, and in the provisions
Still try to keep the order of the sequence of IEC 60353 in order to check.
--- Will be listed in the original table 2, "Power System Voltage, radio interference voltage and test voltage relationship" in the power system voltage level and
Other relevant parameters to be adjusted (edition 4.8) according to the provisions of China's electric power system.
--- Referring to supplement IEC 60353, an increase of subsidiary protection element related content, as well as tuning devices and their components
(Excerpts 3.3,4.2.2,4.3 etc.).
--- Improving the level of pressure wave trap (Excerpts 5.4.1.2,5.4.2).
--- Increased the primary coil terminal requirements (this version 4.2.1).
--- Added protection for the traps to block the carrier channel resistance shunt loss calculated on the basis of recommendations (Excerpts
4.4).
--- Information about the legend of the anti-halo (Excerpts 4.11.2).
--- Deleting the contents of the original standard (5.2.1 edition) about Aldrey (one kind of Al-Mg-Si alloy) temperature coefficient.
--- In IEC 60076-5 the appropriate formula in place of the original standard equation thermometer final test performance of thermal and Table 4 (Excerpts
5.5).
--- The supplement to IEC 60353 Appendix C of this standard is attached as Appendix C. Due to limitations of the specific test conditions, the proposed appendix
The bipolar pulse capacitor test in China is still not easy to achieve this standard in order to improve temporarily traps impulse test voltage (Excerpts
5.4.1.2) and frequency tuning means test pressure (this version 5.4.2) the way to improve the level of insulation as a tuning capacitor
Transitional measures, the conditions have to be fully implemented after the IEC 60353. 1989 and its Supplementary Appendix C requirements.
This standard replaces GB/T 7330-1998 "AC power system traps."
This standard and GB/T 7330-1998 compared in terms of technical content and format, the original GB/T 7330-1998 basically retained
IEC 60353.1998 technical format and content, and in this edition made major changes, also added Appendix C, as described above. In addition,
The text in detail and also made some modifications.
The Standard Appendix A, Appendix B is an informative annex, Annex C is normative appendix.
The standard proposed by China Electricity Council.
This standard by the national electricity system, management and exchange of information Standardization Technical Committee (SAC/TC82) under the jurisdiction and interpretation.
This standard by the Beijing Electric Power Plant and Tianjin Electric Power Institute of Electrical and hydraulic equipment is responsible for drafting, Northwest Electric Power Design Institute, State Grid Nanjing Auto
Research Institute of Guangdong Power Grid Corporation participated in the drafting.
The main drafters of this standard. Guoxiang Fu, Zhu Meng Xiong, Yang Zeming, Li Shun, Chen Tao Yuan, Hu Yuwang.
AC power system traps
1 Scope
This standard specifies the definition of the relevant traps, working conditions, requirements, testing and recommendations.
This standard applies to the series with the HV and EHV AC power lines in the traps. The device to prevent frequency is generally
40kHz ~ 500kHz carrier signal within the range of occurrence of excessive losses in power system conditions, and interference from adjacent carrier
Minimized.
This standard does not apply to high-voltage power line inductor and a AC-DC converter stations traps for other purposes. For AC-DC
Information flow converter stations traps in Appendix A.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB 311.1-1997 insulation with high voltage power transmission equipment (neqIEC 60071-1.1993)
GB 1094.2-1996 Power transformers - Part 2 temperature (eqv IEC 60076-2.1993)
GB/T 5273-1985 transformers, high-voltage electrical terminals and casing (neqIEC 60518. 1975)
GB 7327-1987 AC systems with silicon carbide surge arresters (neqIEC 60099-1.1991)
GB 11032-2000 exchange gapless metal oxide surge arresters (eqv IEC 60099-4.1991)
GB/T 11604-1989 high-voltage electrical equipment radio interference test method (eqv IEC 60018. 1983)
GB/T 16927.1-1997 high voltage test techniques Part 1. General test requirements (eqv IEC 60060-1. 1989)
GB/T 16927.2-1997 high voltage test techniques Part 2. Measuring systems (eqv IEC 60060-2.1994)
JB/T 6479-1992 Line traps for ac power systems Used series gap metal oxide surge arresters
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
Even one kind of the carrier signal from the primary coil inductance type, tuning devices, high-voltage equipment protection element consisting of series of high-voltage power lines
Contacts between adjacent power system components (e.g., bus, transformer, etc.), or a power line at the branch point. Tuning means connected across the two main coil
End, properly tuned, it can exhibit a high impedance in one or more carrier frequencies or continuous carrier band and frequency impedance can be
Is negligible, in order to limit the power losses in the power system of the carrier signal.
Fig. 1a) and Figure 1b) shows two typical wave trap circuit. single frequency tuned wave trap and band tuner traps. Traps are also recoverable
Other forms of circuits.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 7330-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 7330-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 7330-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 7330-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 7330-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 7330-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|