US$399.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 25926-2010: Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 25926-2010 | English | 399 |
Add to Cart
|
3 days [Need to translate]
|
Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams
| Valid |
GB/T 25926-2010
|
PDF similar to GB/T 25926-2010
Basic data Standard ID | GB/T 25926-2010 (GB/T25926-2010) | Description (Translated English) | Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N10 | Classification of International Standard | 25.040.40 | Word Count Estimation | 17,116 | Date of Issue | 1/14/2011 | Date of Implementation | 5/1/2011 | Quoted Standard | GB/T 2625-1981; GB/T 4728.1; GB/T 4728.2; GB/T 4728.3; GB/T 4728.4; GB/T 4728.5; GB/T 4728.6; GB/T 4728.7; GB/T 4728.8; GB/T 4728.9; GB/T 4728.10; GB/T 4728.11; GB/T 4728.12; GB/T 4728.13; GB 4884; GB/T 25927-2010 | Regulation (derived from) | Announcement of Newly Approved National Standards No. 2 of 2011 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This Standard specifies the industrial process mounted on the dashboard of measuring and control instruments, electrical components and instrumentation accessories (abbreviated project) wiring diagram representation takeover, drawing rules and mapping methods. This Standard is applicable to industrial automation and dashboard wiring diagram plotted to take over. Wiring diagram plotted to take over the console (cabinet) can also refer to adoption. |
GB/T 25926-2010: Industrial-process measurement and control instrument panels -- Methods of drawing the wiring and piping diagrams ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Industrial-process measurement and control instrument panels. Methods of drawing the wiring and piping diagrams
ICS 25.040.40
N10
National Standards of People's Republic of China
Industrial automation dashboard wiring diagram takeover
Drawing method
Issued on. 2011-01-14
2011-05-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
The standard proposed by China Machinery Industry Federation.
This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized.
This standard is drafted by. Shanghai Institute of Industrial Automation Instrumentation.
Participated in the drafting of this standard. Shanghai Automation Instrumentation System Inspection and Testing Institute.
The main drafters of this standard. Li Minghua, Cai Zhi Wen, Xiao practice.
This standard is the first release.
Industrial automation dashboard wiring diagram takeover
Rendering
1 Scope
This standard specifies the industrial process is mounted on the dashboard of measurement and control instruments, electrical components and instrumentation attachments (referred to item) wiring,
Representation takeover graph, drawing rules and graphical method.
This standard applies to industrial automation instrument panel wiring diagram plotted to take over.
Wiring diagram plotted to take over the control panel (cabinet) can also refer to adopt.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 2625-1981 detection and control process flow chart - Symbols and letter codes
GB/T 4728 (all parts), Graphical symbols for electrical diagrams (IEC 60617database, IDT)
GB 4884 insulated wire markers (GB 4884-1985, eqv IEC 60391. 1972)
Drawing method GB/T 25927-2010 Industrial automation dashboard layout of the disk
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
Project item
For components, equipment, devices, and other elements on the diagram with a graphical notation.
3.2
Project Code itemcode
A special code for logos, charts and project on the device.
3.3
Location code positioncode
Project components, devices, systems of the actual position of the code.
3.4
Terminal designation terminalcode
Used with an external circuit electrically connected to the conductor code.
3.5
Wear fittings Code conduitjointcode
Used with external piping in piping connected to the pipe joint code.
4 Representation
4.1 Wiring, flattened face takeover
Wiring, flattened face takeover is in accordance with the structural features of the instrument panel and wiring, take over the process adopted to the dashboard viewing direction, take the main
|