US$659.00 ยท In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32451-2015: Space project management Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 32451-2015 | English | 659 |
Add to Cart
|
6 days [Need to translate]
|
Space project management
| Valid |
GB/T 32451-2015
|
PDF similar to GB/T 32451-2015
Basic data | Standard ID | GB/T 32451-2015 (GB/T32451-2015) | | Description (Translated English) | Space project management | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | V01 | | Classification of International Standard | 49.140 | | Word Count Estimation | 31,373 | | Date of Issue | 2015-12-31 | | Date of Implementation | 2016-07-01 | | Quoted Standard | GB/T 19000-2008; GB/T 19001-2008; GB/T 19017-2008; GB/T 32299-2015; ISO 11893; ISO 21351; ISO 27026 | | Adopted Standard | ISO 14300-1-2011, MOD | | Regulation (derived from) | State Standard Announcement 2015 No.43 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This International Standard specifies the requirements for aerospace program/project management in a top-down manner for the contractual relationship between the customer and the supplier. The product warranty requirements are in accordance with the relevant standards. Note: A program is a collection of items. In this standard, "Program" and "Project" may be used in the same context. This standard serves as a basic document for aerospace project management to develop and coordinate customer project management requirements and to guide the supplier in fulfilling these project management requirements. This standard requires that the roles, responsibilities and authorities of different customers and suppliers should be clear, that customer and supplier activities should be coordinated, that information between customers and suppliers should be interoperable, that stable and rigorous project organizations be established, that different projects/The rules of the project should be as normal as possible. Can be tailored according to the actual situation. |
GB/T 32451-2015: Space project management---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Space project management
ICS 49.140
V01
National Standards of People's Republic of China
Aerospace project management
(ISO 14300-1..2011, Spacesystems-Programmemanagement-
Part 1. Structuringofaproject, MOD)
2015-12-31 released
2016-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface I
Introduction II
1 Scope 1
2 normative reference document 1
3 Terms and definitions 1
4 acronym 2
Project management practices and plans
Work breakdown structure
Project organization
Planning and planning of project phases
9 Cost and Schedule Management 14
10 Technical Status Management 17
Integrated Logistics Support (ILS)
Document and Information Management
Risk Management 23
14 items ending 24
Appendix A (informative) This standard differs from ISO 14300-1..2011 Technical differences and their causes 26
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard uses the re-drafting method to modify ISO 14300-1..2011 "Aerospace Systems Program Management Part 1. Projects
structure".
Taking into account our national conditions, in the use of ISO 14300-1..2011, the standard made some changes. The technical differences have been compiled
And in the margins of the terms of the articles in which they relate. These technical differences and their differences are given in Appendix A.
List of reasons for reference.
This standard has also made the following editorial changes.
a) the word "international standard" is changed to "this standard";
b) Prerequisites for the removal of international standards.
This standard is proposed by China Aerospace Science and Technology Corporation.
This standard is nationalized by the National Aeronautical Technology and Its Application Standardization Technical Committee (SAC/TC425).
The drafting of this standard. China Aerospace Standardization Institute, China Space Technology Research Institute.
The main drafters of this standard. Zhu Yiwei, Yang Weiyuan, Luo Ying, Gan Xuyi, Huo Yuqian, Wang Linlin, Tong Xin.
Introduction
This standard specifies an overview and requirements for the management of aerospace projects aimed at optimizing performance, cost and schedule, and reducing risk.
Project management is an indispensable element of any project, but for aerospace systems, it is even more important due to the following characteristics.
--- special space environmental conditions;
--- high performance requirements;
Small batch
- limited exposure to the product during operation;
--- In the event of failure in flight failure;
--- the high complexity of the organization;
--- high cost.
The requirements of this project management requirements will regulate China's space project management, promote and facilitate international space cooperation.
Aerospace project management
1 Scope
This standard specifies the space program/project management requirements, through the top-down approach, for the customer and the contract between the supplier.
The requirements for product assurance shall be in accordance with the relevant standards.
Note. A project is a collection of items. In this standard, "program" and "project" can be used in the same context.
This standard serves as a basic document for the management of aerospace projects to develop and coordinate customer project management requirements and guide the supplier to complete these items.
Management requirements.
This standard requires.
The roles, responsibilities and authorities of different customers and suppliers should be clear;
- customer and supplier activities should be coordinated;
- information between customers and suppliers should be interoperable;
--- should establish a stable and rigorous project organization;
The rules applied to different programs/projects should be as standardized as possible.
Can be tailored according to the actual situation.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 19000-2008 Quality management system foundation and terminology (ISO 9000..2005, IDT)
GB/T 19001-2008 Quality management system requirements (ISO 9001..2008, IDT)
GB/T 19017-2008 Technical Management Guide for Quality Management Systems (ISO 10007..2003, IDT)
GB/T 32299-2015 Aerospace project risk management (ISO 17666..2003, MOD)
ISO 11893 Space Systems Project Management Project Organization (Spacesystems-Programmemanagement-Project
organization
ISO 21351 Aerospace System Functions and Specifications (Spacesystems-Functional andtechnicalspecifications)
ISO 27026 Space System Project Management Project Management Structure Decomposition (Spacesystems-Programmemanage-
ment-breakdownprojectmanagementstructures
3 terms and definitions
GB/T 19000-2008 Definitions and the following terms and definitions apply to this document.
3.1
Project project
A series of start and end dates to achieve a specific goal requires coordination and control. Work should be in line with schedule, cost and
Resources and other aspects of the specific requirements.
3.2
Program program
A collection of closely related items. Through the coordination of their management can be obtained separately project management is difficult to obtain the whole
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32451-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 32451-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 32451-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32451-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|