| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 29819-2013 | English | RFQ |
ASK
|
3 days [Need to translate]
|
Models of process enterprise
| Valid |
GB/T 29819-2013
|
PDF similar to GB/T 29819-2013
Basic data | Standard ID | GB/T 29819-2013 (GB/T29819-2013) | | Description (Translated English) | Models of process enterprise | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J07 | | Classification of International Standard | 25.040.40 | | Word Count Estimation | 150,168 | | Quoted Standard | GB/T 16642-2008; GB/T 19892.1-2005; GB/T 20720.1-2006; GB/T 20720.2-2006; GB/T 20720.3-2010 | | Regulation (derived from) | National Standards Bulletin No. 22 of 2013 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the process industry enterprise manufacturing execution system (Manufacturing Execution Systcnm. MES) of the definition of the various models, modeling methods. This standard applies to the guidance of MES software product design, |
GB/T 29819-2013: Models of process enterprise---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Models of process enterprise
ICS 25.040.40
J07
National Standards of People's Republic of China
Business process modeling
Issued on. 2013-09-03
2014-03-15 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅺ
Introduction Ⅻ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Object Model 7
4.1 Object model structure 7
4.2 Resources and Views 8
4.2.1 personnel information 8
4.2.2 Device Information 12
4.2.3 Material Information 19
4.2.4 process section 27
4.3 Production capability information 33
4.3.1 Production Capacity Model 33
4.3.2 Production capacity 33
4.3.3 Human capacity 34
4.3.4 Characteristics of personnel capacity 35
4.3.5 equipment capacity 35
4.3.6 Characteristics of equipment capacity 36
4.3.7 Material capacity 37
4.3.8 Material properties of capacity 38
The ability to process 38 paragraph 4.3.9
4.3.10 type production capacity of 43
4.4 Product Definition 43
4.4.1 Product Definition Model 43
4.4.2 Product Definition 44
4.4.3 Manufacturing Listing 45
4.4.4 Products segment 45
4.4.5 Product parameters 46
4.4.6 Specification 46 persons
4.4.7 Characteristics of personnel Specification 47
4.4.8 Equipment specifications 47
4.4.9 Equipment specifications characteristics 48
4.4.10 Material Specification 48
4.4.11 Material specification properties 49
4.4.12 product segments from 49 properties
4.5 Process node information 50
4.5.1 Process Node Model 50
4.5.2 Process Definition 51
4.5.3 Process Node 51
4.5.4 Process parameters node 52
4.5.5 Attribute 53 from
4.6 Production Information 53
4.6.1 Production Information Model 53
4.6.2 Production scheduling information 53
4.6.3 Production performance information 63
71 4.7 Job Information
4.7.1 Job Information Model 71
4.7.2 job scheduling information 71
4.7.3 Job performance information 78
5 production operations model 84
The main activities 84 5.1 Production and Operations Management
5.2 Production and Operations Management Activity Model 85
85 5.3 Product Definition management
5.3.1 Activity Definition 85
5.3.2 Activity Model 86
5.3.3 Product Definition management tasks 86
5.3.4 Product Definition rule information 86
5.3.5 detailed production path 87
Resource Management 87 5.4 Production
5.4.1 Activity Definition 87
5.4.2 Activity Model 87
5.4.3 production and resource management tasks 87
88 5.4.4 Resource availability
5.4.5 Future affordable information resources collected 88
5.4.6 Resource Definition Changes collect 89
5.4.7 Human Resource Information Management 89
5.4.8 Device Resource Information Management 89
5.4.9 Materials Resource Information Management 89
89 5.5 Detailed Production Scheduling
5.5.1 Activity Definition 89
5.5.2 Activity Model 90
5.5.3 Detailed Production Scheduling tasks 90
5.5.4 finite capacity scheduling 91
Split and Merge 5.5.5 Production Schedule 91
5.5.6 detailed production schedule 92
5.5.7 detailed production schedule Example 92
Dispatched 92 5.6 Production
5.6.1 Activity Definition 92
5.6.2 Activity Model 92
5.6.3 Production 93 tasking
5.6.4 Production dispatch table 93
