HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 22490-2008 English PDF

US$719.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 22490-2008: Acceptance technical code for soil and water conservation engineering of development and construction projects
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 22490-2008English719 Add to Cart 6 days [Need to translate] Acceptance technical code for soil and water conservation engineering of development and construction projects Valid GB/T 22490-2008

PDF similar to GB/T 22490-2008


Standard similar to GB/T 22490-2008

NY/T 1121.10   GB 20287   NY/T 1121.11   GB/T 37067   GB/T 15773   GB/T 15772   

Basic data

Standard ID GB/T 22490-2008 (GB/T22490-2008)
Description (Translated English) Acceptance technical code for soil and water conservation engineering of development and construction projects
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard B11
Classification of International Standard 13.080
Word Count Estimation 31,322
Date of Issue 2008-11-14
Date of Implementation 2009-02-01
Quoted Standard GB/T 20465; GB 50433; GB 50434; SL 336
Regulation (derived from) National Standard Approval Announcement 2008 No.18 (Total No.131)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the facilities of construction project acceptance acceptance acceptance of the conditions and a variety of categories, organization, contents, procedures, acceptance criteria and results requirements. This standard applies to levy covers in 1h m above or involves displacement of soil and water conservation facilities in the acceptance of the total 10, 000 m3 of earth over building projects.

GB/T 22490-2008: Acceptance technical code for soil and water conservation engineering of development and construction projects


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Acceptance technical code for soil and water conservation engineering of development and construction projects ICS 13.080 B11 National Standards of People's Republic of China Soil and Water Conservation Development Projects Technical specification for acceptance facility Posted 2008-11-14 2009-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Basic requirements 2 5 self-examination and early test 2 5.1 General provisions 2 5.2 First subpart self test 2 5.3 unit project early self test 2 6 Technology Assessment 3 6.1 General provisions 3 6.2 evaluate the content and procedures 3 6.3 Assessment Verification 4 6.4 point type projects evaluation 4 6.5 linear projects evaluation 5 6.6 mixed-type project evaluation 5 6.7 Evaluation criteria and results requirements 5 7 5 administrative acceptance 7.1 General Provisions 5 7.2 Tasks and procedures 6 Appendix A (informative) Acceptance of conservation facilities should provide information directory 8 Annex B (informative) information for future reference conservation facilities should be ready acceptance directory 9 Annex C (informative) part project acceptance of visa format 10 Annex D (informative) unit project acceptance identification letter format 13 Content Appendix E (normative) administrative inspection reports outline major 16 Annex F (informative) Soil and Water Conservation Facilities 22 administrative approval opinion main content Annex G (informative) conservation facilities acceptance identification letter format 24

Foreword

The Standard Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F and Appendix G are informative appendices. The proposed standard by the People's Republic of China Ministry of Water Resources and centralized. This standard is mainly drafted by. Soil and Water Conservation Monitoring Center. It participated in the drafting of this standard. upper and middle reaches of the Yellow River Conservancy Commission Authority. The main drafters of this standard. Soil and Zhao Yongjun, Chen Ping, Shen Xue Jian, Gao Xu Biao, by Rui, Zhang Zhang, Yuan Putin, Zhao Guangyao, Wangkun Ping, Zhang Yulong, such as That somebody, paragraph Ju Qing, Bai Zhigang, Chen Jihu. Soil and Water Conservation Development Projects Technical specification for acceptance facility

1 Scope

This standard specifies the development and construction projects (hereinafter referred to as "Project") acceptance of acceptance of soil and water conservation facilities and a variety of classification and acceptance Conditions, organization, content, procedures, acceptance criteria and results requirements. This standard applies to levy covers an area of \u200b\u200bcut and fill earthwork in 1hm2 or more in the total amount of more than 10,000 m3 of soil and water conservation projects Facility inspection.

2 Normative references

The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 20465 Water Conservation term GB 50433 technical specification of construction project GB 50434 Water Loss Prevention Standards Development Projects SL336 Soil and Water Conservation Engineering Quality Assessment procedure

3 Terms and Definitions

GB/T 20465 and established the following terms and definitions apply to this standard. 3.1 Acceptance of conservation facilities construction unit or its delegate supervision units in the process of building conservation facilities organizations, including Subpart preliminary acceptance of self-examination and self-examination of the preliminary acceptance unit project is the basis for the administrative acceptance. 3.2 Acceptance by the soil and water conservation and soil conservation facilities program approval authorities in the conservation facilities built auspices, is the main project acceptance Before the special inspection (including the stage of acceptance). 3.3 Soil and water conservation facilities acceptance technology assessment agency commissioned the construction unit of the number of construction projects in soil and water conservation facilities, quality, schedule A comprehensive assessment of water and soil conservation effects carried out. 3.4 On the surrounding soil erosion may have a significant impact on larger units or investment projects, including an area of \u200b\u200bnot less than 5hm2 levy or earthwork Medium-sized spoil of not less than 5 × 104m3 (slag) field or borrow pits protection facilities; project investment of not less than $ 10,000 through (across) the project Spoil small field surrounded by settlements, or school levy and covering not less than 1hm2 or dregs of not less than (5 × 103m3); and Linhe buildings Protection facilities; and above covering 1hm2 landscaping works.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 22490-2008_English be delivered?

Answer: Upon your order, we will start to translate GB/T 22490-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 22490-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 22490-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.