HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 37546-2019 English PDF

US$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 37546-2019: Technical specification for unattended substation monitoring and control system
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 37546-2019English279 Add to Cart 3 days [Need to translate] Technical specification for unattended substation monitoring and control system Valid GB/T 37546-2019

PDF similar to GB/T 37546-2019


Standard similar to GB/T 37546-2019

GB/T 40609   GB/T 40615   GB/T 40588   GB/T 45418   GB/T 37548   

Basic data

Standard ID GB/T 37546-2019 (GB/T37546-2019)
Description (Translated English) Technical specification for unattended substation monitoring and control system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F21
Classification of International Standard 29.240.01
Word Count Estimation 14,160
Date of Issue 2019-06-04
Date of Implementation 2020-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 37546-2019: Technical specification for unattended substation monitoring and control system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for unattended substation monitoring and control system ICS 29.240.01 F21 National Standards of People's Republic of China Technical specification for unattended substation monitoring system 2019-06-04 released 2020-01-01 Implementation State Administration for Market Regulation Issued by China National Standardization Administration

Table of contents

Foreword Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Abbreviations 2 5 General requirements 2 6 System structure and configuration 2 6.1 Architecture 2 6.2 Hardware configuration and function 3 6.3 Software configuration 4 7 Functional requirements 4 7.1 Data Collection 4 7.2 Data Processing 4 7.3 Operation monitoring 4 7.4 Smart Alarm 4 7.5 Operation control 5 7.6 Anti-misoperation locking 5 7.7 Operation Management 5 7.8 Auxiliary monitoring 5 7.9 Information Transmission 6 7.10 Time synchronization 6 8 Security 6 9 Performance requirements 7 9.1 System performance 7 9.2 Device performance 7 10 Technical conditions 8 10.1 Power requirements 8 10.2 Site and environmental requirements 8 10.3 Lightning protection and grounding 9 Appendix A (informative appendix) Data collection content of substation monitoring system 10

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents. This standard was proposed by the China Electricity Council. This standard is under the jurisdiction of the National Power System Management and Information Exchange Standardization Technical Committee (SAC/TC82). Drafting organizations of this standard. State Grid Jiangsu Electric Power Co., Ltd. Electric Power Research Institute, State Grid Jiangsu Electric Power Co., Ltd., NARI Group Co., Ltd., Guodian NARI Technology Co., Ltd., State Grid Co., Ltd. Power Dispatching Control Center, China Southern Power Grid Co., Ltd. Company System Operation Department (Power Dispatching Control Center), China Electric Power Research Institute Co., Ltd., State Grid Jilin Province Electric Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Jibei Electric Power Co., Ltd., Guangdong Power Grid Co., Ltd. Electric Power Research Institute, State Grid Sichuan Provincial Power Power Co., Ltd. Electric Power Research Institute. The main drafters of this standard. Lu Xiao, Zhang Qibing, Peng Zhiqiang, Zhang Haibin, Wang Yongfu, Zhang Ximing, Su Dawei, Zhou Bin, Huo Xuesong, Liu Yi, Zhang Xiaoyi, Gao Lei, Bu Qiangsheng, Ni Yimin, Li Jinsong, Yang Song, Du Qiwei, Li Jin, Hu Chunchao, Han Kai, Zheng Yongkang, Li Yi, Bai Yudong, Tengyun, Zheng Mingzhong, Zhou Qi, Xu Guangting. Technical specification for unattended substation monitoring system

1 Scope

This standard specifies the overall requirements, system structure and configuration, functional requirements, safety protection, performance requirements of the unattended substation monitoring system Sum technical conditions. This standard is applicable to the design, construction, equipment development, testing and monitoring of unattended substation monitoring systems with voltage levels of 35kV and above. acceptance.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB/T 13729 Telecontrol terminal equipment GB 17859 Classification criteria for security protection grades of computer information systems GB/T 22240 Information Security Technology Information System Security Level Protection Rating Guidelines GB/T 25058 Information Security Technology Information System Security Level Protection Implementation Guide GB/T 30155 Technical Guidelines for Smart Substation GB/T 33602 Power System General Service Agreement GB/T 34132 General technical conditions for intelligent terminal devices in intelligent substations DL/T 282 Technical Conditions of Merging Unit DL/T 476 Power system real-time data communication application layer protocol DL/T 634.5104 Telecontrol equipment and system Part 5-104.Transmission protocol adopts IEC of standard transmission protocol subset 60870-5-101 network access DL/T 667 Telecontrol Equipment and System Part 5.Transmission Protocol Part 103.Supporting Standards for Information Interface of Relay Protection Equipment DL/T 860 (all parts) Electric power automation communication network and system DL/T 1146 DL/T 860 implementation technical specifications DL/T 1230 Power System Graphic Description Specification DL/T 1241 Technical Specification for Power Industry Ethernet Switch DL/T 1403 Technical Specification for Intelligent Substation Monitoring System DL/T 1404 Technical Specification for Prevention of Electrical Misoperation in Substation Monitoring System DL/T 1512 Technical specification for substation measurement and control device DL/T 1708 Power System Sequence Control Technical Specification DL/T 5149-2001 220kV~500kV Substation Computer Monitoring System Design Technical Specification Provisions on the Safety Protection of Electric Power Monitoring Systems (Order No. 14 of the National Development and Reform Commission of the People's Republic of China (2014))

3 Terms and definitions

The following terms and definitions defined in GB/T 13729, GB/T 30155, DL/T 860 and DL/T 1403 apply to this document.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 37546-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 37546-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 37546-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 37546-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.