Public information guidance systems - Assessment requirement - Part 2: Railway passenger station
| Valid |
GB/T 38604.2-2020
|
PDF similar to GB/T 38604.2-2020
Basic data | Standard ID | GB/T 38604.2-2020 (GB/T38604.2-2020) | | Description (Translated English) | Public information guidance systems - Assessment requirement - Part 2: Railway passenger station | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | A22 | | Classification of International Standard | 01.080.10 | | Word Count Estimation | 12,150 | | Date of Issue | 2020-03-31 | | Date of Implementation | 2020-10-01 | | Quoted Standard | GB/T 15565; GB/T 15566.3; GB/T 19038; GB/T 38604.1 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration | | Summary | This standard specifies the general rules, preliminary preparations, evaluation implementation and evaluation conclusions for the evaluation requirements of the public information guidance system of railway passenger stations (hereinafter referred to as the guidance system of railway passenger stations). This standard is applicable to the evaluation of new construction, reconstruction, expansion and maintenance of public information guidance systems in railway passenger stations. |
GB/T 38604.2-2020: Public information guidance systems - Assessment requirement - Part 2: Railway passenger station ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Public information guidance systems - Assessment requirement - Part 2.Railway passenger station
ICS 01.080.10
A22
National Standards of People's Republic of China
Public information-oriented system evaluation requirements
Part 2.Railway Passenger Station
2020-03-31 released
2020-10-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General 1
5 Preparation 1
5.1 Evaluation scope 1
5.2 Evaluation cycle 1
5.3 Evaluation Index 2
5.4 Evaluation plan 5
6 Evaluation Implementation 6
7 Evaluation conclusion 6
Appendix A (informative appendix) Field test method 7
Appendix B (informative appendix) Sample questionnaire for railway passenger station guidance system 8
Table 1 Evaluation index system of railway passenger station guidance system 2
Form B.1 Investigator fills in 8
Form B.2 Passenger fills in 8
Foreword
GB/T 38604 "Requirements for the Evaluation of Public Information Oriented Systems" consists of the following parts.
---Part 1.General Provisions;
---Part 2.Railway passenger station;
---Part 3.Urban rail transit station;
---Part 4.Bus and tram station.
This part is Part 2 of GB/T 38604.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
This part was proposed and managed by the National Graphic Symbol Standardization Technical Committee (SAC/TC59).
Drafting organizations of this section. China National Institute of Standardization, National Railway Administration, China National Railway Group Co., Ltd., Standardization Research of Shandong Province
Institute, China Automotive Certification Center Co., Ltd., Beijing Municipal Commission of Transportation, Beijing Vision Four-dimensional Urban Orientation System Planning and Design Co., Ltd.
The main drafters of this section. Zou Chuanyu, Chen Ziding, Cai Yun, Yang Fengjiang, Qiang Yi, An Xiaofen, Chen Yongquan, Zhang Liang, Gong Fengqi, Gao Jindong.
Public information-oriented system evaluation requirements
Part 2.Railway Passenger Station
1 Scope
This part of GB/T 38604 specifies the public information guidance system of railway passenger stations (hereinafter referred to as railway passenger station guidance system)
General rules of evaluation requirements, preliminary preparation, evaluation implementation and evaluation conclusions.
This part is applicable to the evaluation of railway passenger station construction, reconstruction, expansion and maintenance of public information guidance system.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 15565 Graphical Symbol Terms
GB/T 15566.3 Principles and requirements for the establishment of public information guidance system Part 3.Railway passenger stations
GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide
GB/T 38604.1 Evaluation requirements for public information-oriented systems-Part 1.General
3 Terms and definitions
The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.
4 General
4.1 The evaluation work shall comply with the requirements of GB/T 38604.1.
4.2 The scope of evaluation shall be determined according to the purpose of evaluation. For example, for the overall evaluation of a certain area, the evaluation scope should be all railway travel in the city.
Bus station.
4.3 The evaluation period shall be determined according to the operating conditions of railway passenger stations. For example, for new or rebuilt railway passenger station guidance systems
Evaluation can be carried out 3 months after the official operation.
5 Preparation
5.1 Evaluation scope
The evaluation scope of the railway passenger station guidance system includes individual station evaluation and special evaluation. The evaluation of a single station should be a certain
Specific railway passenger stations; special evaluation can carry out evaluation on specific lines, certain areas or specific time periods.
5.2 Evaluation cycle
The evaluation of a single station should be matched with the progress of new construction, reconstruction, expansion or maintenance of the railway passenger station guidance system. Special evaluation can be based on actual
Need to develop.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38604.2-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 38604.2-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38604.2-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38604.2-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|