| US$689.00 · In stockDelivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
 GB/T 30245.2-2013: Remote input and output instruments for industrial process measurement and control systems -- Part 2: Performance evaluating methods
 Status: Valid
 
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| GB/T 30245.2-2013 | English | 689 | Add to Cart | 5 days [Need to translate] | Remote input and output instruments for industrial process measurement and control systems -- Part 2: Performance evaluating methods | Valid | GB/T 30245.2-2013 |  
	 
       PDF similar to GB/T 30245.2-2013 
 Basic data             | Standard ID | GB/T 30245.2-2013 (GB/T30245.2-2013) |           | Description (Translated English) | Remote input and output instruments for industrial process measurement and control systems -- Part 2: Performance evaluating methods |           | Sector / Industry | National Standard (Recommended) |           | Classification of Chinese Standard | N18 |           | Classification of International Standard | 35.100 |           | Word Count Estimation | 30,374 |           | Quoted Standard | GB/T 2423.1-2008; GB/T 2423.2-2008; GB/T 2423.4-2008; GB/T 2423.5-1995; GB/T 2423.7-1995; GB/T 2423.10-2008; GB/T 2828.1-2012; GB 4208-2008; GB 4793.1-2007; GB 4824-2004; GB/T 4857.5; GB/T 14048.10-2008; GB/T 16842-2008; GB/T 17626.2-2006; GB/T 17626.3-20 |           | Regulation (derived from) | National Standards Bulletin 2013 No. 27 |           | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |           | Summary | This standard specifies the industrial process measurement and control systems with remote input and output devices - Performance evaluation and inspection rules, including test conditions, the test sample, the normal function of the type of work and test | GB/T 30245.2-2013: Remote input and output instruments for industrial process measurement and control systems -- Part 2: Performance evaluating methods---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
 Remote input and output instruments for industrial process measurement and control systems Part 2. Performance evaluating methods
ICS 35.100
N18
National Standards of People's Republic of China
Industrial process measurement and control systems with remote input
Output devices - Part 2. Methods for performance evaluation
andcontrolsystems-Part 2. Performanceevaluatingmethods
Issued on. 2013-12-31
2014-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
 Table of ContentsIntroduction Ⅲ
1 Scope 1
2 Normative references 1
2 3 Acronyms
4 Test conditions 2
3 of 5 test sample
6 to work and function test type 3
7 Electromagnetic compatibility (EMC) type test and validate 16
8 General safety test 22
9 inspection rules 22
10 Other considerations 23
11 24 test reports and documentation
References 25
Test 1 Anti-3rd harmonic 8
Figure 2 gentle stop/start test 10
3 power supply voltage change quickly test 10
4 supply voltage slowly change map test 11
Table 1 3 General test conditions
Table 2 temperature and low temperature test 4
Table 3 resistant/anti-temperature test 4
Table 4 Resistance alternating (12h 12h) Damp heat test 5
Table 5 Vibration Test 6
Table 6 Impact Test 6
Table 7 Resistance/Tolerance free drop test (the portable device and the handheld device) 7
Table 8 free drop test resistance (in the original factory packaging unit) 7
Table 9 to insert/remove the plug-in unit/pull 7
Table 10 anti-ripple voltage and frequency range test 8
Table 11 Anti-3rd harmonic test 8
Table 12 gentle stop/start test 9
Table 13 Power supply voltage variation test 10
Table 14 Anti-voltage interrupt test (function test) 11
Table 15 memory data retention time trial 12
Table 16 Replacing the power supply test 12
Table 17 Digital output overload and short circuit test test 14
Table 18 Measurement of radiated interference 17
Table 19 Measurement of conducted interference 17
Table 20 Electrostatic discharge test 18
Table 21 anti-RF electromagnetic field test 18
Table 22 Anti-power frequency magnetic field test 19
Table 23 Anti-electric fast transient burst test 19
Table 24 against high-energy surge test 20
Table 25 Anti-conductive RF interference test 20
Table 26 anti-decay experiment Sasser 21
Table 27 voltage dips and interruptions immunity 21
Table 28 factory test item 22ForewordGB/T 30245 "industrial process measurement and control systems with remote input and output devices" is divided into two parts.
