|
US$249.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40091-2021: Requirements for safety measures of relaying protection and security automatic equipment in smart substation Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 40091-2021 | English | 249 |
Add to Cart
|
3 days [Need to translate]
|
Requirements for safety measures of relaying protection and security automatic equipment in smart substation
| Valid |
GB/T 40091-2021
|
PDF similar to GB/T 40091-2021
Basic data | Standard ID | GB/T 40091-2021 (GB/T40091-2021) | | Description (Translated English) | Requirements for safety measures of relaying protection and security automatic equipment in smart substation | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K45 | | Word Count Estimation | 13,194 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 40091-2021: Requirements for safety measures of relaying protection and security automatic equipment in smart substation ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Requirements for safety measures of relaying protection and security automatic equipment in smart substation
ICS 29.240.99
K45
National Standards of People's Republic of China
Smart Substation Relay Protection and Power Grid Security
Requirements for safety measures for automatic devices
Released on 2021-04-30
2021-11-01 implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 1
5 Secondary security measures process 2
6 Requirements for the formulation of secondary safety measures 2
7 Implementation requirements for secondary security measures 3
8 Recovery requirements for secondary security measures 4
Appendix A (informative appendix) Form of secondary work safety measures (vote) 6
Appendix B (informative appendix) Example 8 of typical isolation points for secondary safety measures
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed and managed by the China Electricity Council.
Drafting organizations of this standard. State Grid Hunan Electric Power Co., Ltd. Electric Power Research Institute, National Electric Power Dispatching Control Center, China Southern Power
Grid Electric Power Dispatching Control Center, State Grid Zhejiang Electric Power Co., Ltd. Electric Power Research Institute, State Grid Jiangsu Electric Power Co., Ltd. Electric Power Research Institute
Research Institute, State Grid Hunan Electric Power Co., Ltd. Shaoyang Power Supply Branch, State Grid Hunan Electric Power Co., Ltd. Maintenance Company, Guangdong Grid Electric Power Commission
Degree Control Center, North China Branch of State Grid Co., Ltd., North China Electric Power Research Institute Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd.
Company Hangzhou Power Supply Company, Guizhou Power Grid Co., Ltd. Electric Power Research Institute, Guodian Nanjing Automation Co., Ltd., Nanjing NARI
Bao Electric Co., Ltd.
The main drafters of this standard. Liang Wenwu, Zhu Weijun, Wang Zhonglang, Huang Jiayin, Peng Ye, Wang Song, Gao Lei, Wang Pengfei, Chen Yuan, Fang Fang, Song Shuang,
Chen Qiaoping, Wang Zengchao, Zheng Shaoming, Liu Miao, Xin Guangming, Hou Weihong, Wang Yu, Li Yuping, Chen Jianguo.
Smart Substation Relay Protection and Power Grid Security
Requirements for safety measures for automatic devices
1 Scope
This standard stipulates that the relay protection of smart substations and automatic power grid safety devices, related secondary equipment and secondary circuits shall comply with the on-site work.
The overall requirements of the cycle, the procedures of the secondary security measures, the requirements for the formulation of secondary security measures, the requirements for the implementation of secondary security measures, and the restoration of secondary security measures
Complex requirements.
This standard applies to the field work of intelligent substation relay protection and power grid security automatic devices, related secondary equipment and secondary circuits.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 20840.7 Transformer Part 7.Electronic Voltage Transformer
GB/T 20840.8 Transformer Part 8.Electronic Current Transformer
GB 26860 Electrical Safety Work Rules for the Electrical Part of Power Plants and Substations
DL/T 860 (all parts) Substation communication network and system
DL/T 995 Inspection Regulations for Relay Protection and Power Grid Security Automatic Devices
3 Terms and definitions
The terms and definitions defined in GB/T 20840.7, GB/T 20840.8, GB 26860, DL/T 860 (all parts), and DL/T 995 are suitable
Used in this document.
4 General requirements
4.1 In addition to the implementation of GB 26860, the on-site work of smart substations should also comply with the provisions of this standard on secondary safety measures.
4.2 On-site operators should understand the working location, scope of work, electrical main wiring, related primary equipment and secondary equipment operation, and be familiar with
Relay protection, power grid security automatic devices and related secondary circuits, fully assess the impact of field operations on related secondary equipment or circuits.
4.3 The on-site work should comply with relevant regulations or rules such as work tickets, operation tickets, secondary work safety measures (tickets), standardized operations, and risk identification.
system.
4.4 The management and control of smart substation configuration files should be done well.
4.5 On-site work should comply with relevant regulations and systems for information security, and dedicated computers should be used for information operations such as online and file copying.
And secure storage media.
4.6 In the process of on-site work, in the event of an abnormal situation or a circuit breaker tripping, the work should be stopped immediately, and the status quo should be maintained, pending investigation of the cause. determine
It has nothing to do with this job and can only continue to work after getting permission. If the abnormal situation or the tripping of the circuit breaker is caused by its own work, the site should be kept
And immediately notify the operation and maintenance personnel for timely processing.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40091-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40091-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 40091-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40091-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|