HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 34147-2017 English PDF

US$199.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 34147-2017: Technical guides for water saving assessment
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 34147-2017English199 Add to Cart 3 days [Need to translate] Technical guides for water saving assessment Valid GB/T 34147-2017

PDF similar to GB/T 34147-2017


Standard similar to GB/T 34147-2017

GB/T 35073   GB 35971   GB/T 35071   GB/T 34149   GB/T 34148   

Basic data

Standard ID GB/T 34147-2017 (GB/T34147-2017)
Description (Translated English) Technical guides for water saving assessment
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F04
Word Count Estimation 10,153
Date of Issue 2017-09-07
Date of Implementation 2018-04-01
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 34147-2017: Technical guides for water saving assessment

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical guides for water saving assessment ICS 13.060.25 F04 National Standards of People's Republic of China Project water-saving evaluation techniques 2017-09-07 Posted 2018-04-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard proposed by the Ministry of Water Resources, National Development and Reform Commission. This standard by the National Water Standardization Technical Committee (SAC/TC442) centralized. This standard was drafted unit. China National Institute of Standardization, Beijing Xinhua Certified Water Products Co., Ltd., Ministry of Water Resources Water Management Center, North Beijing Cathay Pacific Water Development Co., Ltd., China Institute of Water Resources and Hydropower Research. The main drafters of this standard. Zhangjiqun, Yin Chunxia, Liu Jing, Zhu Chunyan, Luo Lin, Yang Yanlong, Wu Yihong, Hu Mengting, Feng Zhixiang, Wang Hua, Chen Bo, Tan Lin Shan, Wang Tao, Xu Feng Ran, Sun Qiang, Zhang Lifeng. Project water-saving evaluation techniques

1 Scope

This standard specifies the terms and definitions of water-saving assessment of the project, the basic requirements, procedures and methods. This standard applies to water-saving technological transformation projects (hereinafter referred to as "project") water-saving assessment, new projects, water-saving management project assessment Can refer to use.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 7119 water-saving business evaluation guidelines GB/T 18916 (all parts) water quota GB 24789 water units of water measuring instruments and management of general rules Guideline for evaluation of water-saving service units in service industry GB/T 26922 GB/T 30949 water-saving irrigation project evaluation criteria GB 50555 civil building water-saving design standards GB/T 34148 project water-saving calculation guidelines

3 Terms and definitions

GB/T 34148 defined and the following terms and definitions apply to this document. 3.1 Water saving assessment watersavingassessment The project of water-saving and reduction of water, water efficiency, water-saving benefits such as analysis, evaluation and validation process. 3.2 Baseline baselineperiod To compare and determine the amount of water-saving, water-saving measures before the implementation of a certain period of time. 3.3 Statistical report period To compare and determine the amount of water-saving, water-saving measures after the implementation of a certain period of time. 3.4 Project boundary projectboundary The geographical scope of the units (enterprises), systems and equipment involved in the project or the scope of their management. 3.5 Adjust water withdrawal Water use units (enterprises), systems and equipment within the boundary of the project will be used to take water before the project is implemented, and after the conditions are calibrated according to the statistical reporting period Get the amount of water.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 34147-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 34147-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 34147-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 34147-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.