Search result: GB/T 41893-2022
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 41893-2022 | English | 479 |
Add to Cart
|
5 days [Need to translate]
|
General requirements of logistics management for hull parts manufacturing digital workshop
| Valid |
GB/T 41893-2022
|
Standard ID | GB/T 41893-2022 (GB/T41893-2022) | Description (Translated English) | General requirements of logistics management for hull parts manufacturing digital workshop | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | U07 | Classification of International Standard | 47.020.01 | Word Count Estimation | 26,264 | Date of Issue | 2022-10-14 | Date of Implementation | 2022-10-12 | Issuing agency(ies) | State Administration for Market Regulation, National Standardization Management Committee |
GB/T 41893-2022
General requirements of logistics management for hull parts manufacturing digital workshop
ICS 47.020.01
CCSU07
National Standards of People's Republic of China
Ship hull parts manufacturing digital workshop logistics management
basic requirements
digitalworkshop
Published on 2022-10-12
2022-10-12 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Abbreviations 2
5 Logistics management object 2
5.1 Category 2
5.2 Personnel 2
5.3 Raw materials 3
5.4 Parts (components) and pallets 3
5.5 Workstation (Site) 4
5.6 Logistics equipment and tooling facilities 4
6 Logistics operations 4
6.1 Logistics operation stage 4
6.2 Flow chart of logistics operation 5
6.3 The first stage of logistics operations 5
6.4 The second stage logistics operation 6
6.5 The third stage logistics operation 6
6.6 Fourth stage logistics operation 6
6.7 The fifth stage of logistics operations 6
6.8 The sixth stage logistics operation 7
7 Logistics Management System 7
7.1 Composition 7
7.2 Logistics planning management 7
7.3 Path Planning Simulation Management 8
7.4 Workstation (site) management 8
7.5 Parts and pallet management 8
7.6 Management of logistics equipment and tooling facilities 8
7.7 Buffer Yard Management 8
7.8 Data Analysis Management 9
8 Logistics management system information flow 9
8.1 Network and Terminal 9
8.2 Information collection 10
8.3 Information Interaction Between Logistics Management System and External System 12
Appendix A (Informative) Coding Example 16
A.1 Raw material code 16
A.2 Code of hull parts (components) 16
A.3 Pallet code 18
A.4 Workstation (site) code 18
A.5 Coding of logistics equipment and tooling facilities 19
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by the National Standardization Technical Committee of Ocean Ships (SAC/TC12).
This document is drafted by. China Shipbuilding Industry Research Institute of Comprehensive Technology and Economics, CNOOC Research Institute Co., Ltd., Beijing China Shipbuilding Corporation
Information Technology Co., Ltd., Guangzhou Wenchong Shipyard Co., Ltd., Shanghai Jiangnan Changxing Shipbuilding Co., Ltd., Shanghai Waigaoqiao Shipbuilding Co., Ltd.
company.
The main drafters of this document. Song Yanyuan, Wang Jianxun, Lin Hongshan, Ji Zhongliang, Fu Dianfu, Cheng Yang, Zhang Haiyong, Sun Nan, Chen Baofeng, Li Wei,
Liu Yongtao, Zhang Yi, Gu Hongbin, Du Qiaoling, Ji Yongbo, Cheng Zejun, Chen Xiaoyu, Sun Xiaojun, Fang Yibin, Chen Wenjuan, Zhang Hui, Shao Weidong.
Ship hull parts manufacturing digital workshop logistics management
basic requirements
1 Scope
This document specifies the logistics management objects, logistics management system and its information flow and logistics operations in the digital workshop of hull parts manufacturing.
requirements.
This document applies to the planning, construction and management of digital workshop logistics for the manufacture of hull components.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 12991.1-2008 Information Technology Database Language SQL Part 1.Framework (ISO /IEC 9075-1.2003, IDT)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
In the process of building a ship in sections, according to the process requirements, from steel pretreatment, cutting, processing, small assembly, middle assembly to the process before the formation of subsections
Stage, the process of processing and combining steel into intermediate products such as parts and components (medium and small components).
3.2
Based on the technology and equipment required for the manufacture of hull parts, using information technology, automation, measurement and control technology, etc.
A workshop that connects different units in the workshop to plan, manage, diagnose and optimize the production operation process.
3.3
In the digital workshop for the manufacture of hull parts, the raw materials, pallets, and intermediate products are realized in different process stages before and after through the carrier.
transfer activities between.
3.4
workshop
Using the processing technology of dividing lines and lanes into groups, using information technology to build a logistics management system, dispatching logistics-related resources, and driving logistics design.
Prepare, control the logistics status, and manage the logistics of the hull parts manufacturing digital workshop.
3.5
buffer yard stagingarea
A temporary transfer site for materials (raw materials and hull parts).
Note. The buffer yard is the product when there is a gap between logistics management and just-in-time production.
......
|