US$299.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 23505-2017: Petroleum and natural gas industries -- Petroleum drilling and workover rigs Status: Valid GB/T 23505: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 23505-2017 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
Petroleum and natural gas industries -- Petroleum drilling and workover rigs
| Valid |
GB/T 23505-2017
|
GB/T 23505-2009 | English | 639 |
Add to Cart
|
3 days [Need to translate]
|
Petroleum drilling and workover rigs
| Obsolete |
GB/T 23505-2009
|
PDF similar to GB/T 23505-2017
Basic data Standard ID | GB/T 23505-2017 (GB/T23505-2017) | Description (Translated English) | Petroleum and natural gas industries -- Petroleum drilling and workover rigs | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | E92 | Classification of International Standard | 75.180.10 | Word Count Estimation | 15,114 | Date of Issue | 2017-02-28 | Date of Implementation | 2017-09-01 | Older Standard (superseded by this standard) | GB/T 23505-2009 | Quoted Standard | GB 146.1; GB 2894; GB/T 3766; GB 3836.1; GB 3836.2; GB 3836.3; GB 3836.5; GB 3836.8; GB 3836.15; GB 4208; GB/T 7932; GB/T 7935; GB/T 8423; GB/T 17744; GB/T 19190; GB/T 20174; GB/T 23507.3; GB/T 25428; GB/T 30216-2013; GB/T 31049; GB/T 32338; SY/T 5027; SY | Regulation (derived from) | National Standard Announcement No. 4 of 2017 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the terms and definitions of oil and gas rigs and workover rigs, product type, model, basic parameters, configuration requirements, technical requirements, test and documentation, marking, factory documentation, storage, packaging and transportation. This standard applies to oil and gas drilling and workover rigs and workover rigs. Offshore platforms with rigs and workover rigs can be consulted. |
GB/T 23505-2017: Petroleum and natural gas industries -- Petroleum drilling and workover rigs---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum and natural gas industries - Petroleum drilling and workover rigs
ICS 75.180.10
E92
National Standards of People's Republic of China
Replacing GB/T 23505-2009
Oil and gas industry
Rigs and workover rigs
2017-02-28 released
2017-09-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People 's Republic of China
China National Standardization Management Committee released
Directory
Preface III
1 Scope 1
2 normative reference document 1
3 terms, definitions and abbreviations 2
4 type and model representation method 3
5 basic parameters 5
6 configuration requirements 8
Technical requirements 9
8 Test and record 11
9 logo, factory documents, storage, packaging and transportation 12
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T 23505-2009 "oil rigs and workover rigs". Compared with GB/T 23505-2009, the main technology changes
As follows.
--- Standard name changed to "oil and gas industry drilling rig and workover rig";
- Added or removed some normative references (see Chapter 2);
- to modify all the terms and definitions in the original standard, and to remove the terms "design safety factor", the addition of "drilling mechanization equipment"
(See 3.1);
--- Change the type of chassis in the representation of the workover model to the type of movement (see 4.2.2);
- Table 1 adds the ZJ80/5850 level rig (see Table 1);
--- Table 2 in the hook level 1800,2250 increase in 39m, 41m two derrick height (see Table 2);
--- increased the type of power system configuration, increased the configuration of drilling mechanized equipment (see Chapter 6);
- adjust the order of description of 6.2 (see 6.2);
--- Removed the requirements for safe escape chute and ground angle, the requirements for guard railings, the number of safety protection chains and the requirements
Installation of TV room monitoring system for motor room (see Chapter 6);
- Describe the technical requirements sub-system and consolidate the original terms (see Chapter 7);
- Electricity of rig electrical equipment increases by 600V/400V, 50Hz specification (see 7.2);
- only the module rig derives the ladder leading to the trolley and the second floor to all derricks (see 7.3);
- Increased requirements for self-propelled rigs and workover vehicles (see 7.9);
--- Increased installation of oil, water, electricity and heating systems for drilling wells (see 7.10);
- change the specific requirements for the coating in the standard to SY/T 6919 (see 7.1);
- Increased test requirements for self-propelled rigs and workover rigs (see 8.1, 8.2);
- Change the requirements for the winch type test to SY/T 5532 (see 8.2);
- Increased requirements for drilling pump type tests, turntable and top drive drilling unit type inspection requirements (see 8.2).
This standard is proposed by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96).
The drafting of this standard unit. Baoji Petroleum Machinery Co., Ltd., Nanyang two oil equipment (Group) Co., Ltd., Sinopec oil
Machinery Co., Ltd. Fourth Machinery Plant, Daqing Drilling Engineering Company, Sichuan Honghua Petroleum Equipment Co., Ltd., Lanzhou Lan Shi Group Co., Ltd.
Oilfield plateau oil equipment limited liability company, Shandong Kerui Petroleum Equipment Co., Ltd.
The main drafters of this standard. Huang Yuehua, Zhao Peng, Yan Xiaoni, Sun Juan, Ma Jinsheng, Liu Hui, Xu Jun, Wang Tao, Deng, Dong Hui, Wang Lianzhong,
Yang Yusheng.
This standard replaced the previous version of the standard release.
--- GB/T 23505-2009.
Oil and gas industry
Rigs and workover rigs
1 Scope
This standard specifies the terms and definitions of oil and gas rigs and workover rigs, product type, model, basic parameters, configuration requirements, technical
Technical requirements, testing and recording, marking, factory documentation, storage, packaging and transportation.
This standard applies to oil and gas drilling and workover rigs and workover rigs.
Offshore platforms with rigs and workover rigs can be consulted.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB 146.1 Standard Gauge Rail Locomotive Vehicle Boundary
GB 2894 Safety signs and guidelines for their use
GB/T 3766 General technical requirements for hydraulic systems
GB 3836.1 Explosive atmospheres - Part 1. General requirements for equipment
GB 3836.2 Explosive atmospheres - Part 2. Equipment protected by flameproof enclosure "d"
GB 3836.3 Explosive atmospheres - Part 3. Equipment protected by increased safety type "e"
GB 3836.5 Electrical equipment for explosive gas atmospheres - Part 5. Positive pressure shell type "p"
GB 3836.8 Explosive atmospheres - Part 8. Equipment protected by "n" type
GB 3836.15 Electrical equipment for explosive gas atmospheres - Part 15. Electrical installations in hazardous locations (except coal mines)
GB 4208 enclosure protection class (IP code)
GB/T 7932 General technical requirements for pneumatic systems
GB/T 7935 General specification for hydraulic components
Glossary of Industrial Equipment and Materials for Petroleum and Natural Gas
Oil and gas industry drilling and workover equipment GB/T
Oil and gas industry drilling and oil recovery equipment GB/T
Oil and gas industry drilling and oil extraction equipment drilling equipment GB/T
GB/T 23507.3 Specification for electrical equipment for oil rigs - Part 3. Diesel generator sets for electric drilling rigs
Petroleum and natural gas industries Drilling and oil recovery equipment Drilling and workover derrick, base
GB/T 30216-2013 vehicle mounted rig
Drilling device for top drilling of oil rigs GB/T
Oil and Gas Industry Drilling and Workover Equipment Drilling Pumps GB/T
SY/T 5027 Pneumatic components for oil drilling equipment
SY/T 5030 Oil and Gas Industry Diesel Engine
Specification for control systems for drilling wellhead control equipment and shunt equipment
SY/T 5074 Drilling and workover power tongs, hanging clamps
SY/T 5080 turntable for oil rig and workover rig
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 23505-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 23505-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 23505-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 23505-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 23505-2017?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 23505-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|