5.6.5 Examples of production and production work orders dispatch table 93
5.6.6 dispatched 94 work
Executive Management 95 5.7 Production
5.7.1 Activity Definition 95
5.7.2 Activity Model 95
5.7.3 production execution management task 95
5.8 Production Data Collection 96
5.8.1 Activity Definition 96
5.8.2 Activity Model 96
5.8.3 Production data collection task 96
97 5.9 Production Tracking
5.9.1 Activity Definition 97
5.9.2 Activity Model 97
5.9.3 production tracking tasks 97
Merge and Split 5.9.4 Production Information 98
5.10 98 Production Performance Analysis
5.10.1 Activity Definition 98
5.10.2 Activity Model 99
Task 5.10.3 Production Performance Analysis 99
5.10.4 Traceability Resource Analysis 100
5.10.5 Analysis Products 100
5.10.6 Process Quality Analysis 100
5.10.7 Performance Simulation 101
5.10.8 production targets and KPIs (KeyPerformanceIndications) 101
5.10.9 Performance Management 101
6 Maintenance Operations Management 102
General activities 102 6.1 Maintenance Operations Management
6.2 Maintenance Operations Management Activity Model 102
6.3 Maintenance Operations Management Information Exchange 103
6.3.1 Maintenance information 103
6.3.2 Maintenance 103 definitions
6.3.3 ability to maintain 103
6.3.4 Maintenance Request 104
6.3.5 Maintenance Response 104
6.3.6 specific equipment maintenance program 104
6.3.7 Maintenance procedures and commands 104
6.3.8 Maintenance 104 Results
6.3.9 device health data 104
Define managed 104 6.4 Maintenance
6.5 Maintenance Resource Management 105
6.6 Detailed Maintenance Scheduling 105
6.7 Maintenance dispatched 106
6.8 Maintenance Executive Management 106
6.9 Maintenance Data Collection 106
6.10 Maintenance Tracking 106
6.11 MAINTENANCE ANALYSIS 106
7 Quality Operations Management 107
The main activities 7.1 Quality Operations Management 107
7.1.1 Quality Operations Management Activities 107
7.1.2 operating mass range 108
7.1.3 Quality Test Operations Management 108
7.1.4 Test Type 109
7.1.5 Test occurrence time 109
7.1.6 Quality System 109
Activity Model 109 7.2 quality test run
7.3 Test operation and management of quality information exchange 110
7.3.1 Quality Test Definitions 110
7.3.2 quality testing capabilities 110
7.3.3 Quality test request 110
7.3.4 Quality test response 110
7.3.5 quality parameters and procedures 111
7.3.6 Test Command 111
7.3.7 Test Response 111
7.3.8 quality characteristics data 111
7.4 Quality Management Test Definitions 111
7.5 Quality Test Resource Management 112
7.6 detailed quality test schedule 112
7.7 Quality Test dispatched 113
7.8 Quality Test Execution Management 113
7.8.1 Introduction 113
7.8.2 Test 113
7.9 Quality Test Data Collection 114
7.10 Quality Test Tracking 114
7.11 Quality Performance Analysis 114
7.11.1 Introduction 114
7.11.2 Traceability Quality Resource Analysis 115
7.11.3 Quality Index 115
Support activities 115 7.12
8 116 Inventory Operations Management
8.1 Summary of inventory operations management activities 116
8.2 Inventory Operations Management Activity Model 116
Information exchange 8.3 Inventory Operation Management 117
8.3.1 Stock definitions 117
8.3.2 storage capacity 117
8.3.3 Request 117
8.3.4 Inventory Response 118
8.3.5 inventory storage definition 118
8.3.6 Inventory command 118
8.3.7 Stock replies 118
8.3.8 specific inventory data 118
8.4 Inventory management is defined 118
Inventory Explorer 8.5 118
8.6 Detailed Inventory Management 119
8.7 stock Dispatched 120
8.8 Inventory Executive Management 120
8.9 Inventory Data Collection 120
121 8.10 Inventory Tracking
8.11 Inventory Analysis 121
MES architecture Appendix A (Informative Appendix) AMR 122
MES architecture Appendix B (Informative Appendix) MESA 125
Annex C (informative) Process industry MES Solution Reference Example 128
Figure 1 Model 8 persons
Figure 2 device model 13
Figure 3 material model 19
4 Process Segment Model 27
Figure 5 Production Capacity Model 33
The ability to process the segment 6 model 39
7 current and future capacity 43
8 Product Definition Model 44
9 process node model 51
Figure 10 Scheduling Model 53
11 production performance model 63
12 Job Scheduling Model 72
