HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 42151.3-2024 English PDF

US$1249.00 ยท In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 42151.3-2024: Communication networks and systems for power utility automation - Part 3: General requirements
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 42151.3-2024English1249 Add to Cart 7 days [Need to translate] Communication networks and systems for power utility automation - Part 3: General requirements Valid GB/T 42151.3-2024

PDF similar to GB/T 42151.3-2024


Standard similar to GB/T 42151.3-2024

GB/T 40588   GB/T 40427   GB/T 40609   GB/T 42151.6   GB/T 42151.71   GB/T 42151.4   

Basic data

Standard ID GB/T 42151.3-2024 (GB/T42151.3-2024)
Description (Translated English) Communication networks and systems for power utility automation - Part 3: General requirements
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F21
Classification of International Standard 29.240.10
Word Count Estimation 62,644
Date of Issue 2024-10-26
Date of Implementation 2025-05-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 42151.3-2024: Communication networks and systems for power utility automation - Part 3: General requirements


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT42151.3-2024
ICS 29.240.10 CCSF21 National Standard of the People's Republic of China Power automation communication networks and systems Part 3.General requirements Part 3.General requirements Released on October 26, 2024 Implementation on May 1, 2025 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction V 1 Scope 1 2 Normative references 1 3 Terms, Definitions and Abbreviations 4 3.1 Terms and Definitions 4 3.2 Abbreviations 13 4 Environmental Conditions 13 4.1 General Principles 13 4.2 Normal environmental conditions 13 4.3 Special environmental conditions 14 4.4 Storage conditions 15 5 Rating 15 5.1 General Principles 15 5.2 Rated voltage---Auxiliary excitation voltage 15 5.3 Switching Input and Output 15 5.4 Rated power consumption 15 5.5 Rated ambient temperature 15 6 Design and Manufacturing 15 6.1 Sign 15 6.2 File 21 6.3 Packaging 22 6.4 Size 23 6.5 Functional performance requirements 23 6.6 Product Safety Requirements 23 6.7 Electromagnetic Compatibility (EMC) 33 6.8 Power consumption test 43 6.9 Climate Performance 43 6.10 Mechanical properties 49 6.11 Enclosure protection 50 7 Test 50 7.1 General Principles 50 7.2 Test reference conditions 50 7.3 Equipment reliability level 50 7.4 Experimental communication conditions 50 7.5 Acceptance criteria 51 7.6 Test Overview 52 7.7 Test report contents 53 8 Marking, labelling and packaging 53 9 Transportation, storage, installation, operation and maintenance 54 10 Product Documentation 54 Reference 55 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 3 of GB/T 42151 "Electric Power Automation Communication Networks and Systems". GB/T 42151 has been published as follows part. --- Part 3.General requirements; --- Part 4.System and project management; --- Part 5.Communication requirements for functional and device models; --- Part 7-7.IEC 61850 related data model machine processable format for tools; --- Part 8-1.Specific Communication Service Mapping (SCSM) Mapping to MMS (ISO 9506-1 and ISO 9506-2) and ISO /IEC 8802-3. This document is modified to adopt IEC 61850-3.2013 "Electric power automation communication networks and systems Part 3.General requirements". The technical differences between this document and IEC 61850-3.2013 and their reasons are as follows. --- IEC TS61850-2.2019 replaces IEC TS61850-2.2003 (see Chapter 2 and Chapter 3). 61850-2.2003 has been replaced by IEC TS61850-2.2019; --- GB/T 19520.12 replaces IEC 60297-3-101 and is adjusted from the reference to Chapter 2 (see Chapter 2, 6.4 and Table 28), 6.4 and Table 28 make normative references to this document. --- Add normative references to IEC 60255-21 (all parts) (see Chapter 2 and Tables 1 and 2), Tables 1 and 2 normative references Use this file; --- Add normative references to IEC 60255-22-5 (see Chapter 2 and 6.6.1.2), and 6.6.1.2 normative references to this document; --- Add normative references to IEC 60695-2-20 (see Chapter 2 and 6.6.6.2.3), 6.6.6.2.3 normative references to this document; --- GB/T 2423.3-2016 replaces IEC 60068-2-78.2001 (see Chapter 2, Table 23, Table 24 and Table 28). IEC 60068-2-78.2001 has been replaced by IEC 60068-2-78.2012 and converted into a national standard; --- GB/T 12113-2023 replaces IEC 60990.1999 (see Chapter 2, Table 5 and Table 8). IEC 60990.1999 has been Replaced by IEC 60990.2016 and converted into a national standard; --- IEC 61180.2016 replaces IEC 61180-1.1999 and IEC 61180-2 (see Chapter 2, 6.6.3.1 and 6.6.3.3), IEC 61180-1.1999 and IEC 61180-2 have been replaced by IEC 61180.2016; --- CISPR 32 replaces CISPR 22.2008 (see Chapter 2, Table 14, Table 15, Table 16 and Table 17), CISPR 22.2008 Has been replaced by CISPR32.2015; --- CISPR 35.2016 replaces CISPR 24.2010 (see Chapter 2 and Table 9). CISPR 24.2010 has been replaced by CISPR 35.2016 instead. The following editorial changes have been made to this document. --- Adjust IEEE1613.2009, which is only mentioned in the footnote, to the reference. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Technical Committee for Standardization of Power System Management and Information Exchange (SAC/TC82). This document was drafted by. State Grid Electric Power Research Institute Co., Ltd., China National Grid Corporation of China, and State Grid Corporation of China. Dispatching Control Center, Tianjin Jingui Huihai Technology Development Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Electric Power Research Institute, Nanjing NARI Jibao Electric Co., Ltd., Xuji Group Co., Ltd., Guodian Nanjing Automation Co., Ltd., Jiangsu Hongyuan Electric Co., Ltd., State Grid Jilin Electric Power Co., Ltd., Beijing Sifang Relay Protection Automation Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd. China Electric Power Research Institute Co., Ltd., China Electric Power Research Institute Co., Ltd., China Southern Power Grid Co., Ltd., Changyuan Shenzhen Ruiji Bao Automation Co., Ltd., State Grid Shandong Electric Power Company Electric Power Research Institute, and Jicheng Electronics Co., Ltd. The main drafters of this document are. Shen Jian, Zhou Bin, Peng Qi, Chang Naichao, Tang Yongjian, Peng Zhiqiang, Du Jun, Liao Zeyou, Yin Jun, Xu Honghai, Yang Song, Ren Yanming, Du Qiwei, Li Jinsong, Sun Dan, Wei Jieru, Xu Zufeng, Shi Lin, Zhang Jinhu, Li Jin, Li Wenzhuo, Li Qiang, Xiang Rong, Liu Wenbiao, Liang Zhengtang, Su Huaiguang, Cai Dan, and Ruan Lixiang.

