Specification of heat recovery boiler for notary cement kiln
| Valid |
GB/T 30576-2014
|
PDF similar to GB/T 30576-2014
Basic data | Standard ID | GB/T 30576-2014 (GB/T30576-2014) | | Description (Translated English) | Specification of heat recovery boiler for notary cement kiln | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J98 | | Classification of International Standard | 27.060.30 | | Word Count Estimation | 12,147 | | Date of Issue | 5/6/2014 | | Date of Implementation | 12/1/2014 | | Quoted Standard | GB/T 1576; GB/T 9222; GB/T 10863; GB/T 12145; GB/T 28056; GB 50041; GB 50049; GB 50273; GB 50588-2010; DL/T 5047; JB/T 1615; JB/T 3375; JC/T 336; JC/T 730; JC/T 733 | | Regulation (derived from) | National Standards Bulletin No. 9 2014 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the parameters and performance requirements of cement kiln waste heat boiler, as well as the design, manufacture, installation, use, testing, inspection and quality responsibilities of the technical requirements. This Standard appl |
GB/T 30576-2014: Specification of heat recovery boiler for notary cement kiln---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification of heat recovery boiler for notary cement kiln
ICS 27.060.30
J98
National Standards of People's Republic of China
Cement kiln waste heat boiler technology Condition
Issued on. 2014-05-06
2014-12-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 parameters and model 2
5 Technical requirements 4
6 paints, packaging and accompanying documents nameplate 7
7 7 Installation and use requirements
8 8 and acceptance test
8 9 Quality Responsibility
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points.
This standard was drafted. Hangzhou Boiler Group Co., Ltd., Hangzhou pot Industrial Boiler Co., Ltd., Nanjing Kay can bloom green energy
Source Co., Ltd. Zhejiang Special Equipment Inspection and Research Institute, Shanghai Power Equipment Research Institute.
The main drafters of this standard. solid industry Qin Zheng Shuiyun, Quyun Fu, Wang Yang, Cai Liping, Chen Xiubin.
Cement kiln waste heat boiler technology Condition
1 Scope
This standard specifies the requirements and performance parameters of cement kiln waste heat boiler, as well as the design, manufacture, installation, use, testing, inspection and quality
The amount of liability and other technical requirements.
This standard applies to the use of new dry rotary cement kiln flue gas heat, no help-fired flue waste heat boiler.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 1576 industrial boiler water quality
GB/T 9222 water tube boiler pressure parts strength calculation
GB/T 10863 flue waste heat boiler thermal test methods
GB/T 12145 for generating unit and steam power equipment vapor quality
GB/T 28056 flue waste heat boiler General technical requirements
GB 50041 boiler room design specifications
GB 50049 Small power plant design specifications
GB 50273 boiler installation engineering construction and acceptance
GB 50588-2010 cement plant waste heat power generation design specifications
DL/T 5047 Power Construction and Acceptance of boiler set
JB/T 1615 boiler paint condition and packaging technology
JB/T 3375 boiler the raw material inspection rules
JC/T 336 Cement Industrial reciprocating grate cooler
JC/T 730 cement kiln heat balance, thermal efficiency, comprehensive energy consumption calculation method
JC/T 733 cement kiln heat balance measurement method
3 Terms and Definitions
GB 50588-2010 define the following terms and definitions apply to this document. For ease of use, the following listed repeatedly GB 50588-
2010 Some of the terms and definitions.
3.1
Cement kilns cementkiln
New dry rotary cement kiln system, including rotary kiln, clinker cooler and preheater and other technology equipment.
3.2
Flue gas
Cement kiln kiln clinker cooler exhaust gas discharged (hot air) or preheater kiln exhaust gases.
3.3
Cement kiln waste heat boiler heatrecoveryboilerofrotarycementkiln
Flue gas heat recovery NSP rotary kiln cement kiln clinker cooler and preheater kiln emissions from the production of steam or hot water
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30576-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 30576-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30576-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30576-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|