|
US$319.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32673-2016: Technical guide of fault inspection for overhead transmission line Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 32673-2016 | English | 319 |
Add to Cart
|
4 days [Need to translate]
|
Technical guide of fault inspection for overhead transmission line
| Valid |
GB/T 32673-2016
|
PDF similar to GB/T 32673-2016
Basic data | Standard ID | GB/T 32673-2016 (GB/T32673-2016) | | Description (Translated English) | Technical guide of fault inspection for overhead transmission line | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | P62 | | Classification of International Standard | 29.240.20 | | Word Count Estimation | 16,115 | | Date of Issue | 2016-04-25 | | Date of Implementation | 2016-11-01 | | Quoted Standard | DL/T 741 | | Regulation (derived from) | National Standard Announcement No | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard stipulates the fault classification of AC and DC overhead transmission line fault inspection, preparation before patrol, inspection content and fault nature and fault type discrimination. This standard applies to 66kV and above AC and DC overhead transmission lines fault inspection. |
GB/T 32673-2016: Technical guide of fault inspection for overhead transmission line---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical guide of fault inspection for overhead transmission line
ICS 29.240.20
P62
National Standards of People's Republic of China
Technical Guidelines for Trouble Surveillance of Overhead Transmission Lines
2016-04-25 released
2016-11-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The release of this document
The Agency does not assume responsibility for identifying these patents.
This standard is proposed by the China Electricity Council.
This standard is under the jurisdiction of the Subcommittee on Line Operation of the National Aerial Line Standardization Technical Committee (SAC/TC202/SC1).
The main drafting of the standard units. China Electric Power Research Institute, the State Grid Hubei Electric Power Company, the State Grid Henan Electric Power Company, State Grid Zhejiang
Provincial power company, the State Grid Hebei Electric Power Co., Ltd., the State Grid Hebei Electric Power Co., Ltd. maintenance branch, the Guangdong Power Grid Co., Ltd. Power
Scientific Research Institute.
The main drafters of this standard. Shao Xuwei, Cai Huanqing, Zhao Xuesong, Yi Hui, Ma Jianguo, Wu Xiangdong, Zhang Jianhui, Gong Jiangang, Zhang Lihua,
PENG Xiang-yang, TAO Liu-hai, LI Ning, WU Qi-jin, CHEN Hua, LIU Ya-xin, HUANG Jian-feng
Technical Guidelines for Trouble Surveillance of Overhead Transmission Lines
1 Scope
This standard stipulates the fault classification of the fault investigation of the AC and DC overhead transmission lines, the pre-inspection preparation, the inspection contents and the nature of the fault
Fault type discrimination.
This standard applies to 66kV and above AC and DC overhead transmission line fault inspection.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
Operation Procedure for DL/T 741 Overhead Transmission Line
3 terms and definitions
DL/T 741 and the following terms and definitions apply to this document.
3.1
Transmission line fault faultofoverheadtransmissionline
Due to the AC/DC transmission line external environment and the equipment itself caused by the trip or lockout events.
3.2
Fault point
Causing the transmission line to trip the fault location.
3.3
Ground inspection inspectionontheground
After the transmission line fails, in order to find the fault point in time, the inspector personnel in the ground fault area of the line body equipment, channel ring
Customs and ancillary facilities.
3.4
Inspection tower (tower) inspection
In order to make up for the lack of ground inspection, comprehensive and accurate grasp of the upper parts of the tower, guide wire and fittings, insulators and other equipment into the situation
Line of close inspection, including manual alignment and robotic inspection.
3.5
Air inspections
The use of visible light, infrared, ultraviolet, laser radar and other testing equipment, aircraft on the line of the body equipment, ancillary facilities and channel ring
The territory of the air tour, including manned and unmanned aircraft in two forms.
4 fault classification
4.1 ice damage
4.1.1 ice damage is due to the insulator string is ice bridge bridging flashover or ground wire over ice overload, uneven grounding guide ice, lead wire off the ice
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32673-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 32673-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 32673-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32673-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|