| US$929.00 · In stockDelivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
 GB/T 30245.1-2013: Remote input and output instruments for industrial process measurement and control systems -- Part 1: General technical conditions
 Status: Valid
 
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| GB/T 30245.1-2013 | English | 929 | Add to Cart | 7 days [Need to translate] | Remote input and output instruments for industrial process measurement and control systems -- Part 1: General technical conditions | Valid | GB/T 30245.1-2013 |  
	 
       PDF similar to GB/T 30245.1-2013 
 Basic data             | Standard ID | GB/T 30245.1-2013 (GB/T30245.1-2013) |           | Description (Translated English) | Remote input and output instruments for industrial process measurement and control systems -- Part 1: General technical conditions |           | Sector / Industry | National Standard (Recommended) |           | Classification of Chinese Standard | N18 |           | Classification of International Standard | 35.100 |           | Word Count Estimation | 42,458 |           | Quoted Standard | GB/T 156-2007; GB 3836.1; GB 3836.2; GB 3836.4; GB 4793.1-2007; GB/T 5465.1-2009; GB 14048.5-2008; GB/T 15969.1; GB/T 16935.1-2008; GB/T 17799.1-1999; GB/T 17799.2-2003; GB 17799.4-2012; GB/T 30245.2-2013; IEC 61000-4-18-2006 |           | Regulation (derived from) | National Standards Bulletin 2013 No. 27 |           | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |           | Summary | This standard specifies the industrial process measurement and control system (hereinafter referred to as "remote" I/O ") the general technical conditions with remote input and output devices, including terminology and definitions, basic requirements, und | GB/T 30245.1-2013: Remote input and output instruments for industrial process measurement and control systems -- Part 1: General technical conditions---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
 Remote input and output instruments for industrial process measurement and control systems.Part 1. General technical conditions
ICS 35.100
N18
National Standards of People's Republic of China
Industrial process measurement and control systems with remote input
Output devices - Part 1. General requirements
andcontrolsystems-Part 1. Generaltechnicalconditions
Issued on. 2013-12-31
2014-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
 Table of ContentsIntroduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions, abbreviations 2
4 Basic requirements 3
5 normal operating conditions and requirements 4
6 7 functional requirements
7 Electromagnetic compatibility (EMC) requirements 19
8 Information provided by the manufacturer 25
9 provided by the manufacturer of electromagnetic compatibility (EMC) Information 33
10 safety information provided by the manufacturer 33
Appendix A (informative) Digital input operating range of the standard formula 34
Appendix B (Informative Appendix) C Area --- EMC immunity level 35
References 37
1 input/output parameters 9
Figure 2 current sink input UI Workspace 10
Figure 3 AC instantaneous overload of digital output waveform 12
4 digital outputs instantaneous current overload waveform 14
5 Functional ground terminal markings 19
6 anti-EMC District 21
Table 1 Operating ambient temperature for 4
Sinusoidal vibration worksheet 2 Remote I/O conditions 5
Table 3 Portable Remote I/O and handheld remote I/O free fall on the concrete floor 5
Table 4 in the original packaging factory remote I/O components free fall to the cement floor 6
Table 5 input power ratings and scope 7
Table 6 voltage interruptions (functional requirements) 8
Table 7 digital input (current sinking) standard operating range 11
Ratings and operating range Table 8 digital output AC current source 12
Table 9 DC current source and digital output rated operating range (DC) 14
Table 10 DC input and DC output compatibility between the 14
Table 11 analog input impedance ratings and limits 15
Table 12 Analog output impedance limit of 15 ratings and
Table 13 General-resistant dielectric strength test 17
20 Table 14 emission limits
Table 15 anti-EMC area (examples of surge) 21
Table 16. EMC anti-interference performance level 22
Table 17 port test case, A and B areas 22
Table 18 Anti-conductivity test region 23 B
Table 19 Anti-conductivity test, A District 24
Table 20 voltage dips and interruptions (EMC requirements) 25
Table 21 Analog Input static characteristic information 28
Table 22 analog input dynamic characteristic information 29
