|
US$199.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38141-2019: Fireworks - Technical requirements for drying system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 38141-2019 | English | 199 |
Add to Cart
|
3 days [Need to translate]
|
Fireworks - Technical requirements for drying system
| Valid |
GB/T 38141-2019
|
PDF similar to GB/T 38141-2019
Basic data | Standard ID | GB/T 38141-2019 (GB/T38141-2019) | | Description (Translated English) | Fireworks - Technical requirements for drying system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | Y88 | | Classification of International Standard | 71.100.30 | | Word Count Estimation | 10,197 | | Date of Issue | 2019-10-18 | | Date of Implementation | 2020-05-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 38141-2019: Fireworks - Technical requirements for drying system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Fireworks--Technical requirements for drying system
ICS 71.100.30
Y88
National Standards of People's Republic of China
Fireworks and firecracker drying system technical requirements
Published on.2019-10-18
2020-05-01 implementation
State market supervision and administration
China National Standardization Administration issued
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. Publication of this document
The organization does not assume responsibility for identifying these patents.
This standard was proposed by the China Light Industry Association.
This standard is under the jurisdiction of the National Fireworks and Firecrackers Standardization Technical Committee (SAC/TC149).
This standard was drafted. Hunan Fireworks and Firecracker Product Safety Quality Supervision and Inspection Center, Liaoning Province Fireworks and Firecracker Product Quality Supervision and Inspection
Xin, Changsha Yueqi Energy Saving Electrical Equipment Co., Ltd., Liuyang City, Hunan Province, selected Ming Thermal Equipment Co., Ltd.
The main drafters of this standard. Zhu Yuping, Huang Chaxiang, Fang Wei, Zhang Jiyun, Yan Jinliang, Tang Yulin, Fu Dongliang, Tang Shiguo, Wang Chuantang.
Fireworks and firecracker drying system technical requirements
1 Scope
This standard specifies the classification, design, technical requirements, inspection methods, inspection rules, signs, packaging, transportation and fireworks and firecracker drying systems.
Store.
This standard applies to dry drying systems such as fireworks and firecrackers, pyrotechnics, effect parts, and fuses.
This standard does not apply to natural drying such as drying yards and drying without drug materials.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 191 packaging storage and transportation icon
GB 3836.1 Explosive atmosphere - Part 1. General requirements for equipment
GB 5083 General safety and hygiene design of production equipment
GB 5226.1 Mechanical electrical safety machinery and electrical equipment - Part 1. General technical conditions
GB 8624 Classification of combustion properties of building materials and products
GB/T 9969 General guidelines for the use of industrial products
GB 11652 Fireworks and Firecracker Operation Safety Technical Regulations
GB 12476.1 Electrical equipment for use in flammable atmospheres - Part 1. General requirements
GB/T 13306 signage
General technical conditions for GB/T 13384 mechanical and electrical product packaging
GB/T 16507 (all parts) water tube boiler
GB/T 20801 (all parts) Pressure piping specification industrial piping
GB 25131 Vapor compression cycle cold water (heat pump) unit safety requirements
GB 50161 Fireworks and Firecracker Engineering Design Safety Specification
AQ4106 Fireworks and Firecracker Workplace Grounding Resistance Measurement Method
AQ4115 Fireworks and Firecrackers General Guidelines for Preventing Static Electricity
QB/T 1588.1 General technical conditions for welding parts of light industrial machinery
3 Terms and definitions
The following terms and definitions as defined in GB 11652 and GB 50161 apply to this document.
3.1
Drying system dryingsystem
Drying the air by energy conversion, drying the fireworks and pyrotechnic products, pyrotechnics, effect parts (both naked and non-naked), fuses, etc.
Equipment facility system.
Note. The drying system is divided into a hot air drying system and a heat transfer medium (water heating and heat transfer oil, etc.) drying system.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38141-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38141-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 38141-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38141-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|