HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (1 Nov 2025)

GB/T 32878-2016 English PDF

US$439.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32878-2016: Code of operation for reversible pump-turbine regulating system
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 32878-2016English439 Add to Cart 4 days [Need to translate] Code of operation for reversible pump-turbine regulating system Valid GB/T 32878-2016

PDF similar to GB/T 32878-2016


Standard similar to GB/T 32878-2016

DL/T 345   DL/T 805.4   DL/T 435   GB/T 43794   GB/T 37141.1   

Basic data

Standard ID GB/T 32878-2016 (GB/T32878-2016)
Description (Translated English) Code of operation for reversible pump-turbine regulating system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F23
Classification of International Standard 27.140
Word Count Estimation 22,278
Date of Issue 2016-08-29
Date of Implementation 2017-03-01
Regulation (derived from) National Standard Announcement 2016 No.14
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32878-2016: Code of operation for reversible pump-turbine regulating system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of operation for reversible pump-turbine regulation system ICS 27.140 F23 National Standards of People's Republic of China Code for operation of reversible pump - turbine regulating system 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 basic requirements 2 5 running mode 5 6 Run the operation 6 7 inspection inspection 11 8 failure and accident handling 12 Appendix A (informative) The basic content of the operational procedures for reversible pump turbine regulation systems 17

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This standard is proposed by the China Electricity Council and centralized. This standard is responsible for drafting units. State Grid New Source Holdings Limited, China Southern Power Grid Shoufeng FM Power Generation Company. This standard participates in the drafting unit. State Network New Source Holding Co., Ltd. Technology Center, East China Tianhuangping Pumped Storage Co., Ltd., State Grid New Source Holdings Co., Ltd. Beijing Shisanling storage power plant, Fujian Xianyou Pumped Storage Co., Ltd. The main drafters of this standard. Gao Sujie, Ren Zhiyu, Yi Chengyong, Li Guohe, Wu Yi, Li Shaochun, Zhong Chonghe, Bi Yang, Deng Lei, Zheng Kai, Zhou Pan, Zhao Yifeng, Wu Haixin, Wang Xiaoyi, Zhang Bin, Wang Wei, Zhou Xijun, Du Yi, Huang Kun, Sun Zhanghao, Zhou Dongyue. Code for operation of reversible pump - turbine regulating system

1 Scope

This standard specifies the basic requirements for the operation of a reversible pump turbine regulator system, operation mode, operation operation, inspection inspection, fault and Accident handling and other requirements. This standard is applicable to the operation of the reversible pump water turbine regulating system.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Technical condition of hydraulic turbine control system GB/T 9652.1-2007 Code of Practice for DL/T 293 Pumped Storage and Reversible Pump Turbine Technical specification for hydraulic fluid control system and device for hydraulic turbine Code for operation and maintenance of turbine control system and device for DL/T 792-2013

3 terms and definitions

The following terms and definitions apply to this document. 3.1 Non-synchronized guide vanes misalignedguidevane Considering the influence of the hydraulic characteristics of the unit, in order to maintain the stability of the unit when the deadline is fixed at the rated speed, the linkage of the control ring On the realization of a separate control of the guide vane. 3.2 Oil pressureuresupply systems Means for supplying the synchronous guide vanes and/or non-synchronized guide vanes for operating oil. 3.3 Power control activepowercontrol When the power generation conditions, the monitoring system to the governor to send analog or digital (communication mode) in the form of active power setpoint, the governor from Line to the active power of the closed-loop control of the adjustment mode. 3.4 Opening control The governor adjusts the vane opening to the closed loop control mode. 3.5 Speed/frequency control When the unit is in the no-load power generation, isolated power grid, line charging, black start and back to back start running, the governor to a given frequency for the regulation Target, according to the frequency feedback changes automatically adjust the guide vane opening, so that the unit frequency to maintain a certain range of adjustment mode. 3.6 Primary frequency primary frequencycontrol Unit in the power generation conditions in the opening adjustment mode and power adjustment mode, when the system frequency changes more than the governor of the frequency/speed dead

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32878-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32878-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32878-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32878-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information