Table 23 Analog input common characteristic information 29
Table 24 Analog Input other features of information 29
Table 25 Analog output static characteristic information 30
Table 26 analog output dynamic characteristic information 30
General Information Table 27 Analog Output Characteristics 30
Analog output information table 28 other features 31ForewordGB/T 30245 "industrial process measurement and control systems with remote input and output devices" is divided into two parts.
--- Part 1. General requirements;
--- Part 2. Methods for performance evaluation.
This section is GB/T Part of 130,245.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by China Machinery Industry Federation.
This part of the measurement and control of Standardization Technical Committee (SAC/TC124) is administered by the National industrial processes.
This section is responsible for drafting unit. Southwest University.
Participated in the drafting of this section. Siemens (China) Co., Ltd., Shanghai Automation Instrumentation Co., Huabang De Shenzhen Science and Technology
Ltd., Fujian on the Run Precision Instrument Co., Ltd., Beijing Science and Technology Instrument Co., Ltd. Shi Jin.
The main drafters of this section. Zhang Yu, Liu Feng.
The drafters of some of the participants. Doulian Wang, Xu Bin, including Wei-hua, Duan dream life, Zou Chong, Ge Jian, Gong Xiaodong.
Industrial process measurement and control systems with remote input
Output devices - Part 1. General requirements1 ScopeThis section GB/T 30245 requirements for industrial process measurement and control systems with remote input and output devices (hereinafter referred to as "remote
I/O ") of the general technical conditions, including terms and definitions, basic requirements for normal operating conditions and requirements, functional requirements, electromagnetic compatibility
(EMC) requirements, the manufacturer information requirements.
This section applies to the sensors and actuators without an industrial process measurement and control system components with the remote input and output devices.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 156-2007 standard voltage
GB 3836.1 explosive atmospheres - Part 1. General requirements for equipment
GB 3836.2 explosive atmospheres - Part 2. the flameproof enclosure "d" protection equipment
GB 3836.4 explosive atmospheres - Part 4. the intrinsically safe "i" protection equipment
GB 4793.1-2007 measurement, control and laboratory safety requirements for electrical equipment - Part 1. General requirements
GB/T 5465.1-2009 Graphical symbols for electrical equipment - Part 1. Overview and classification
GB 14048.5-2008 Low-voltage switchgear and control equipment Part 5-1. Control circuit devices and switching elements - Electromechanical
Control circuit devices
GB/T 15969.1 Programmable controllers - Part 1. General Information
GB/T 16935.1-2008 within low-voltage systems Insulation coordination for equipment - Part 1. Principles, requirements and tests
GB/T 17799.1-1999 Electromagnetic compatibility - Generic standards for residential, commercial and light industrial environment - Immunity
GB/T 17799.2-2003 Electromagnetic compatibility - Generic standards - Immunity for industrial environments
GB 17799.4-2012 Electromagnetic compatibility - Generic emission standard for industrial environments
GB/T 30245.2-2013 industrial process measurement and control systems with remote input and output devices - Part 2. Methods for performance evaluation
IEC 61000-4-18.2006 Electromagnetic compatibility - Part 4-18 Testing and measurement techniques attenuation Sasser immunity test
[Electromagneticcompatibility (EMC) -Part 4-18. Testingandmeasurementtechniques-Dampedos-
cilatorywavesimmunitytest]
3 Terms and definitions, abbreviations
3.1 Terms and Definitions
GB/T 15969.1 as defined in the following terms and definitions apply to this document.
3.1.1
Analog input analogueinput
Converted into a continuous signal for remote I/O using a discrete multi-bit binary number of remote I/O.
 
 Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30245.1-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30245.1-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30245.1-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30245.1-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries Question 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected] . In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.    |