HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 18216.7-2024 English PDF

US$394.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18216.7-2024: Electrical safety in low voltage distribution systems up to 1000V a. c. and 1500V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 18216.7-2024English394 Add to Cart 4 days [Need to translate] Electrical safety in low voltage distribution systems up to 1000V a. c. and 1500V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence Valid GB/T 18216.7-2024

PDF similar to GB/T 18216.7-2024


Standard similar to GB/T 18216.7-2024

GB 4793   GB/T 15284   GB/T 17215.321   GB/T 18216.12   GB/T 18216.11   GB/T 18216.6   

Basic data

Standard ID GB/T 18216.7-2024 (GB/T18216.7-2024)
Description (Translated English) Electrical safety in low voltage distribution systems up to 1000V a. c. and 1500V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard N20
Classification of International Standard 17.220.20
Word Count Estimation 20,221
Date of Issue 2024-07-24
Date of Implementation 2025-02-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 18216.7-2024: Electrical safety in low voltage distribution systems up to 1000V a. c. and 1500V d. c. - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence



---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Electrical safety in low voltage distribution systems up to 1000V acand 1500V dc- Equipment for testing, measuring or monitoring of protective measures - Part 7.Phase sequence AC 1 000 V and DC 1 500 V and below Electrical safety of low voltage power distribution system Equipment for testing, measuring or monitoring protective measures Part 7.Phase Sequence Electrical safety in low voltage distribution systems up to 1 000 Vacand 1 500 V dc-Equipment for testing, measuring or monitoring of protective meas﹘ ures- Part 7:Phase sequence (IEC 61557-7.2019, IDT) ICS 17.220.20 CCS N20 National Standard of the People's Republic of China Released on July 24, 2024, implemented on February 1, 2025 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface ... Ⅲ Introduction ... V 1 Scope ... 1 2 Normative references ... 1 3 Terms and Definitions ... 1 4 Requirements ... 2 4.1 General requirements 2 4.2 Instructions 2 4.3 Measuring equipment 2 5 Marking and instruction manual ... 3 5.1 Logo ... 3 5.2 User Manual ... 3 6 Experiments ... 3 6.1 Overview ... 3 6.2 Leakage Current ... 4 6.3 Mechanical requirement test (type test) 5 6.4 Overvoltage ... 5 6.5 Marking Test 5 Appendix A (Normative) Mechanical Test Diagrams ... 6 Appendix B (Informative) Phase sequence test 7 B.1 Phase sequence test - three-pole connection method 7 B.2 Phase sequence test - two-pole connection method 7 References ... 9

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. This document is a test document of GB/T 18216 "Test Methods for Electrical Safety Protection Measures for Low Voltage Distribution Systems with AC 1 000 V and DC 1 500 V and Below" Part 7 of GB/T 18216.GB/T 18216 has published the following parts. Part 1.General requirements;- Part 2.Insulation resistance; Part 3.Loop impedance;- Part 4.Earth resistance and equipotential earth resistance; Part 5.Resistance to Earth; Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems; - Part 7.Phase sequence; Part 8.Insulation monitoring devices in IT systems; Part 9.Insulation fault location equipment in IT systems; Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures; - Part 12.Performance measuring and monitoring devices (PMD). - This document is equivalent to IEC 61557﹘7.2019 "Electrical safety of low voltage power distribution systems up to 1 000 V AC and 1 500 V DC" Testing, measuring or monitoring equipment for protective measures - Part 7.Phase sequence. The following minimal editorial changes were made to this document. Incorporates the amendments to IEC 61557﹘7.2019/AMD1.2023, the clauses involved in these amendments have been updated through their external The margins are indicated by double vertical lines (||). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Machinery Industry Federation. This document is under the jurisdiction of the National Technical Committee for Standardization of Electrical Instruments (SAC/TC 104). This document was drafted by. State Grid Zhejiang Electric Power Co., Ltd. Hangzhou Yuhang District Power Supply Company, Harbin Electric Instrument Research Institute Co., Ltd. Co., Ltd., Zhejiang Chint Instruments Co., Ltd., Huali Technology Co., