US$229.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38604.3-2020: Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 38604.3-2020 | English | 229 |
Add to Cart
|
3 days [Need to translate]
|
Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station
| Valid |
GB/T 38604.3-2020
|
PDF similar to GB/T 38604.3-2020
Basic data | Standard ID | GB/T 38604.3-2020 (GB/T38604.3-2020) | | Description (Translated English) | Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | A22 | | Classification of International Standard | 01.080.10 | | Word Count Estimation | 12,111 | | Date of Issue | 2020-03-31 | | Date of Implementation | 2020-10-01 | | Quoted Standard | GB/T 15565; GB/T 15566.4; GB/T 19038; GB/T 38604.1 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration | | Summary | This standard specifies the principles for the evaluation of the public information guidance system of urban rail transit stations (hereinafter referred to as the guidance system of rail transit stations), and specifies the requirements for preliminary preparation, evaluation implementation and evaluation results. This standard is applicable to the evaluation of new construction, reconstruction, expansion and maintenance of public information guidance systems in urban rail transit stations. |
GB/T 38604.3-2020: Public information guidance systems - Assessment requirement - Part 3: Urban rail transit station ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Public information guidance systems - Assessment requirement - Part 3.Urban rail transit station
ICS 01.080.10
A22
National Standards of People's Republic of China
Public information-oriented system evaluation requirements
Part 3.Urban Rail Transit Station
2020-03-31 released
2020-10-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General 1
5 Preparation 1
5.1 Evaluation scope 1
5.2 Evaluation cycle 1
5.3 Evaluation Index 2
5.4 Evaluation plan 5
6 Evaluation Implementation 6
7 Evaluation conclusion 6
Appendix A (informative appendix) Field test method 7
Appendix B (informative appendix) Sample 8 of questionnaire for rail transit station guidance system
Table 1 Evaluation index system of rail transit station guidance system 2
Form B.1 Investigator fills in 8
Form B.2 Passenger fills in 8
Foreword
GB/T 38604 "Public Information Oriented System Evaluation Requirements" consists of the following parts.
---Part 1.General Provisions;
---Part 2.Railway passenger station;
---Part 3.Urban rail transit station;
---Part 4.Bus and tram station.
This part is Part 3 of GB/T 38604.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
This part was proposed and managed by the National Graphic Symbol Standardization Technical Committee (SAC/TC59).
Drafting organizations of this section. China National Institute of Standardization, Beijing Forestry University, Beijing Municipal Transportation Committee, CRRC Qingdao Sifang Locomotive and Rolling Stock
Co., Ltd., Beijing Rail Transit Design and Research Institute Co., Ltd., Shandong Institute of Standardization, Beijing Metro Operation Co., Ltd.
The main drafters of this section. Zou Chuanyu, Wang Guangxin, An Xiaofen, Bai Lu, Dai Keping, Gao Jindong, Zhou Ke, Chen Yongquan, Zhang Liang, Luo Yanyan,
Wang Haiyan.
Public information-oriented system evaluation requirements
Part 3.Urban Rail Transit Station
1 Scope
This part of GB/T 38604 clarifies the public information guidance system of urban rail transit stations (hereinafter referred to as rail transit station guidance
The principle of systematic) evaluation stipulates the requirements of preliminary preparation, evaluation implementation and evaluation results.
This part is applicable to the evaluation of urban rail transit station construction, reconstruction, expansion and maintenance of public information guidance system.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 15565 Graphical Symbol Terms
GB/T 15566.4 Principles and Requirements for Public Information Guidance System Setting Part 4.Public Transport Station
GB/T 19038 Customer Satisfaction Evaluation Model and Method Guide
GB/T 38604.1 Evaluation requirements for public information-oriented systems-Part 1.General
3 Terms and definitions
The terms and definitions defined in GB/T 15565 and GB/T 19038 apply to this document.
4 General
4.1 The evaluation work shall comply with the requirements of GB/T 38604.1.
4.2 The evaluation scope should be determined according to the objectives of the evaluation work. For example, for the overall evaluation of a certain city, the evaluation scope should cover the city
All urban rail transit lines that have been opened.
4.3 The evaluation period should be determined according to the scale of the urban rail transit network, operating years, and evaluation objectives.
Evaluation to the system can be carried out 3 months after the formal operation.
5 Preparation
5.1 Evaluation scope
The evaluation scope of rail transit station guidance system is divided into whole network evaluation and special evaluation. The whole network evaluation should cover the whole operation of a certain city
Time period, full operation line; special evaluation can carry out evaluation on specific line, specific station, specific operation period (such as peak period), etc.
5.2 Evaluation cycle
The evaluation cycle of the whole network evaluation should be no less than once a year, and special evaluation can be carried out according to actual needs.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38604.3-2020_English be delivered?Answer: Upon your order, we will start to translate GB/T 38604.3-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38604.3-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38604.3-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|