US$359.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 23506-2025: The gas-fuel power set for oil pruduction drilling site Status: Valid GB/T 23506: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 23506-2025 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
The gas-fuel power set for oil pruduction drilling site
| Valid |
GB/T 23506-2025
|
GB/T 23506-2017 | English | 339 |
Add to Cart
|
4 days [Need to translate]
|
The gas-fuel power set for oil production drilling site
| Valid |
GB/T 23506-2017
|
GB/T 23506-2009 | English | 799 |
Add to Cart
|
4 days [Need to translate]
|
The natural gas power set for oil production drilling site
| Obsolete |
GB/T 23506-2009
|
PDF similar to GB/T 23506-2025
Basic data Standard ID | GB/T 23506-2025 (GB/T23506-2025) | Description (Translated English) | The gas-fuel power set for oil pruduction drilling site | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | E92 | Classification of International Standard | 75.180.10 | Word Count Estimation | 18,150 | Date of Issue | 2025-03-28 | Date of Implementation | 10/1/2025 | Older Standard (superseded by this standard) | GB/T 23506-2017 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 23506-2025: The gas-fuel power set for oil pruduction drilling site---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 75.180.10
CCSE92
National Standard of the People's Republic of China
Replaces GB/T 23506-2017
Gas power unit for oil well production site
Released on 2025-03-28
2025-10-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Model indication method 2
5 Requirement 2
5.1 General 2
5.2 Standard reference condition 3
5.3 Rated power of unit 4
5.4 Startup Performance 4
5.5 No-load running performance 4
5.6 Clutch function 4
5.7 Output direction switching function 4
5.8 Transmission ratio conversion requirements 4
5.9 Control system functions 4
5.10 Main performance indicators 5
5.11 Load characteristics 5
5.12 Speed regulation performance of the unit to adapt to alternating loads 5
5.13 Sealing 5
5.14 Mechanical structure of the unit 5
5.15 Completeness 6
6 Experiment 6
6.1 Test conditions and requirements 6
6.2 Test methods 6
7 Inspection Rules 9
7.1 Inspection items and measurement parameters 9
7.2 Factory Inspection 11
7.3 Type inspection 11
8 Marking, packaging, transportation and storage 11
8.1 Sign 11
8.2 Packaging, transportation and storage 11
Appendix A (Informative) Information provided by the unit user 13
A.1 Unit installation site conditions 13
A.2 Operating conditions 13
A.3 Gas source conditions 13
A.4 Description of the driven machinery 13
A.5 Other relevant information 13
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document replaces GB/T 23506-2017 "Gas Power Units for Oil Production Wells".
In addition to structural adjustments and editorial changes, the main technical changes are as follows.
--- Changed the representation method of unit model (see Chapter 4, Chapter 4 of the.2017 edition);
--- Deleted the "vibration" requirements for the "normal operating conditions" of the unit [see 5.1.1.2c) of the.2017 edition];
--- Changed the basic requirements for explosion-proof systems of units (see 5.1.1.7, 5.1.1.7 of the.2017 edition);
--- Changed the basic requirements for vehicle-mounted installation of the unit (see 5.1.1.8, 5.1.1.8 of the.2017 edition);
--- Added basic requirements for unit safety and fire protection (see 5.1.1.10 and 5.1.1.11);
--- Added gas supply requirements for "associated gas, casing gas and coalbed methane" (see 5.1.2.2);
--- Changed the fuel requirements (see 5.1.3, 5.1.3 of the.2017 edition);
--- Increased engine oil requirements (see 5.1.4);
--- Added the requirement for rapid cut-off of the control system gas source [see 5.9.1d)];
--- Changed the noise limit requirements (see Table 1, 5.10.1 of the.2017 edition);
--- Deleted the replacement rate requirements for diesel/natural gas dual-fuel generator sets (see 5.10.2 of the.2017 edition);
--- Changed the unit heat rate requirements (see Table 1, 5.10.3 of the.2017 edition);
--- Changed the pollutant emission limit requirements (see Table 1, 5.10.4 of the.2017 edition);
--- Changed the rated slip requirements of the unit (see Table 1, 5.10.5 of the.2017 edition);
--- Deleted the requirements for unit safety and fire protection (see 5.14 and 5.15 of the.2017 edition);
--- Changed the safety protection requirements for components with projectile hazards (5.14.2.2, see 5.16.2.2 of the.2017 edition);
--- Changed the protection requirements and identification requirements for parts that may cause danger (see 5.14.2.3, 5.16.2.3 of the.2017 edition and
5.16.2.4);
--- Changed the requirements for test oil (see 6.1.4, 6.1.4 of the.2017 edition);
--- Added test requirements for oil heating devices (see 6.2.10.3);
--- Added unit thermal balance test requirements (see 6.2.18);
--- Deleted the safety inspection and fire inspection requirements (see 6.3.18 and 6.3.19 of the.2017 edition).
