HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 38604.4-2020 English PDF

US$229.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 38604.4-2020: Public information guidance systems - Assessment requirement - Part 4: Trolley and bus station
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 38604.4-2020English229 Add to Cart 3 days [Need to translate] Public information guidance systems - Assessment requirement - Part 4: Trolley and bus station Valid GB/T 38604.4-2020

PDF similar to GB/T 38604.4-2020


Standard similar to GB/T 38604.4-2020

GB/T 16903   GB/T 15566.1   GB/T 31525   GB/T 38604.3   GB/T 38605   GB/T 38604.2   

Basic data

Standard ID GB/T 38604.4-2020 (GB/T38604.4-2020)
Description (Translated English) Public information guidance systems - Assessment requirement - Part 4: Trolley and bus station
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard A22
Classification of International Standard 01.080.10
Word Count Estimation 12,126
Date of Issue 2020-03-31
Date of Implementation 2020-10-01
Quoted Standard GB/T 15565; GB/T 19038; GB/T 38604.1
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration
Summary This standard specifies the principles of evaluation of the public information guidance system of bus and tram stations (hereinafter referred to as the guidance system of bus and tram stations), and specifies the requirements for preliminary preparation, evaluation implementation and evaluation results. This standard is applicable to the evaluation of new construction, reconstruction, expansion and maintenance of public information guidance systems for bus and tram stations.

GB/T 38604.4-2020: Public information guidance systems - Assessment requirement - Part 4: Trolley and bus station


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Public information guidance systems--Assessment requirement--Part 4. Trolley and bus station ICS 01.080.10 A22 National Standards of People's Republic of China Evaluation requirements for public information-oriented systems Part 4. Public steam and tram stations 2020-03-31 release 2020-10-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee

Contents

Foreword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General 1 5 Preliminary preparations 1 5.1 Evaluation Scope 1 5.2 Evaluation cycle 1 5.3 Evaluation index 1 5.4 Evaluation method 5 6 Evaluation Implementation 6 7 Evaluation conclusion 6 Appendix A (Informative Appendix) Field Test Method 7 Appendix B (informative appendix) Example 8 questionnaire for public steam and tram station guidance system Table 1 Evaluation Index System of the Guidance System of Public Steam Tram Station 2 Table B.1 Investigator fill in 8 Table B.2 Passengers fill in 8

Foreword

GB/T 38604 "Public Information Guidance System Evaluation Requirements" consists of the following parts. --- Part 1. General Provisions; --- Part 2. Railway passenger stations; --- Part 3. Urban Rail Transit Station; --- Part 4. Public steam and tram stations. This part is Part 4 of GB/T 38604. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part is proposed and managed by the National Graphic Symbol Standardization Technical Committee (SAC/TC59). This section was drafted by. China National Institute of Standardization, Beijing Municipal Transportation Commission, China Automobile Certification Center Co., Ltd., National Railway Administration, Beijing Beijing Metro Operation Co., Ltd. The main drafters of this section. Zou Chuanyu, An Xiaofen, Qiang Yi, Chen Ziding, Zhou Ke, Chen Yongquan, Zhang Liang. Evaluation requirements for public information-oriented systems Part 4. Public steam and tram stations

1 Scope

This part of GB/T 38604 clarifies the public information and guidance system of public steam and tram stations (System) The principle of evaluation stipulates the requirements for preliminary preparation, evaluation implementation and evaluation results. This section is applicable to the evaluation of new, rebuilt, expanded and maintained public information-oriented systems at public steam and tram stations.

2 Normative references

The following documents are essential for the application of this document. For dated references, only the dated version applies to this article Pieces. For the cited documents without date, the latest version (including all amendments) applies to this document. GB/T 15565 Graphic symbol terms GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide GB/T 38604.1 Requirements for the Evaluation of Public Information Guidance System Part 1. General

3 Terms and definitions

The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.

4 General

4.1 Evaluation work should comply with the requirements of GB/T 38604.1. 4.2 The evaluation scope should be determined according to the purpose of the evaluation, for example, the overall evaluation The scope should cover all public steam and tram stations in the city. 4.3 The evaluation cycle should be determined according to the scale of the public steam and tram transportation network, the importance of the station, and the evaluation objectives The guidance system of the hub can be evaluated once a year.

5 Preliminary preparations

5.1 Scope of evaluation The evaluation scope of the public steam and tram station guidance system includes the entire network evaluation and special evaluation. Among them, the whole network evaluation should cover the entire city operation Time period, all lines of operation; special evaluation can be carried out on specific lines, specific areas, specific types of stations, etc. 5.2 Evaluation cycle The evaluation cycle of the whole network evaluation should be once a year, and special evaluation can be carried out according to actual needs. 5.3 Evaluation index 5.3.1 Index system 5.3.1.1 The basic indexes, first-level indexes and second-level indexes of the evaluation index system of the public steam and tram station guidance system are shown in Table 1.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 38604.4-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 38604.4-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 38604.4-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 38604.4-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.