Path: Home > GB/T > Page714 > GB/T 46426-2025 || Home > Standard_List > GB/T > Page714 > GB/T 46426-2025
Price & DeliveryUS$279.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 46426-2025: Design specification for produced water treatment of coalbed methane well Status: Valid
| Std ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status |
| GB/T 46426-2025 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Design specification for produced water treatment of coalbed methane well
| Valid |
Standard similar to GB/T 46426-2025 GB/T 17766 | YS/T 514.1 | MT/T 1091 | GB/T 46549 | GB/T 13813 |
Basic data | Standard ID | GB/T 46426-2025 (GB/T46426-2025) | | Description (Translated English) | Design specification for produced water treatment of coalbed methane well | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | D15 | | Classification of International Standard | 73.040 | | Word Count Estimation | 14,127 | | Date of Issue | 2025-10-05 | | Date of Implementation | 2026-05-01 | | Issuing agency(ies) | State Administration for Market Regulation and Standardization Administration of China |
GB/T 46426-2025: Design specification for produced water treatment of coalbed methane well---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 73.040
CCSD15
National Standards of the People's Republic of China
Coalbed methane well drainage water treatment design specifications
Published on 2025-10-05
Implemented on May 1, 2026
State Administration for Market Regulation
The State Administration for Standardization issued a statement.
Table of contents
Preface III
1.Scope 1
2 Normative References 1
3.Terms and Definitions 1
4 Design Basis 2
4.1 Policies, Regulations and Standards 2
4.2 Geological and Engineering Data 2
5 Design Principles 2
6.Design Process 2
7.Measurement Design 3
7.1 Coalbed Methane Exploration Stage 3
7.2 Coalbed Methane Development Stage 3
8.Gathering and Transportation Design 3
8.1 Coalbed Methane Exploration Stage 3
8.2 Coalbed Methane Development Stage 4
9.Water quality analysis design 4
10.Design for Water Treatment Applications 4
10.1 Coalbed Methane Exploration Stage 4
10.2 Coalbed Methane Development Stage 5
11 Water Treatment Process Design 5
11.1 Coalbed Methane Exploration Stage 5
11.2 Coalbed Methane Development Stage 5
12 Monitoring Requirements 5
13 Quality, Health, Safety, and Environmental Management 5
14 Design Document Writing Outline 6
Appendix A (Informative) Outline for Writing a Design Report on Drainage and Treatment for Coalbed Methane Wells 7
References 8
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents".
Drafting.
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed by the China National Coal Association.
This document is under the jurisdiction of the National Coal Standardization Technical Committee (SAC/TC42).
This document was drafted by. China Coal Technology & Engineering Group Xi'an Research Institute Co., Ltd., China United Coalbed Methane Co., Ltd., and the Coal and Coalbed Methane Association.
The National Key Laboratory, Shanxi Blue Flame Coalbed Methane Group Co., Ltd., Xi'an Coal Science and Technology Testing Technology Co., Ltd., and Zhong Sheng Environmental Technology Development Co., Ltd.
Exhibition Co., Ltd.
The main drafters of this document are. Jiang Wenping, Wang Yi, Zhang Peihe, Hao Shijun, Feng Huawei, Fan Yao, Sun Lichun, Cao Ming, Liu Mingjun, and Liu Baigen.
Li Dandan, Du Xinfeng, Qiao Kang, Liu Jia, Ji Changjiang, Li Feng, He Qinghong, Li Junjun, Lei Fen.
Coalbed methane well drainage water treatment design specifications
1 Scope
This document specifies the design basis, design principles, design process, metering design, gathering and transportation design, and water quality analysis design for coalbed methane well drainage water treatment.
The design includes the application of water treatment, water treatment process design, monitoring requirements, quality, health, safety and environmental management, and an outline for the design document.
This document applies to the design of drainage water treatment for coalbed methane wells during the exploration and development phase.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB 5084 Standard for Irrigation Water Quality
GB 8978 Integrated Wastewater Discharge Standard
GB 18599 Standard for Pollution Control of General Industrial Solid Waste Storage and Landfill
GB/T 18920 Water Quality Standards for Urban Wastewater Reuse and Urban Miscellaneous Water Use
GB/T 18921 Water Quality Standards for Landscape and Environmental Water Used in Urban Wastewater Reuse
GB/T 40546-2021 Design Specification for Drainage Engineering of Coalbed Methane Wells
NB/T 10029-2016 Design Specification for Coalbed Methane Gathering and Transportation
SY/T 5523-2016 Oilfield Water Analysis Methods
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
producedwater
Water discharged from coalbed methane wells.
Note. This includes backflow fluid from fracturing and blowout treatment, wellbore treatment, etc.
3.2
watergathering line
Water pipeline from coalbed methane wellhead to water collection pool or water collection tanker.
Note. This includes both branch water collection lines and main water collection lines.
3.3
Branch pipelines connecting the coalbed methane wellhead to the water collection trunk line.
3.4
Pipelines that collect water from each water collection branch and transport it to a collection pool or water tanker.
Note. The diameter of the main water collection pipe is larger than that of the branch water collection pipe.

Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 46426-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 46426-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 46426-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 46426-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|