HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 18216.10-2022 English PDF

US$194.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18216.10-2022: Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 18216.10-2022English194 Add to Cart 3 days [Need to translate] Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures Valid GB/T 18216.10-2022

PDF similar to GB/T 18216.10-2022


Standard similar to GB/T 18216.10-2022

GB 4793   GB/T 15284   GB/T 17215.321   GB/T 18216.12   GB/T 18216.7   GB/T 18216.11   

Basic data

Standard ID GB/T 18216.10-2022 (GB/T18216.10-2022)
Description (Translated English) Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measur
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard N20
Word Count Estimation 10,148
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 18216.10-2022: Electrical safety in low voltage distribution systems up to 1000V a.c. and 1500V d.c. - Equipment for testing, measuring or monitoring of protective measures - Part 10: Combined measuring equipment for testing, measuring or monitoring of protective measures



---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrical safety in low voltage distribution systems up to 1000V acand 1500V dc- Equipment for testing, measuring or monitoring of protective measures - Part 10.Combined measuring equipment for testing, measuring or monitoring of protective meas ICS 17.220.20 CCSN20 National Standards of People's Republic of China AC 1000V and DC 1500V and below low voltage Test of electrical safety protection measures for power distribution system, Measuring or monitoring equipment - Part 10.For protection Combined measuring equipment for testing, measuring or monitoring measures (IEC 61557-10.2013, IDT) 2022-10-12 Released 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Requirements 2 4.1 General Requirements 2 4.2 Signs and graphic symbols3 5 Logos and Instructions for Use 3 6 Experiment 4 Reference 5 Figure 1 Example 3 of a graphic symbol for an AC 500V system Table 1 External overvoltage withstand capability3

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is GB/T 18216 "AC 1000V and DC 1500V and below low-voltage power distribution system electrical safety protection measures. Test, Measuring or Monitoring Equipment, Part 10.GB/T 18216 has published the following parts. --- Part 1.General requirements; --- Part 2.Insulation resistance; --- Part 3.Loop impedance; --- Part 4.Grounding resistance and equipotential grounding resistance; --- Part 5.Resistance to ground; --- Part 6.Effectiveness of residual current devices (RCDs) in TT, TN and IT systems; --- Part 8.Insulation monitoring devices in IT systems; --- Part 9.Equipment for locating insulation faults in IT systems; --- Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures; --- Part 12.Performance measurement and monitoring device (PMD). This document is identical to IEC 61557-10.2013 "Electrical safety of low-voltage power distribution systems of AC 1000V and DC 1500V and below" Testing, measuring or monitoring equipment for total protective measures - Part 10.Combined measuring equipment for testing, measuring or monitoring of protective measures Prepare". Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Machinery Industry Federation. This document is under the jurisdiction of the National Standardization Technical Committee of Electrical Instrumentation (SAC/TC104). This document is drafted by. State Grid Zhejiang Electric Power Co., Ltd. Jiaxing Power Supply Company, Northeast Electric Power University, State Grid Xiong'an Integrated Energy Service Co., Ltd., Harbin Electrical Instrument Research Institute Co., Ltd., Xiamen Yesheng Electric Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd. Company, Shenzhen Xinglong Technology Co., Ltd., Heilongjiang Provincial Electrical Instrumentation Engineering Technology Research Center Co., Ltd., Zhejiang UBS Electronics Co., Ltd., Yunnan Power Grid Co., Ltd., Guangdong Power Grid Co., Ltd. Measurement Center, Hebei Xiong’an Xujidian Technology Integrated Energy Technology Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Marketing Service Center, Huali Technology Co., Ltd., State Grid Sichuan Electric Power Company, State Grid Shandong Electric Power Company Marketing Service Center (Measuring Center), State Grid Jibei Electric Power Co., Ltd. Measuring Center, Guangxi Power Grid Co., Ltd., State Grid Hebei Electric Power Co., Ltd. Xiong'an New District Power Supply Company, Beijing Jingyi North Instrument Co., Ltd., Ningxia LONGi Ningguang Instrument Co., Ltd. Co., Ltd., Beijing Yupont Power Technology Co., Ltd., Aerospace Liangli Electric Co., Ltd., Qingdao Dingxin Communication Co., Ltd., Zhongnan Instrument Co., Ltd., Guangdong Baijin New Energy Co., Ltd., Jinhua Wangyuan Electronic Technology Co., Ltd., State Grid Shandong Electric Power Company. The main drafters of this document. Cui Jindong, Jiang Bin, Shen Chunlei, Zhang Dengqing, Li Ji, Chen Ding, Huang Jianzhong, Yin Cong, Meng Juan, Shen Xin, Pan Feng, Yun Hongjian, Bao Jin, Zeng Shitu, Xiao Jie, Ma Jun, Li Xianzhong, Chen Zhiru, Mou Hao, Gao Shuai, Jiang Wenqian, Hou Lei, Li Tao, Cao Xianwei, Li Ning, Sun Xiaotong, Xu Pengfei, Zhang Hongrui, Liu Yuanzhen, Xiang Xinming.

