Path: Home > GB/T > Page19 > GB/T 43330.1-2023 Home > Standard_List > GB/T > Page19 > GB/T 43330.1-2023
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 43330.1-2023 | English | 249 |
Add to Cart
|
3 days [Need to translate]
|
Ballast water treatment system - Part 1: Requirements
| Valid |
GB/T 43330.1-2023
|
Standard similar to GB/T 43330.1-2023 GB/T 43330.2 GB/T 43330.4 GB/T 17728
Basic data | Standard ID | GB/T 43330.1-2023 (GB/T43330.1-2023) | | Description (Translated English) | Ballast water treatment system - Part 1: Requirements | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | U25 | | Classification of International Standard | 47.020.90, 13.060.30 | | Word Count Estimation | 12,148 | | Date of Issue | 2023-11-27 | | Date of Implementation | 2024-06-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 43330.1-2023: Ballast water treatment system - Part 1: Requirements---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 47:020:90:13:060:30
National Standards of People's Republic of China
Ship's ballast water treatment systems Part 1: Requirements
Published on 2023-11-27
2024-06-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration Committee
Foreword
This document complies with the provisions of GB/T 1:1-2020 "Standardization Work Guidelines Part 1: Structure and Drafting Rules of Standardization Documents"
Drafting:
This document is Part 1 of GB/T 43330 "Ship Ballast Water Treatment System": GB/T 43330 has released the following parts:
---Part 1: Requirements:
Please note that some content in this document may be subject to patents: The publisher of this document assumes no responsibility for identifying patents:
This document is proposed and coordinated by the National Marine Machinery Standardization Technical Committee (SAC/TC137):
This document was drafted by: Qingdao Shuangrui Marine Environmental Engineering Co:, Ltd:, China State Shipbuilding Corporation Ltd: 704th Research Institute,
China Classification Society Shanghai Standards Research Institute:
The main drafters of this document: Wang Tingyong, Duan Dongxia, Zhang Xianfeng, Liu Lihong, Xu Fengqi, Song Jinjin, Yu Lin, Fu Hongtian, Guo Yu, Pan Jincheng,
Wang Zhilei, Chen Lin, Hu Fangzhen:
Introduction
According to the requirements of the International Convention for the Control and Management of Ships’ Ballast Water and Sediments issued by the International Maritime Organization (IMO), ocean-going ships
A ship's ballast water treatment system should be installed: GB/T 43330 "Ship Ballast Water Treatment System" is planned to be composed of three parts based on the technical characteristics of the product:
composition:
---Part 1: Requirements;
---Part 2: Electrolysis;
---Part 4: Emission sampling devices and procedures:
Ship's ballast water treatment systems Part 1: Requirements
1 Scope
This document specifies the classification and system design limitations, requirements, test methods, installation requirements, inspection rules,
Packaging, transportation and storage:
This document applies to the design, manufacture, installation and inspection of ship ballast water treatment systems (hereinafter referred to as treatment systems):
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, the dated quotations
For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to
this document:
GB/T 150:4 Pressure vessels Part 4: Manufacturing, inspection and acceptance
GB/T 191 Packaging, storage and transportation pictorial mark
GB/T 3836:1 Explosive atmosphere Part 1: General requirements for equipment
GB/T 4208-2017 Shell protection level (IP code)
GB/T 10250 Electromagnetic compatibility of ship electrical and electronic equipment
GB/T 13306 Signage
GB/T 13384-2008 General technical conditions for mechanical and electrical product packaging
China Classification Society, Type Approval Test Guidelines for Electrical and Electronic Products (2015)
Resolution MEPC:173(58) Guidelines for Ballast Water Sampling, International Maritime Organization (IMO)
Resolution MEPC:300(72) Approval Rules for Ballast Water Management Systems, International Maritime Organization (IMO)
3 Terms and definitions
The following terms and definitions apply to this document:
3:1
ballast waterballastwater
Water added to a ship for the purpose of controlling the ship's trim, heel, draft, stability or stress:
3:2
ballast water treatmentballastwatertreatment
Use single or comprehensive mechanical, physical, chemical and biological treatment methods to treat harmful aquatic organisms and organisms in ballast water (3:1) and sediments:
Pathogens are removed or disposed of harmlessly:
3:3
Use single or comprehensive mechanical, physical, chemical and biological treatment methods to remove and harmlessly dispose of ballast water (3:1) and sediments
Ballast water treatment equipment and control and monitoring equipment for harmful aquatic organisms and pathogens:
Note: Excludes ship ballast water accessories such as piping systems, valves, pumps, etc: when no treatment system is installed:
Price & DeliveryUS$249.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 43330.1-2023: Ballast water treatment system - Part 1: Requirements Status: Valid
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 43330.1-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 43330.1-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 43330.1-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 43330.1-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|