13 Job Performance Model 78
14 production operations management activity model 85
15 Product Definition management activity model of the interface 86
16 production and resource management activities Model Interface 87
17 Resource Management Capacity Report 88
18 detailed production scheduling activity model of the interface 90
19 split or merge the production schedule to detailed production schedule 91
20 detailed production schedule 92
21 Dispatched production activity model of the interface 93
22 Dispatched production represents Example 94
Working 23 mixing device 94 dispatches
24 production execution management activities Model Interface 95
25 Production data collection activities model interface 96
26 production tracking activity model of the interface 97
27 production of split and merge tracking information 98
28 production activity model performance analysis interface 99
29 Maintenance Operations Management Activity Model 103
Activity Model 30 Quality Management 110 Test Run
Figure 31 Inventory Operations Management Activity Model 117
32 Model 121 Stock data collection activities
Three-layer structure model in Figure A.1 MES 122
Figure A.2 MES integrated system model 123
Figure A.3 REPAC Model 124
Figure B.1 MES external system model 125
Figure B.2 MES functional model 126
Figure C.1 MES-Suite 128 Architecture
Figure C.2 based data modeling tool 129
Figure C.3 material balance technology architecture 130
Figure C.4 run performance measures and analytical framework 131
Production quality management functional block diagram C.5 131
Figure C.6 equipment maintenance management function block diagram 133
Figure C.7 Energy Measurement and Management Functional Block 134
Figure C.8 material movement schematic 135
Figure C.9 production process scheduling function 136
Figure C.10 into the factory management system architecture diagram 137
UML notation Table 1 defines the object graph used 7
Table 2 Property class 9 persons
Table 3 Characteristics of property class staff 9
Table 4 Properties 10
Table 5 Characteristics of property 10
Table 6 qualification test specification properties 11
Attribute Table 7 qualification test specification properties 11
Table 8 qualification test results of 12 properties
Table 9 property qualification test results of 12 properties
10 device class attribute table 13
Table 11. Characteristics of the device class attribute 13
Table 12 device properties 14
Table 13 device features 14 properties
Table 14 Test specification device capability attributes 15
15 device capability attribute table test specification properties 16
Table 16 device capability attributes 16 test results
Device capability attribute table 17 test results 16 properties
Table Properties 18 17 request
Table 19 Maintenance work orders of 18 properties
Attribute Table 20 Maintenance Response 18
Property sheet material 21 defined 20
Table 22 bulk material properties 20
Property sheet material custom properties 20 23
Table Properties 24 21 Material class
Table 25 Characteristics of the material class attributes 21
Table 26 bulk material properties 22
Table 27 Characteristics of bulk material properties 22
Table 28 minute quantities of material properties 23
Table 29. Quality assurance test specification properties 23
Table 30 Material quality assurance test specification properties 24 properties
Table 31 quality assurance test results attribute 24
Table 32 Material quality assurance features 25 test results
Table 33 of 26 properties test request
Table 34 Test work order attributes 26
Table Properties 35 Test Response 26
Table 36 Properties process section 28
Property sheet section 37 process parameters 28
Table 38 staff attribute specification section 29
Table specification properties segment 39 persons 29 properties
Table Properties 2940 device segments Specification
Table Properties 3041 equipment segment specification properties
Table Properties 30 42 Material Specification section
Table 43 Material Properties segment specification properties 31
Table 44 Properties from the process section 31
Table 45 Properties of capacity 34
