|
US$799.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30352-2013: Assessment of earthquake disaster situation in emergency period Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 30352-2013 | English | 799 |
Add to Cart
|
6 days [Need to translate]
|
Assessment of earthquake disaster situation in emergency period
| Valid |
GB/T 30352-2013
|
PDF similar to GB/T 30352-2013
Basic data | Standard ID | GB/T 30352-2013 (GB/T30352-2013) | | Description (Translated English) | Assessment of earthquake disaster situation in emergency period | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | P15 | | Classification of International Standard | 91.120.25 | | Word Count Estimation | 36,324 | | Quoted Standard | GB/T 17742; GB/T 18208.4-2011; GB/T 24335; GB/T 24336 | | Regulation (derived from) | National Standards Bulletin 2013 No. 27 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies after the earthquake, the content of the earthquake emergency assessment methods and procedures, and technical requirements. This standard applies to material and particularly significant earthquake disaster emergency assessment. G |
GB/T 30352-2013: Assessment of earthquake disaster situation in emergency period---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Assessment of earthquake disaster situation in emergency period
ICS 91.120.25
P15
National Standards of People's Republic of China
Earthquake emergency evaluation
Issued on. 2013-12-31
2014-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
Introduction Ⅱ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Basic provisions 2
5 3 disaster area and the scope of the assessment
Assessment of seismic intensity 6 5
7 casualties and assess the affected population 6
8 6 Building Damage Assessment
9 lifeline engineering system disaster assessment 7
10 8 earthquake geological hazard assessment
11 - earthquake hazard assessment 9
12 earthquake Social Impact Assessment 10
1013 assessment report prepared
Appendix A (normative) casualties and affected population estimation method 11
Appendix B (normative) Correction intensity isoseismal 14
Annex C (normative) Earthquake Disaster Emergency Assessment Survey Form 15
Content Annex D (normative) earthquake emergency evaluation report 28
References 31
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Seismological Bureau.
This standard by the National Standardization Technical Committee earthquake (SAC/TC225) centralized.
This standard was drafted. Institute of Engineering Mechanics, China Earthquake Administration, Tianjin Seismological Bureau, Seismological Bureau of Xinjiang Uygur Autonomous Region, China earthquake
Emergency Rescue Center, Hebei Provincial Seismological Bureau, Yunnan Seismological Bureau, China Earthquake Administration, Fujian Seismological Bureau, China to earthquake
Damage prevention center.
The main drafters of this standard. both Qi Lin, Miao Chong Gang, Li Yishi, Sun Botao, Yuan Yifan, kings school, Song Lijun, Sun Jingjiang, Du Xiaoxia, Guo Endong,
ZHANG Ling heart, Zhang Qin, Guo Xun, YU Shi Zhou, Zhou whole, Hu Weihua Dried plum Dropping such as Liu Shan, Huang Hongsheng, Liyi Gang, Wang Dongming, Liu Jinlong.
Introduction
Disaster information is an important basis for the Government's decision to deploy relief. After the earthquake, the disaster investigation in a short time and quickly
Assessment (disaster emergency evaluation), in time for the Government to provide the necessary decision-making arrangements, in line with the actual disaster information, is the primary work of earthquake emergency
task. To provide suitable for emergency disaster assessment simple way, unified earthquake emergency assessment, the development of this standard.
This standard is fully summarized in the last 20 years in China earthquake assessment method and field practice, especially in the 2008 Timor
Basis Sichuan 8.0 earthquake and the 2010 Yushu 7.1 earthquake field work experience and lessons on making. This standard
GB/T 18208.3-2011 "earthquake field works - Part 3. Rules for investigation", GB/T 18208.4-2011 "seismic field works
Part 4. Direct disaster damage assessment, "the relevant content coordinated and complete, but the time limit requirement, the present standard is more focused on rapid,
Dynamic acquisition and evaluation of disaster.
Earthquake emergency evaluation
1 Scope
This standard specifies after the earthquake, the earthquake disaster emergency assessment content, methods, procedures and technical requirements.
This standard applies to major and special major earthquake disaster emergency evaluation. General and a larger earthquake can refer to use.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 17742 Chinese seismic intensity scale
GB/T 18208.4-2011 earthquake field works - Part 4. Direct disaster damage assessment
GB/T 24335 construction (structures) Classification of earthquake damage
GB/T 24336 lifeline earthquake engineering damage classification
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Earthquake earthquakedisastersituation
The scope of the earthquake disaster area, grade, and the casualties caused by the earthquake, the destruction of buildings and lifeline engineering, geological disasters and secondary disasters
Basic information on social impacts.
NOTE. rewrite GB/T 18207.1-2008, definitions 7.1.
3.2
Stricken range disasterarea
Earthquake directly caused no casualties, destruction of engineering structures, regional environmental destruction.
Note. the equivalent seismic intensity Ⅵ Ⅵ degrees and degrees or more areas.
3.3
Disaster area rating gradeofdisasterarea
Within the scope of the disaster, to administrative units, considering the casualties, economic losses, house damage, earthquakes and other geological disasters means
Determine the extent of the disaster scale level.
3.4
Pole stricken extremeearthquakedisasterarea
An earthquake disaster direct losses suffered the worst region, excluding no direct impact on social and economic earthquake geological disasters in the region.
NOTE. rewrite GB/T 18208.4-2011, definitions 3.6.
3.5
Thoughts range earthquakefeltarea
In a few people felt the earthquake (seismic intensity equivalent degree Ⅲ) delineation of the boundary area.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30352-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30352-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30352-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30352-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|