US$194.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18216.10-2022: Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 18216.10-2022 | English | 194 |
Add to Cart
|
3 days [Need to translate]
|
Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures
| Valid |
GB/T 18216.10-2022
|
PDF similar to GB/T 18216.10-2022
Basic data Standard ID | GB/T 18216.10-2022 (GB/T18216.10-2022) | Description (Translated English) | Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measur | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N20 | Word Count Estimation | 10,148 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 18216.10-2022: Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrical safety in low voltage distribution systems up to 1000V acand 1500V dc- Equipment for testing, measuring or monitoring of protective measures - Part 10.Combined measuring equipment for testing, measuring or monitoring of protective meas
ICS 17.220.20
CCSN20
National Standards of People's Republic of China
AC 1000V and DC 1500V and below low voltage
Test of electrical safety protection measures for power distribution system,
Measuring or monitoring equipment - Part 10.For protection
Combined measuring equipment for testing, measuring or monitoring measures
(IEC 61557-10.2013, IDT)
2022-10-12 Released 2023-05-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Requirements 2
4.1 General Requirements 2
4.2 Signs and graphic symbols3
5 Logos and Instructions for Use 3
6 Experiment 4
Reference 5
Figure 1 Example 3 of a graphic symbol for an AC 500V system
Table 1 External overvoltage withstand capability3
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
This document is GB/T 18216 "AC 1000V and DC 1500V and below low-voltage power distribution system electrical safety protection measures.
Test, Measuring or Monitoring Equipment, Part 10.GB/T 18216 has published the following parts.
--- Part 1.General requirements;
--- Part 2.Insulation resistance;
--- Part 3.Loop impedance;
--- Part 4.Grounding resistance and equipotential grounding resistance;
--- Part 5.Resistance to ground;
--- Part 6.Effectiveness of residual current devices (RCDs) in TT, TN and IT systems;
--- Part 8.Insulation monitoring devices in IT systems;
--- Part 9.Equipment for locating insulation faults in IT systems;
--- Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures;
--- Part 12.Performance measurement and monitoring device (PMD).
This document is identical to IEC 61557-10.2013 "Electrical safety of low-voltage power distribution systems of AC 1000V and DC 1500V and below"
Testing, measuring or monitoring equipment for total protective measures - Part 10.Combined measuring equipment for testing, measuring or monitoring of protective measures
Prepare".
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed by China Machinery Industry Federation.
This document is under the jurisdiction of the National Standardization Technical Committee of Electrical Instrumentation (SAC/TC104).
This document is drafted by. State Grid Zhejiang Electric Power Co., Ltd. Jiaxing Power Supply Company, Northeast Electric Power University, State Grid Xiong'an Integrated Energy Service
Co., Ltd., Harbin Electrical Instrument Research Institute Co., Ltd., Xiamen Yesheng Electric Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd.
Company, Shenzhen Xinglong Technology Co., Ltd., Heilongjiang Provincial Electrical Instrumentation Engineering Technology Research Center Co., Ltd., Zhejiang UBS Electronics
Co., Ltd., Yunnan Power Grid Co., Ltd., Guangdong Power Grid Co., Ltd. Measurement Center, Hebei Xiong’an Xujidian Technology Integrated Energy Technology
Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Marketing Service Center, Huali Technology Co., Ltd., State Grid Sichuan Electric Power Company, State Grid
Shandong Electric Power Company Marketing Service Center (Measuring Center), State Grid Jibei Electric Power Co., Ltd. Measuring Center, Guangxi Power Grid Co., Ltd.,
State Grid Hebei Electric Power Co., Ltd. Xiong'an New District Power Supply Company, Beijing Jingyi North Instrument Co., Ltd., Ningxia LONGi Ningguang Instrument Co., Ltd.
Co., Ltd., Beijing Yupont Power Technology Co., Ltd., Aerospace Liangli Electric Co., Ltd., Qingdao Dingxin Communication Co., Ltd.,
Zhongnan Instrument Co., Ltd., Guangdong Baijin New Energy Co., Ltd., Jinhua Wangyuan Electronic Technology Co., Ltd., State Grid Shandong Electric Power Company.
The main drafters of this document. Cui Jindong, Jiang Bin, Shen Chunlei, Zhang Dengqing, Li Ji, Chen Ding, Huang Jianzhong, Yin Cong, Meng Juan, Shen Xin, Pan Feng,
Yun Hongjian, Bao Jin, Zeng Shitu, Xiao Jie, Ma Jun, Li Xianzhong, Chen Zhiru, Mou Hao, Gao Shuai, Jiang Wenqian, Hou Lei, Li Tao, Cao Xianwei, Li Ning,
Sun Xiaotong, Xu Pengfei, Zhang Hongrui, Liu Yuanzhen, Xiang Xinming.
Introduction
IEC 60364-6 specifies the initial testing, continuous monitoring and adjustment of electrical installations in TN, TT or IT systems.