46 persons property sheet capacity 35
Table 47 staff capacity characteristic properties 35
Table device capability attributes 48 of 36
Table 49 Characteristics of the device capability attributes 36
Material properties Table 50 Ability 37
Property sheet material capability features 38 51
Table 52 Process capability attribute section 39
Table Properties section 53 person capacity 40
Property Characteristics Table 54 staff capacity segment 40
Table Properties 55 device segment capacity 41
Table 56 Characteristics of the device capability attribute of a section 41
Property sheet material segment capacity 42 57
Table 58 Characteristics of the ability of the material properties of segment 42
Product definition attribute table 59 44
Table Properties manufacturing materials 45 60
Attribute table 61 of manufacturing conditions 45
Table Properties 62 46 product segments
Table 63 Product Data Properties 46
Table 64 staff attribute specifications 47
Table 65 personnel specification properties 47 properties
Table 66 Device specification properties 48
Table 67 Device Specifications Characteristics of property 48
Table 68 Material specification properties 49
Table 69 Material specification properties 49 properties
Table 70 Properties of the product from paragraph 49
Process definition attribute table 71 51
Table Properties 5272 the process node
Table Properties process node characteristics 52 73
Table 74 Process attribute node parameters 52
Table 75 Production Scheduling Properties 54
Table 76 production request attributes 55
Table 77 attributes required by paragraph 55
Table Properties 78 56 production parameters
Attribute Table 79 personnel requirements 57
Table 80 Characteristics of property personnel requirements 58
Properties 58 Table 81 equipment needs
Table 82 Properties 59 properties equipment needs
Property sheet production material requirements 59 83
Table 84 Production materials properties required attributes 60
Property sheet material 85 to be consumed requirements 61
Table 86 to be consumed material properties required attributes 61
Table 87 Expected consumables property 62
Table 88 Expected consumables required characteristics of property 62
Table Properties 89 63 production performance
Table 90 properties produced 64 responses
Attribute Table 91 Response 65
Table 92 Production data attribute 66
93 real property sheet of 66 personnel
Table 94 actual property features 67 staff
The actual device attribute table 95 67
The actual device characteristics Table Properties 96 68
Table Properties actual production was 97 of 68
Property Characteristics Table 98 actual production material 69
Table Properties actual consumption of materials 69 99
Table 100 actual consumption of material properties 70 properties
Table 101 actual consumables property 71
The actual consumables table 102 properties 71 properties
Table 103 Job Scheduling Model 72
Table 104 job request attributes 73
Attribute Table 105 work orders requested 73
Property sheet 106 Worksheet Parameters 74
Table Properties 107 personnel requirements 74
Table 108 staff required characteristics of property 75
Table 76 109 properties equipment needs
GB/T 16642-2008, GB/T 19892.1-2005, GB/T 20720.1-2006, GB/T 20720.2-2006 and
GB/T 20720.3-2010 some terms and definitions.
3.1
Area (field) area
Combination of geographical or logical place determined by the physical.
Note. It may contain process segments, process units and production lines.
[GB/T 19892.1-2005, the definition 3.3]
3.2
Available capacity availablecapacity
Production capacity can be achieved partially, but not committed for the current or future production.
[GB/T 20720.1-2006, the definition 3.2]
3.3
bill
Contract or receipt of cargo goods, the carrier agrees to transport goods from one place to another, and then sent to a designated person,
Or compensation according to the contract conditions.
[GB/T 20720.1-2006, the definition 3.3]
3.4
BOM bill of material
All assemblies, components and/or production of a product list of the materials used, including the manufacture of a product required for each material
|