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed and coordinated by the National Technical Committee for Standardization of Petroleum Drilling Equipment and Tools (SAC/TC96).
This document was drafted by. China National Petroleum Corporation Jichai Power Co., Ltd., China National Petroleum Corporation Sichuan Qing Drilling Engineering Co., Ltd. Changqing Drilling
Headquarters, CNPC Bohai Oil Equipment Manufacturing Co., Ltd., Baoji Petroleum Machinery Co., Ltd., China Petroleum Materials Co., Ltd.
company.
The main drafters of this document are. Guo Jinju, Zhang Junmei, Yang Jiacheng, Wang Bifeng, Sun Chenglei, Bai Ying, Chen Xiaoyong, Dang Yonghao, Qu Yongzhe, Cao Xiaoyu,
Yang Sai.
This document was first published in.2009, revised for the first time in.2017, and this is the second revision.
Gas power unit for oil well production site
1 Scope
This document specifies the model representation method, requirements, tests, inspection rules, marking, packaging, transportation, etc. of gas power units in oil production wells.
and storage.
This document applies to the design, manufacture, inspection and acceptance of gas power units (hereinafter referred to as "units") at oil well sites.
The gas-powered units of other equipment and the power units driven by other fuel engines shall be implemented accordingly.
Note. The unit is mainly used to drive onshore oil field equipment such as oil pumping units, crude oil transfer pumps, compressors, and operating lifting machinery (such as workover machines).
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 191 Pictorial markings for packaging, storage and transportation
GB 1589 External dimensions, axle loads and mass limits for vehicles, trailers and vehicle trains
GB/T 4556 Fire protection for reciprocating internal combustion engines
GB/T 6072.1 Performance of reciprocating internal combustion engines Part 1.Calibration and test methods for power, fuel consumption and oil consumption
Additional requirements for general purpose engines
GB/T 6072.3 Reciprocating internal combustion engine performance Part 3.Test measurement
GB/T 6072.5 Performance of reciprocating internal combustion engines Part 5.Torsional vibration
GB/T 6388 Shipping and receiving marks for transport packaging
GB/T 7184 Vibration assessment method for reciprocating internal combustion engines
GB 11122 Diesel Engine Oil
GB/T 14097 Noise limits for reciprocating internal combustion engines
GB/T 14363 Diesel engine oil consumption determination method
GB/T 16471 Size and mass limits for transport packages
GB 19147 Diesel for vehicles
GB/T 20136-2006 General test methods for internal combustion engine power plants
GB/T 20651.2 Safety of reciprocating internal combustion engines Part 2.Spark ignition engines
GB 20891 Emission limits and measurement methods for exhaust pollutants from diesel engines for non-road mobile machinery (China Phase III and IV)
GB/T 21404 General requirements for determination and measurement of internal combustion engine power
GB/T 23821 Mechanical safety Safety distance to prevent upper and lower limbs from touching dangerous areas
NB/T 10301 Thermal balance test method for reciprocating internal combustion gas generator sets
3 Terms and definitions
The following terms and definitions apply to this document.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 23506-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 23506-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 23506-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 23506-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 23506-2025?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 23506-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|