HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 30577-2014 English PDF

US$329.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30577-2014: Specification of heat recovery steam generator for combined-cycle for gas-steam
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 30577-2014English329 Add to Cart 3 days [Need to translate] Specification of heat recovery steam generator for combined-cycle for gas-steam Valid GB/T 30577-2014

PDF similar to GB/T 30577-2014


Standard similar to GB/T 30577-2014

GB/T 24747   GB/T 22395   GB/T 16508.8   GB/T 30580   GB/T 30581   GB/T 30576   

Basic data

Standard ID GB/T 30577-2014 (GB/T30577-2014)
Description (Translated English) Specification of heat recovery steam generator for combined-cycle for gas-steam
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J98
Classification of International Standard 27.060.30
Word Count Estimation 14,131
Date of Issue 5/6/2014
Date of Implementation 12/1/2014
Quoted Standard GB/T 9222; GB/T 10184; GB/T 10863; GB/T 12145; GB/T 12348; GB 13223; GB 13271; GB/T 28056; GB 50016; GB 50160; JB/T 1612; JB/T 1613; JB/T 1615; JB/T 3191; JB/T 3375; JB/T 6511; JB/T 6512; JB/T 8953.3; DL/T 5047
Regulation (derived from) National Standards Bulletin No. 9 2014
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This Standard specifies the gas - steam combined cycle waste heat boiler range of parameters and performance requirements, as well as the design, manufacture, installation, use, testing, inspection and quality responsibilities of the technical requirement

GB/T 30577-2014: Specification of heat recovery steam generator for combined-cycle for gas-steam

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification of heat recovery steam generator for combined-cycle for gas-steam ICS 27.060.30 J98 National Standards of People's Republic of China Gas - steam Combined Cycle Heat Recovery Boiler Technical conditions Issued on. 2014-05-06 2014-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 parameters and type 2 5 Technical requirements 3 6 Test 6 7 to paints, packaging and accompanying documents nameplate 6 8 7 Installation and use requirements 9 7 Test and Acceptance 8 10 Quality Responsibility Appendix A (normative) boiler main parts manufacture and acceptance criteria 9

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points. This standard is drafted by. Hangzhou Boiler Group Co., Ltd. Participated in the drafting of this standard. Shanghai Power Equipment Research Institute of Special Equipment Inspection and Research Institute of Zhejiang Province, Xi'an Thermal Power Research Institute Limited, Beijing Electrical Machinery Industry Technical and Economic Research Institute. The main drafters of this standard. Xue in Thailand, Zhaojian Yun, Yang, Shihong Fei, a Defang, Shiyan Zhou, Xu Yuanfeng.

Introduction

The past two decades, gas - steam combined cycle power generation in China has developed rapidly, especially in recent years the construction of a large number of high-capacity, high Efficiency of Gas - steam combined cycle power plants, contributed significantly to the gas - steam combined cycle HRSG technological developments. HRSG is linked Combined cycle system is an important part, but there is no domestic for gas - steam combined cycle HRSG corresponding professional Standard, design and manufacturing units commonly used in cooperation with famous foreign companies or the introduction of technology, standards and norms development and design. To gauge Fan suitable for the development and summarize the experience of a combined cycle power plant waste heat boiler technology, digestion and absorption of foreign advanced technology and specifications, special The final version of the standard, which enhance and guide the domestic gas turbine waste heat boiler design and manufacturing standards, promoting China's technological innovation has a very heavy To sense. This standard follows the following principles. a) adapt the technical characteristics of combined cycle power plant waste heat boiler, regulate the domestic combined cycle power plant waste heat boiler; b) optimize the HRSG unit sets designed to absorb the introduction of combined cycle power plant waste heat boiler products of advanced technology; c) implement the relevant national energy conservation, environmental protection regulations and policies; d) coordination with the relevant standards. Gas - steam Combined Cycle Heat Recovery Boiler Technical conditions

1 Scope

This standard specifies the gas - steam combined cycle HRSG parameters and performance requirements, as well as the design, manufacture, installation, use, test Inspection, acceptance and quality of the responsibility of the technical requirements. This standard applies to the vapor pressure of not less than 2.4MPa, and water as a medium of gas - steam combined cycle waste heat boiler; suitable for fill Burning or non supplementary fired heat recovery boilers. Integrated gasification gas - steam combined cycle (IGCC) system, waste heat boiler can be implemented by reference.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 9222 water tube boiler pressure parts strength calculation Boiler Performance Test procedures GB/T 10184 Power Station GB/T 10863 flue waste heat boiler thermal test methods GB/T 12145 for generating unit and steam power equipment vapor quality GB/T 12348 industrial enterprises of environmental noise emission standard plant boundary GB 13223 Thermal Power Plant Air Pollutant Emission Standards GB 13271 boiler air pollutant emission standards GB/T 28056 flue waste heat boiler General technical requirements GB 50016 architectural design code for fire protection GB 50160 fire protection design of petrochemical enterprises JB/T 1612 boiler hydrostatic test technical conditions JB/T 1613 boiler pressure parts for welding JB/T 1615 boiler paint condition and packaging technology JB/T 3191 boiler drum internal device technology JB/T 3375 boiler materials into the factory acceptance rules JB/T 6511 finned tube box assembly technical conditions JB/T 6512 boiler for producing high-frequency resistance welding spiral fin JB/T 8953.3 Gas - steam Combined Cycle Heat Recovery Boiler Equipment Purchase DL/T 5047 Power Construction and Acceptance of boiler set

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Combined Cycle combinedcycle Gas turbine cycle and the Rankine cycle steam or other fluids with combined thermodynamic cycle.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30577-2014_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30577-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30577-2014_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30577-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.