Standardized conditions for post-conditioning experiments. In addition to specifying general standards for carrying out these tests, IEC 60364-6 also covers the need to pass measurements
to verify the requirements. Only in a few cases, such as when measuring insulation resistance, does IEC 60364-6 cover the measuring equipment used.
set feature details. Circuit diagrams given as examples in IEC 60364-6 and referenced in the text of the document are generally not applicable to
actual use.
Conducting tests in electrical installations can easily lead to accidental
outside. Therefore, in addition to simplifying the measurement, technicians need to rely on the measurement device to ensure the safety of the measurement method.
The application of the general safety rules for electrical and electronic measuring devices (IEC 61010-1) for testing of protective measures is not sufficient in itself. exist
Measurements in electrical installations are not only harmful to technicians, but also to third parties due to different measurement methods.
Also, in order to obtain an objective judgement about the equipment, for example periodic testing after equipment handover, continuous insulation monitoring or
In the case of performance assurance, an important prerequisite is to obtain reliable and comparable measurement results using measuring devices from different manufacturers.
The purpose of formulating GB/T 18216 is to specify uniform principles consistent with the above characteristics, these principles apply to nominal voltage AC
Measuring and monitoring equipment for electrical safety testing and performance testing in systems of 1000V and DC 1500V and below. GB/T 18216
It consists of ten parts.
--- Part 1.General requirements. The purpose is to establish a low-voltage power distribution system with a nominal voltage of AC 1000V and DC 1500V and below.
General requirements for test equipment used in electrical safety measurement and monitoring systems.
--- Part 2.Insulation resistance. The purpose is to establish that the measurement is suitable for the insulation of equipment and electrical installations in the non-excited state
Requirements for resistive devices.
--- Part 3.Loop impedance. The purpose is to establish between the measuring line conductor and the protective conductor, between the line conductor and the neutral conductor or between the two conductors.
Requirements related to loop impedance equipment between line conductors.
--- Part 4.Grounding resistance and equipotential grounding resistance. The purpose is to establish the grounding conductor, protective grounding conductor and
and related technical requirements for the resistance of equipotential bonding conductors.
--- Part 5.Resistance to ground. The purpose is to establish the requirements for measuring equipment that uses AC voltage to measure resistance to earth.
--- Part 6.Effectiveness of residual current devices (RCDs) in TT, TN and IT systems. The purpose is to establish a test for TT,
Requirements for measuring equipment for the effectiveness of protective measures for residual current devices in TN and IT systems.
--- Part 8.Insulation monitoring devices in IT systems. The purpose is to establish the relevant requirements for insulation monitoring devices in IT systems.
--- Part 9.Insulation fault location equipment in IT systems. The purpose is to establish the phase of insulation fault location equipment in IT system.
off requirements.
--- Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish within a device
A combined measuring device that combines several measuring functions or test methods for testing, measuring or monitoring in accordance with the various parts of IEC 61557
prepared requirements.
--- Part 12.Performance measurement and monitoring device (PMD). The purpose is to establish a comprehensive system for measuring and monitoring electrical parameters in power distribution systems.
meet the relevant requirements for performance measurement and monitoring devices.
AC 1000V and DC 1500V and below low voltage
Test of electrical safety protection measures for power distribution system,
Measuring or monitoring equipment - Part 10.For protection
Combined measuring equipment for testing, measuring or monitoring measures
1 Scope
This document specifies the combination within one device of several measuring functions or functions for testing, measuring or monitoring in accordance with the various parts of IEC 61557.
Requirements for combined measuring equipment for test methods.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
IEC 61010-2-030.2017 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2-030.Test or measurement
circuits)1)
IEC 61557-1 Test and measurement of electrical safety protection measures for low-voltage power distribution systems of AC 1000V and DC 1500V and below
measures-Part 1.Generalrequirements)
Note 1.GB/T 18216.1-2021 Test and measurement of electrical safety protection measures for AC 1000V and DC 1500V and below low-voltage power distribution systems
Or monitoring equipment Part 1.General requirements (IEC 61557-1.2019, IDT).
IEC 61557-2 Test and measurement of electrical safety protection measures for low-voltage power distribution systems of AC 1000V and DC 1500V and below
Note 2.GB/T 18216.2-2021 Test and measurement of electrical safety protection measures for AC 1000V and DC 1500V and below low-voltage power distribution systems
Or monitoring equipment Part 2.Insulation resistance (IEC 61557-2.2019, IDT).
IEC 61557-3 Test and measurement of electrical safety protection measures for low-voltage power distribution systems of AC 1000V and DC 1500V and below
measures-Part 3.Loopimpedance)
Note 3.GB/T 18216.3-2021 Test and measurement of electrical safety protection measures for AC 1000V and DC 1500V and below low-voltage power distribution systems
Or monitoring equipment Part 3.Loop impedance (IEC 61557-3.2019, IDT).
1) The original text is IEC 61010-2-030.2010, which has been abolished. The latest version is IEC 61010-2-030.2017, and the related technical content cited has not changed.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18216.10-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 18216.10-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 18216.10-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18216.10-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|