US$189.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29321-2012: Technical specification for reactive power compensation of PV power station Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 29321-2012 | English | 189 |
Add to Cart
|
3 days [Need to translate]
|
Technical specification for reactive power compensation of PV power station
| Valid |
GB/T 29321-2012
|
PDF similar to GB/T 29321-2012
Basic data Standard ID | GB/T 29321-2012 (GB/T29321-2012) | Description (Translated English) | Technical specification for reactive power compensation of PV power station | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F12 | Classification of International Standard | 27.160 | Word Count Estimation | 8,818 | Quoted Standard | GB/T 19964; DL/T 448 | Regulation (derived from) | National Standards Bulletin No. 41 of 2012 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the photovoltaic power station access for reactive power compensation of the technical requirements. This standard applies through 35 kV and above voltage level grid, as well as through 10 kV voltage level with the public grid conn |
GB/T 29321-2012: Technical specification for reactive power compensation of PV power station---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for reactive power compensation of PV power station
ICS 27.160
F12
National Standards of People's Republic of China
Photovoltaic power plant reactive power compensation technical specifications
Issued on. 2012-12-31
2013-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 voltage deviation 2
5 Reactive Power 2
6 Reactive Capacity 2
7 reactive power compensation device 2
8 voltage regulator 3
9 voltage and reactive power control system 4
10 4 Monitoring and evaluation
Foreword
This standard was drafted according to GB/T 1.1-2009 given rules.
This standard is proposed and managed by the China Electricity Council.
This standard was drafted. China Electric Power Research Institute, State Grid Electric Power Research Institute.
The main drafters of this standard. Liu Chun, Wang Lu water, Yongning later, Shi Wenhui, He Guoqing, Chen Mo son, Li Yan, Fengkai Hui.
Photovoltaic power plant reactive power compensation technical specifications
1 Scope
This standard specifies the access of photovoltaic power plants for reactive power compensation technical requirements.
This standard applies to 35kV and above voltage level through the grid, and connected via 10kV voltage level and a new public grid
Construction, renovation and expansion of photovoltaic power plants.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 19964 PV power plant power system access technical regulations
Technical Management Rules of DL/T 448 Energy Metering Device
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Photovoltaic power station photovoltaic (PV) powerstation
The use of photovoltaic cells photovoltaic effect, solar radiation directly into electrical energy generation system, generally comprises transformers, inverters
And a photovoltaic array, and related auxiliary facilities.
3.2
And outlets pointofinterconnection
For booster station photovoltaic power plants, booster station refers to the high side or the bus nodes; no booster station for photovoltaic power plants, photovoltaic means
Output summing point plant.
3.3
Send line transmissionline
Power stations and networks to a common connection point of the transmission line from the PV.
3.4
Photovoltaic power plant dynamic reactive response time responsetimeofPVstationdynamicreactivepower
Photovoltaic power stations and networks from abnormal voltage increase or decrease the trigger reaches the set value until photovoltaic power stations and outlets Reactive Power
The actual output rate variation (difference between the target and the initial value) time required to reach the target of 90% of the amount of change.
3.5
Photovoltaic power plant reactive power/voltage control system response time responsetimeofPVstationreactivepower/voltage
controlsystem
Photovoltaic power plant control system voltage and reactive power from the grid operator has received real-time release (or preset) reactive power/voltage control
System commands begin until photovoltaic power stations and networks reactive power actual output variation (the difference between the target value and the initial value) to reach the target amount of change
The time required for 90% of the value.
3.6
Voltage qualification rate voltageeligibilityrate
Actual operating voltage within the allowable voltage deviation accumulated operation percentile ratio corresponding to the total time and run time statistics.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29321-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 29321-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 29321-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29321-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|