Introduction

IEC 60364-6 specifies the initial testing, continuous monitoring and adjustment of electrical installations in TN, TT or IT systems. Standardized conditions for post-conditioning experiments. In addition to specifying general standards for carrying out these tests, IEC 60364-6 also covers the need to pass measurements to verify the requirements. Only in a few cases, such as when measuring insulation resistance, does IEC 60364-6 cover the measuring equipment used. set feature details. Circuit diagrams given as examples in IEC 60364-6 and referenced in the text of the document are generally not applicable to actual use. Conducting tests in electrical installations can easily lead to accidental outside. Therefore, in addition to simplifying the measurement, technicians need to rely on the measurement device to ensure the safety of the measurement method. The application of the general safety rules for electrical and electronic measuring devices (IEC 61010-1) for testing of protective measures is not sufficient in itself. exist Measurements in electrical installations are not only harmful to technicians, but also to third parties due to different measurement methods. Also, in order to obtain an objective judgement about the equipment, for example periodic testing after equipment handover, continuous insulation monitoring or In the case of performance assurance, an important prerequisite is to obtain reliable and comparable measurement results using measuring devices from different manufacturers. The purpose of formulating GB/T 18216 is to specify uniform principles consistent with the above characteristics, these principles apply to nominal voltage AC Measuring and monitoring equipment for electrical safety testing and performance testing in systems of 1000V and DC 1500V and below. GB/T 18216 It consists of ten parts. --- Part 1.General requirements. The purpose is to establish a low-voltage power distribution system with a nominal voltage of AC 1000V and DC 1500V and below. General requirements for test equipment used in electrical safety measurement and monitoring systems. --- Part 2.Insulation resistance. The purpose is to establish that the measurement is suitable for the insulation of equipment and electrical installations in the non-excited state Requirements for resistive devices. --- Part 3.Loop impedance. The purpose is to establish between the measuring line conductor and the protective conductor, between the line conductor and the neutral conductor or between the two conductors. Requirements related to loop impedance equipment between line conductors. --- Part 4.Grounding resistance and equipotential grounding resistance. The purpose is to establish the grounding conductor, protective grounding conductor and and related technical requirements for the resistance of equipotential bonding conductors. --- Part 5.Resistance to ground. The purpose is to establish the requirements for measuring equipment that uses AC voltage to measure resistance to earth. --- Part 6.Effectiveness of residual current devices (RCDs) in TT, TN and IT systems. The purpose is to establish a test for TT, Requirements for measuring equipment for the effectiveness of protective measures for residual current devices in TN and IT systems. --- Part 8.Insulation monitoring devices in IT systems. The purpose is to establish the relevant requirements for insulation monitoring devices in IT systems. --- Part 9.Insulation fault location equipment in IT systems. The purpose is to establish the phase of insulation fault location equipment in IT system. off requirements. --- Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish within a device A combined measuring device that combines several measuring functions or test methods for testing, measuring or monitoring in accordance with the various parts of IEC 61557 prepared requirements. --- Part 12.Performance measurement and monitoring device (PMD). The purpose is to establish a comprehensive system for measuring and monitoring electrical parameters in power distribution systems. meet the relevant requirements for performance measurement and monitoring devices. AC 1000V and DC 1500V and below low voltage Test of electrical safety protection measures for power distribution system, Measuring or monitoring equipment - Part 10.For protection Combined measuring equipment for testing, measuring or monitoring measures

1 Scope

This document specifies the combination within one device of several measuring functions or functions for testing, measuring or monitoring in accordance with the various parts of IEC 61557. Requirements for combined measuring equipment for test methods.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. IEC 61010-2-030.2017 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2-030.Test or measurement circuits)1) IEC 61557-1 Test and measurement of electrical safety protection measures for low-voltage power distribution systems of AC 1000V and DC 1500V and below measures-Part 1.Generalrequirements) Note 1.GB/T 18216.1-2021 Test and measurement of electrical safety protection measures for AC 1000V and DC 1500V and below low-voltage power distribution systems Or monitoring equipment Part 1.General requirements (IEC 61557-1.2019, IDT). IEC 61557-2 Test and measurement of electrical safety protection measures for low-voltage power distribution systems of AC 1000V and DC 1500V and below Note 2.GB/T 18216.2-2021 Test and measurement of electrical safety protection measures for AC 1000V and DC 1500V and below low-voltage power distribution systems Or monitoring equipment Part 2.Insulation resistance (IEC 61557-2.2019, IDT). IEC 61557-3 Test and measurement of electrical safety protection measures for low-voltage power distribution systems of AC 1000V and DC 1500V and below measures-Part 3.Loopimpedance) Note 3.GB/T 18216.3-2021 Test and measurement of electrical safety protection measures for AC 1000V and DC 1500V and below low-voltage power distribution systems Or monitoring equipment Part 3.Loop impedance (IEC 61557-3.2019, IDT). 1) The original text is IEC 61010-2-030.2010, which has been abolished. The latest version is IEC 61010-2-030.2017, and the related technical content cited has not changed.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18216.10-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18216.10-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18216.10-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18216.10-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.