Path: Home > GB/T > Page344 > GB/T 46087.1-2025 Home > Standard_List > GB/T > Page344 > GB/T 46087.1-2025
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 46087.1-2025 | English | 219 |
Add to Cart
|
3 days [Need to translate]
|
Test for shop primers in relation to welding and allied processes - Part 1: General requirements
| Valid |
GB/T 46087.1-2025
|
PDF similar to GB/T 46087.1-2025
Basic data | Standard ID | GB/T 46087.1-2025 (GB/T46087.1-2025) | | Description (Translated English) | Test for shop primers in relation to welding and allied processes - Part 1: General requirements | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J33 | | Classification of International Standard | 25.160.10 | | Word Count Estimation | 10,157 | | Date of Issue | 2025-08-29 | | Date of Implementation | 2026-03-01 | | Issuing agency(ies) | State Administration for Market Regulation, National Standardization Administration |
GB/T 46087.1-2025: Test for shop primers in relation to welding and allied processes - Part 1: General requirements ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT46087.1-2025
ICS 25.160.10
CCSJ33
National Standard of the People's Republic of China
Shop primer welding and related process tests
Part 1.General requirements
Part 1.General requirements
alienedprocesses-Part 1.Generalrequirements,MOD)
Released on August 29, 2025
Implementation on March 1, 2026
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Application Guide 2
5 Health, Safety and Environment 3
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is Part 1 of GB/T 46087 “Shop primer welding and related process tests”. GB/T 46087 has been published in
Lower part.
--- Shop primer welding and related process tests Part 1.General requirements;
--- Shop primer welding and related process tests Part 2.Welding performance;
--- Shop primer welding and related process tests Part 3.Thermal cutting;
--- Shop primer welding and related process tests Part 4.Emission of fume and gases.
This document is modified to adopt ISO 17652-1.2003 "Welding shop primers — Welding and associated procedure tests — Part 1.General requirements".
The technical differences between this document and ISO 17652-1.2003 and their reasons are as follows.
--- Changed the scope to comply with the writing rules of Chinese standards (see Chapter 1);
--- The normative reference GB/T 46087.2-2025 replaces ISO 17652-2.2003 (see Chapter 4) to facilitate standardization.
application;
--- ISO 17652-3 (see Chapter 4) is replaced by the normative reference GB/T 46087.3 to facilitate standard application;
--- ISO 17652-4 (see Chapter 4) is replaced by the normative reference GB/T 46087.4 to facilitate standard application;
--- The definitions of terms in 3.3, 3.4 and 3.5 have been changed to apply to the actual domestic technical environment (see Chapter 3).
The following editorial changes have been made to this document.
--- Change the name of the standard to "Shop primer welding and related process tests Part 1.General requirements";
--- Deleted the note on unknown primers in Chapter 5;
--- Deleted references to international standards.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed and coordinated by the National Technical Committee for Welding Standardization (SAC/TC55).
This document was drafted by. Harbin Welding Research Institute Co., Ltd. of China Machinery Engineering Corporation, Harbin Institute of Technology, Haiyan Zhongda Metal
Electronic Materials Co., Ltd., China Railway Construction Heavy Industry Group Co., Ltd., Fujian Industrial Equipment Installation Co., Ltd., CRRC Qingdao Sifang Machinery
Vehicle Co., Ltd. and Harbin Welding Guochuang (Qingdao) Welding Engineering Innovation Center Co., Ltd.
The main drafters of this document are. Lv Xiaochun, Cao Yukun, Su Jinhua, He Peng, Xia Yajin, Feng Weifeng, Wang Xiaoteng, Luo Jianli, Fei Dakui, Dong Bolun,
Fan Zhizhong, Li Lin, Wang Xiaoyang, Wang Ren, and Yang Haifeng.
introduction
As a key protective layer for steel pretreatment, shop primer is widely used in steel structure, shipbuilding, automobile manufacturing and other fields. Its performance is directly related to the
It affects the quality and safety of subsequent processes such as welding and cutting.
GB/T 46087 “Shop primer welding and related process tests” aims to build a complete shop primer process evaluation system, including shop primer
The effects of paint on welding performance, thermal cutting efficiency and smoke emissions are divided into the following four parts.
--- Part 1.General requirements. The purpose is to specify the basic conditions, term definitions, environment and safety requirements for the test, and to provide guidance for subsequent tests.
Provide a unified framework.
--- Part 2.Welding performance. The purpose is to evaluate the welding performance of shop primers by using the severity of welding porosity defects
impact.
--- Part 3.Thermal cutting. The purpose is to clarify the test method for the maximum speed of thermal cutting of shop primers, through standardized test pieces
Preparation and cutting parameter setting, evaluation of the effect of primer on cutting efficiency and process stability.
--- Part 4.Emissions of smoke and gases. The purpose is to establish an evaluation system for the emission levels of smoke and harmful gases from shop primers.
System, providing a technical basis for reducing occupational health hazards and environmental pollution.
Shop primer welding and related process tests
Part 1.General requirements
1 Scope
This document specifies the general requirements for evaluating the effects of shop primers on steel welding and related process performance, including terms and definitions, test instructions,
South, test environment, health and safety requirements, etc.
This document applies to shop primer welding and related process tests.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 46087.2-2025 Shop primer welding and related process tests Part 2.Welding performance (GB/T 46087.2-
2025, ISO 17652-2.2003, MOD)
GB/T 46087.3 Shop primer welding and related process tests Part 3.Thermal cutting (GB/T 46087.3-2025, ISO
17652-3.2003,MOD)
GB/T 46087.4 Shop primer welding and related process tests Part 4.Emission of smoke and gases
(GB/T 46087.4-2025,ISO 17652-4.2003, MOD)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Emission test emission test
Test method for evaluating the effect of shop primers on fume and gas emissions during welding.
3.2
Rating test ratingtest
Screening test method for evaluating the weldability of shop primers of specified thickness by welding on different types of shop primer surfaces.
Connectivity.
3.3
Shop Primer
prefabrication primer
During the steel production stage, it is evenly applied on the surface of the sandblasted steel plate as a primer for surface corrosion protection. It can directly protect the painted steel.
Welding and cutting are then carried out.
3.4
Test method for evaluating the effect of shop primers on the thermal cutting properties of steel using cutting speed as the only measured variable.
Price & DeliveryUS$219.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 46087.1-2025: Test for shop primers in relation to welding and allied processes - Part 1: General requirements Status: Valid
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 46087.1-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 46087.1-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 46087.1-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 46087.1-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|