--- Part 1. General requirements;
--- Part 2. Methods for performance evaluation.
This section is GB/T Part of 230,245.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by China Machinery Industry Federation.
This part of the measurement and control of Standardization Technical Committee (SAC/TC124) is administered by the National industrial processes.
This section is responsible for drafting unit. Southwest University.
Participated in the drafting of this section. Siemens (China) Co., Ltd., Shanghai Automation Instrumentation Co., Huabang De Shenzhen Science and Technology
Ltd., Fujian on the Run Precision Instrument Co., Ltd.
The main drafters of this section. Zhang Yu, Liu Feng.
The drafters of some of the participants. Doulian Wang, Xu Bin, including Wei-hua, Duan dream life, Zou Chong, Ge Jian.
Industrial process measurement and control systems with remote input
Output devices - Part 2. Methods for performance evaluation1 ScopeThis section GB/T 30245 requirements for industrial process measurement and control systems with remote input and output devices - Performance evaluation and inspection
Inspection rules, including test conditions, the test sample, the normal work and functions of type testing, electromagnetic compatibility (EMC) type testing and verification, security
Whole routine testing, inspection rules and other considerations.
This section applies to the sensors and actuators without an industrial process measurement and control system components with the remote input and output devices.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2423.1-2008 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold
GB/T 2423.2-2008 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat
GB/T 2423.4-2008 Environmental testing for electric and electronic products Part 2. Test methods - Test Db. Damp heat (12h
12h cycle)
GB/T 2423.5-1995 Environmental testing for electric and electronic products Part 2. Test methods Test Ea and guidance. Shock
GB/T 2423.7-1995 Environmental testing for electric and electronic products Part 2. Test Ec and guidance. Drop and turn
Down (Primarily for equipment - type specimens)
GB/T 2423.8-1995 Environmental testing for electric and electronic products Part 2. Test methods Test Ed. Free fall
GB/T 2423.10-2008 Environmental testing for electric and electronic products Part 2. Test methods Test Fc. Vibration (sinusoidal)
GB/T 2828.1-2012 Sampling procedures for inspection - Part 1. by acceptance quality limit (AQL) retrieval batch test sample
plan
GB 4208-2008 shell protection (IP code)
GB 4793.1-2007 measurement, control and laboratory safety requirements for electrical equipment - Part 1. General requirements
GB 4824-2004 industrial, scientific and medical (ISM) radio-frequency equipment - Electromagnetic disturbance characteristics - Limits and methods of measurement
GB/T 4857.5 packaging transport package drop test methods
GB/T 14048.10-2008 voltage switchgear and control equipment Part 5-2. Control circuit devices and switching elements proximity
switch
GB/T 16842-2008 housing for people and equipment protection test with a test
GB/T 17626.2-2006 Electromagnetic compatibility - Testing and measurement techniques - Electrostatic discharge immunity test
GB/T 17626.3-2006 Electromagnetic compatibility - Testing and measurement techniques RFEMS test
GB/T 17626.4-2008 Electromagnetic compatibility - Testing and measurement techniques - Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility - Testing and measurement techniques - Surge (impact) immunity test
GB/T 17626.6-2008 Electromagnetic compatibility - Testing and measurement techniques Immunity to conducted disturbances induced field
GB/T 17626.8-2006 Electromagnetic compatibility - Testing and measurement techniques - Power frequency magnetic field immunity test
GB/T 17626.11-2008 Electromagnetic compatibility Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity
test
 
 Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30245.2-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30245.2-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30245.2-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30245.2-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries Question 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected] . In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.    |