Altitude correction method for external insulation flashover voltage of high voltage power transmission projects
| Valid |
GB/T 42001-2022
|
PDF similar to GB/T 42001-2022
Basic data | Standard ID | GB/T 42001-2022 (GB/T42001-2022) | | Description (Translated English) | Altitude correction method for external insulation flashover voltage of high voltage power transmission projects | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F21 | | Classification of International Standard | 29.080.01 | | Word Count Estimation | 14,114 | | Date of Issue | 2022-10-14 | | Date of Implementation | 2023-05-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 42001-2022: Altitude correction method for external insulation flashover voltage of high voltage power transmission projects ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Altitude correction method for external insulation flashover voltage of high voltage power transmission projects
ICS 29.080.01
CCSF21
National Standards of People's Republic of China
High voltage power transmission and transformation project external insulation discharge voltage altitude
Correction method
Published on 2022-10-12
2023-05-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 External insulation discharge voltage altitude correction procedure 1
5 Altitude correction for air gap discharge voltage of transmission line 2
6 Altitude correction of air gap discharge voltage in substation 4
7 Altitude correction of air gap discharge voltage of converter station 5
8 Altitude correction of insulator outer insulation discharge voltage 6
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by China Electricity Council.
This document is drafted by. China Electric Power Research Institute Co., Ltd., China Southern Power Grid Research Institute Co., Ltd., North China Electric Power University
Xue, China Electric Power Engineering Consulting Group Corporation Southwest Electric Power Design Institute Co., Ltd., State Grid Qinghai Electric Power Company Electric Power Research Institute, State Grid
Tibet Electric Power Company Electric Power Research Institute, State Grid Shanxi Electric Power Company Electric Power Research Institute.
The main drafters of this document. Ding Yujian, Huang Ruiping, Huo Feng, Zhou Jun, Gu Chen, Yao Xiuyuan, Yu Xinzhe, Su Yu, Geng Jianghai, Yue Song, Wang Shengfu,
Gao Chao, Yang Yun, Liang Ming, Du Yijun, Tian Liang, Nan Jing, Yu Hua, Wang Xinwei.
High voltage power transmission and transformation project external insulation discharge voltage altitude
Correction method
1 Scope
This document describes the air gap discharge of 110kV~750kV and ±400kV~±800kV transmission lines, substations, converter stations, etc.
Altitude correction method for electric voltage and insulator pollution flashover discharge voltage.
This document is applicable to the altitude correction of the external insulation discharge voltage of power transmission and transformation projects in areas with an altitude of 5000m and below, and the altitude is 5000m.
Refer to the above regions for use.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 311.1 Insulation Coordination Part 1.Definitions, Principles and Rules
GB/T 16927.1 High Voltage Test Technology Part 1.General Definitions and Test Requirements
GB/T 16927.2 High Voltage Test Technology Part 2.Measurement System
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
External insulationexternalinsulation
The exposed surface of the air gap or solid insulation of the equipment exposed to the voltage.
3.2
high altitude area
Areas with an altitude of not less than 1000m.
3.3
According to the difference in dielectric strength between the average atmospheric conditions at the altitude and the standard reference atmospheric conditions during operation, the insulation coordination withstand voltage or discharge
Factor for electrical voltage correction.
3.4
Atmospheric conditions for which the standardized withstand voltage applies.
Note. The standard reference atmospheric conditions are temperature 20°C, pressure 101.3kPa, and absolute humidity 11g/m3.
4 External insulation discharge voltage altitude correction procedure
4.1 Positive conversion
Through altitude correction, the external insulation discharge voltage of power transmission and transformation projects in high altitude areas can be converted to the standard reference atmospheric condition of 0m above sea level
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 42001-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 42001-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 42001-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 42001-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|