|
US$279.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 21369-2024: Specification for equipping and managing of measuring instrument of energy in fossil power plants Status: Valid GB/T 21369: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 21369-2024 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Specification for equipping and managing of measuring instrument of energy in fossil power plants
| Valid |
GB/T 21369-2024
|
| GB/T 21369-2008 | English | 189 |
Add to Cart
|
3 days [Need to translate]
|
Specification for equipping and managing of measuring instrument of energy in fossil power plants
| Valid |
GB/T 21369-2008
|
PDF similar to GB/T 21369-2024
Basic data | Standard ID | GB/T 21369-2024 (GB/T21369-2024) | | Description (Translated English) | Specification for equipping and managing of measuring instrument of energy in fossil power plants | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 14,116 | | Date of Issue | 2024-11-28 | | Date of Implementation | 2025-06-01 | | Older Standard (superseded by this standard) | GB/T 21369-2008 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 21369-2024: Specification for equipping and managing of measuring instrument of energy in fossil power plants ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27.010
CCSF01
National Standard of the People's Republic of China
Replace GB/T 21369-2008
Energy metering equipment and equipment for thermal power generation enterprises
Management Requirements
Released on 2024-11-28
2025-06-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document replaces GB/T 21369-2008 "Energy Metering Equipment and Management Requirements for Thermal Power Generation Enterprises" and is compatible with GB/T 21369-
Compared with.2008, in addition to structural adjustments and editorial changes, the main technical changes are as follows.
a) The scope has been changed (see Chapter 1, Chapter 1 of the.2008 edition);
b) The definition of the term "secondary energy-consuming unit of thermal power generation" has been changed (see 3.2, 3.2 of the.2008 edition);
c) Added the term “energy-carrying medium” and its definition (see 3.3);
d) The types and scope of energy measurement have been changed (see Chapter 4, 4.1 and 4.2 of the.2008 edition)
e) The principles for the allocation of energy metering instruments have been changed (see 5.1, 4.3 of the.2008 edition);
f) The requirements for the allocation rate of energy metering instruments have been changed (see 5.2.4, 4.4.5 of the.2008 edition);
g) The accuracy level requirements for energy metering instruments have been changed (see 5.2.5, 4.4.6 of the.2008 edition);
h) The management requirements for energy metering personnel and metering instruments have been changed (see 6.2 and 6.3, 5.2 and 5.3 of the.2008 edition).
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed and coordinated by the National Technical Committee for Standardization of Energy Fundamentals and Management (SAC/TC20).
This document was drafted by. China Electricity Council, China Southern Power Grid Electric Power Technology Co., Ltd., Datang International Power Generation Co., Ltd.
Company, China Huaneng Group Co., Ltd., National Energy Conservation Center, State Energy Investment Group Co., Ltd., Huaneng Weihai Power Generation Co., Ltd.
Company, Guoneng Longyuan Blue Sky Energy Saving Technology Co., Ltd., China Datang Group Science and Technology Research Institute Co., Ltd. North China Electric Power Experimental Research
Institute, Datang Foshan Thermal Power Co., Ltd., Guoneng Zhejiang Beilun No. 1 Power Generation Co., Ltd., Hebei Datang International Wangtan Power Generation Co., Ltd.
Company, Sujin Tashan Power Generation Co., Ltd., China Electricity Council Power Construction Technology and Economic Consulting Center, Huaneng Heilongjiang Power Generation Co., Ltd.
Co., Ltd., Fuzhou Branch of Huaneng (Fujian) Energy Development Co., Ltd.
The main drafters of this document are. Liu Zhiqiang, Shen Yueliang, Wu Jianguo, Gao Changzheng, Li Qing, Zhang Guoming, Zhao Hujun, Zhang Qiang, Yang Yongbo, Yu Xinbo,
Qu Zengjie, Sun Jianfeng, Zhao Wenbo, Yan Jinguang, Li Xiaolin, Han Chao, Fan Rui, Li Dongwei, Yang Tao, Chen Jie, Li Yujun, Li Yuning, Wang Yanzhao,
Zhao Mingrui, Yuan Bin, Yang Leijuan, Zhang Lei, Ren Hanyue.
This document was first published in.2008 and this is the first revision.
Energy metering equipment and equipment for thermal power generation enterprises
Management Requirements
1 Scope
This document specifies the requirements for the deployment and management of energy metering instruments in thermal power generation enterprises.
This document is applicable to thermal power generation enterprises that use coal, oil, gas, biomass, garbage as fuel, or a mixture of multiple fuels.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 2589 General rules for comprehensive energy consumption calculation
GB/T 15316 General technical rules for energy conservation monitoring
GB 17167 General rules for the allocation and management of energy metering instruments in energy-consuming units
GB/T 18603 Technical requirements for natural gas metering systems
GB/T 27025 General requirements for the competence of testing and calibration laboratories
GB/T 43866 Inspection method for the allocation rate of energy metering equipment in enterprises
DL/T 1189 Guidelines for Energy Audit of Thermal Power Plants
DL/T 2385 Technical Guidelines for the Installation and Management of Water Metering Instruments in Thermal Power Plants
JJF1356 Energy measurement review specification for key energy-consuming units
3 Terms and definitions
The terms and definitions defined in GB/T 2589 and GB 17167 and the following apply to this document.
3.1
A thermal power generation enterprise with independent legal status or independent accounting capabilities.
3.2
Energy accounting units under thermal power generation enterprises.
Note. Secondary energy-consuming units of thermal power generation include main production systems, auxiliary production systems and ancillary production systems.
3.3
Energy-carrying medium
A medium that can absorb or release energy due to changes in its own state and parameters. The medium consumed in the production process is not considered
The raw materials are not used and do not enter the products, but energy is directly consumed during production or preparation.
[Source. GB/T 2589-2020, 3.1, modified]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 21369-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 21369-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 21369-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 21369-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 21369-2024?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 21369-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|