HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 28057-2011 English PDF

US$439.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 28057-2011: Specification for oxygen converter heat recovery boiler
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 28057-2011English439 Add to Cart 4 days [Need to translate] Specification for oxygen converter heat recovery boiler Valid GB/T 28057-2011

PDF similar to GB/T 28057-2011


Standard similar to GB/T 28057-2011

GB/T 24747   GB/T 16508.8   GB/T 22395   GB/T 45542   GB/T 10184   GB/T 28056   

Basic data

Standard ID GB/T 28057-2011 (GB/T28057-2011)
Description (Translated English) Specification for oxygen converter heat recovery boiler
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J98
Classification of International Standard 27.060.30
Word Count Estimation 19,130
Date of Issue 2011-12-30
Date of Implementation 2012-07-01
Quoted Standard GB/T 1576; GB/T 28056; GB 50273; DL/T 5047; JB/T 1610; JB/T 1611; JB/T 1612; JB/T 1613; JB/T 1615; JB/T 3375; JB/T 4730; JB/T 5255
Regulation (derived from) Announcement of Newly Approved National Standards No. 23 of 2011
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the basic oxygen furnace waste heat boiler general requirements, technical requirements, manufacturing, paints, packaging and marking, installation and responsibility for the quality and other requirements. This standard applies to water as the working fluid is rated not greater than 5. 0MPa outlet steam pressure of oxygen converter waste heat boiler.

GB/T 28057-2011: Specification for oxygen converter heat recovery boiler

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specfication for oxygen coverter heat recovery boiler ICS 27.060.30 J98 National Standards of People's Republic of China BOF HRSG conditions Issued on. 2011-12-30 2012-07-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 3 4 General provisions 5 Technical requirements 3 6 paints, packaging and identification 5 7 installation requirements 6 8 6 Quality Responsibility (Normative) Appendix A flue manufactured parts 7 Appendix B (normative) Installation 14

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points. This standard is drafted by. Hangzhou Boiler Group Co., Ltd. Participated in the drafting of this standard. Anshan Boiler Factory Co., Ltd., Nantong Wanda Boiler Co., Ltd., Shanghai Power Equipment Research Institute, Anyang Iron and Steel Group Co., Ltd. The main drafters of this standard. solid industry Qin, Ji Dong, Tian Tachikue to Ze Jun, Chen Jun, Chen Xiubin, Yuan Zhenfeng. BOF HRSG conditions

1 Scope

This standard specifies the general provisions oxygen converter waste heat boiler, technical requirements, manufacturing, paints, packaging and identification, installation and quality responsibility And other requirements. This standard applies to water as the working fluid outlet rated steam pressure not more than 5.0MPa oxygen converter waste heat boiler.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 1576 industrial boiler water quality GB/T 28056 flue waste heat boiler General technical requirements GB 50273 industrial boiler installation engineering construction and acceptance DL/T 5047 Power Construction and Acceptance of boiler set JB/T 1610 boiler header manufacturing technology conditions JB/T 1611 boiler pipe manufacturing technology conditions JB/T 1612 boiler hydrostatic test technical conditions JB/T 1613 boiler pressure parts for welding JB/T 1615 boiler paint condition and packaging technology JB/T 3375 boiler materials into the factory acceptance rules JB/T 4730 Pressure Equipment NDT JB/T 5255 welded finned tube (screen) technical conditions

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Oxygen converter waste heat boiler oxygenconverterheatrecoveryboiler In oxygen steelmaking converter furnace gas emissions sensible heat (including a small amount of heat generated by burning combustible gases) as a heat source flue remainder wok Furnace, which is mainly composed of activities hoods, furnace mouth section hood, flue, drum, cutting masks, oxygen masks gun, vice lance masks, led tube, down tube portion Member (see Figure 1). 3.2 Activities hood (skirt) skirt By an annular or straight-set box set box and pipe composition, lift sealing a tubular member with a pressurized furnace gas, converter gas is discharged through the inlet Road, a small portion of the combustible gas combustion in the hood. HOOD steelmaking process with operational requirements do up and down or panning, called active hood. 3.3 Mouth segment hood inletcoolerhood By the annular header tube or pipe bulkhead structure and composition, and the tubular member with a pressurized furnace gas sealing, it is the furnace gas inlet passage. Refine

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 28057-2011_English be delivered?

Answer: Upon your order, we will start to translate GB/T 28057-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 28057-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 28057-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.