HOME   Cart(4)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 37818-2019 English PDF

US$439.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 37818-2019: Index system and assessment methods of green shipbuilding for shipbuilding enterprise
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 37818-2019English439 Add to Cart 4 days [Need to translate] Index system and assessment methods of green shipbuilding for shipbuilding enterprise Valid GB/T 37818-2019

PDF similar to GB/T 37818-2019


Standard similar to GB/T 37818-2019

GB/T 7094   CB 1146.9   GB/T 37441   GB/T 37325   

Basic data

Standard ID GB/T 37818-2019 (GB/T37818-2019)
Description (Translated English) Index system and assessment methods of green shipbuilding for shipbuilding enterprise
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard U01
Classification of International Standard 49.020.01
Word Count Estimation 22,296
Date of Issue 2019-08-30
Date of Implementation 2020-03-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 37818-2019: Index system and assessment methods of green shipbuilding for shipbuilding enterprise


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Index system and assessment methods of green shipbuilding for shipbuilding enterprise ICS 47.020.01 U01 National Standards of People's Republic of China Green shipbuilding evaluation index system for shipbuilding enterprises and Evaluation method Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 Green Shipbuilding Evaluation Index System Framework 2 6 Evaluation indicators and methods 4 6.1 Evaluation indicators and their interpretations 4 6.2 Indicator evaluation method 6 7 Evaluation principles and procedures 15 7.1 Evaluation Principle 15 7.2 Evaluation procedure 16 7.3 Evaluation index weight 16 7.4 Comprehensive assessment 17 7.5 veto 18

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Marine Ship Standardization Technical Committee (SAC/TC12). This standard was drafted. China Shipbuilding Industry Comprehensive Technology and Economic Research Institute, China Shipbuilding Industry Corporation No. 11 Research Institute, Hudong China Shipbuilding (Group) Co., Ltd., Shanghai Waigaoqiao Shipbuilding Co., Ltd., Guangzhou Shipyard International Co., Ltd. The main drafters of this standard. Li Jun, Xia Yongfeng, Han Xiaoyu, Zhou Chengyin, Sun Nan, Cheng Yang, Wu Yanzi, Song Yanyuan, Feng Bukun. Green shipbuilding evaluation index system for shipbuilding enterprises and Evaluation method

1 Scope

This standard stipulates the framework, evaluation indicators and methods, evaluation principles and procedures for the evaluation index system for green shipbuilding of shipbuilding enterprises. This standard is applicable to the comprehensive evaluation of green shipbuilding by shipbuilding enterprises.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 12348-2008 Environmental noise emission standards for industrial enterprises GB/T 15190-2014 Technical specification for the division of acoustic environment functional areas GB 16297-1996 Integrated emission standards for atmospheric pollutants GB/T 23331 Energy Management System Requirements GB/T 24001 Environmental Management System Requirements and User Guide GB/T 50087-2013 Industrial Enterprise Noise Control Design Specification CB/T 3484-2011 Civil ship revised gross tonnage calculation HJ/T 399-2007 Determination of chemical oxygen demand in water quality - Rapid digestion spectrophotometric method HJ828-2017 Determination of chemical oxygen demand in water - Dichromate method ISO 14001 Environmental Management System Requirements and Guidelines for Use (Environmental managementsystems- Requirementswithguidanceforuse) ISO 50001 Energy Management System Requirements and Usage Guide (Energymanagementsystems-Requirementswith Guidanceforuse)

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Green shipbuilding greenshipbuilding On the scale of environmental values, using construction techniques such as mechanization, automation, tooling, and intelligence to ensure the basic functions of marine products, Under the conditions of quality and economic cost, the negative impact of ship construction activities on the ecological environment is continuously reduced. 3.2 Green shipbuilding evaluation index system indexsystemofgreenshipbuildingassessment Considering various factors such as resources, energy, environment, occupational health and safety, covering the impact of shipbuilding activities on the environment Factors, indicators system for analyzing and evaluating the economic rationality, environmental coordination, and technological advancement of shipbuilding activities. 3.3 Actual time-actualman-hour The actual time spent by the operator to complete a task, including the effective working hours (qualified product hours, overtime hours), invalid work

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 37818-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 37818-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 37818-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 37818-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.