introduction

GB/T 42151 "Electric Power Automation Communication Networks and Systems" aims to provide interoperability for all devices in the electric power automation system. It consists of the following parts. --- Part 1.Introduction. The purpose is to introduce the overview of this series of standards. --- Part 2.Terminology. The purpose is to list the terms and definitions used in this series of standards. --- Part 3.General requirements. The purpose is to introduce the overall requirements of communication networks, with an emphasis on quality requirements. --- Part 4.System and project management. The purpose is to describe the requirements for system and project management processes and the requirements for engineering and testing Dedicated support tools are required. --- Part 5.Communication requirements for functions and device models. The purpose is to specify the communication requirements for various functions of the power automation system. --- Part 6.Communication configuration description language for power automation systems related to intelligent electronic devices. exchange of intelligent electronic device capability descriptions and power automation system between tools provided by different manufacturers describe. --- Part 7.Basic communication structure of power automation system. The purpose is to define the hierarchical class model and the functions provided by these classes. services to enable communication between devices. --- Part 8.Specific Communication Service Mapping SCSM. The purpose is to provide substation control layer and bay layer and station control layer and Communication mapping between bay layers. --- Part 9.Specific Communication Service Mapping SCSM. The purpose is to provide the substation bay layer and process layer and the bay layer and Communication mapping between process layers. --- Part 10.Conformance testing. The purpose is to specify the standard technology for implementing conformance testing and the use of performance parameters when proposing specific measurement techniques. This document is part 3 of GB/T 42151 "Electric Power Automation Communication Networks and Systems", which defines the communication, General requirements for the construction, design and environmental conditions of intelligent electronic devices (IEDs) and systems, including quality requirements (reliability, maintainability, system System availability, plantability, safety), environmental conditions (temperature, humidity, electromagnetic compatibility) and auxiliary services are the key factors for power automation equipment manufacturers to improve their It is an important guiding document for product design, R&D, production and testing. Power automation communication networks and systems Part 3.General requirements 1 Scope This document specifies the requirements for the construction, design and environment of communications and automation intelligent electronic devices (IEDs) and systems in power plants and substations. These general requirements are consistent with the requirements for IEDs operating in similar conditions, such as measuring relays and protection devices. When a communication or automation IED is part of another device in a power plant or substation, the environmental requirements for that device apply to the communication or automation IED. equipment. 2 Normative references The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2423.1-2008 Environmental testing for electric and electronic products Part 2.Test methods Test A. Low temperature (IEC 60068-2- 1.2007,IDT) GB/T 2423.2-2008 Environmental testing for electric and electronic products Part 2.Test methods Test B. High temperature (IEC 60068-2- 2.2007,IDT) GB/T 2423.3-2016 Environmental testing Part 2.Test methods Test Cab. Steady state damp heat test (IEC 60068-2- 78.2012,IDT) GB/T 2423.4-2008 Environmental testing for electric and electronic products Part 2.Test method Test Db cyclic damp heat (12h 12h cycle) (IEC 60068-2-30.2005, IDT) GB/T 2423.22-2012 Environmental testing Part 2.Test method Test N. Temperature change (IEC 60068-2-14. 2009, IDT) GB/T 12113-2023 Measurement of touch current and protective conductor current (IEC 60990.2016, IDT) GB/T 14598.27-2017 Measuring relays and protective devices Part 27.Product safety requirements (IEC 60255-27. 2013, IDT) GB/T 17626.2-2018 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test (IEC 61000-4-2. 2008, IDT) GB/T 17626.3-2023 Electromagnetic compatibility test and measurement techniques Part 3.Radio frequency electromagnetic field radiated immunity test (IEC 61000-4-3.2020,IDT) Note. There is no technical difference between the referenced content of GB/T 17626.3-2023 and the referenced content of IEC 61000-4-3.2008. GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test (IEC 61000- 4-4.2012,IDT) Note. There is no technical difference between the referenced content of GB/T 17626.4-2018 and the referenced content of IEC 61000-4-4.2004. GB/T 17626.5-2019 Electromagnetic compatibility test and measurement technology surge (shock) immunity test (IEC 61000-4-5. 2014, IDT) Note. There is no technical difference between the referenced content of GB/T 17626.5-2019 and the referenced content of IEC 61000-4-5.2005. GB/T 17626.8-2006 Electromagnetic compatibility test and measurement technology power frequency magnetic field immunity test (IEC 61000-4-8.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 42151.3-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 42151.3-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 42151.3-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 42151.3-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.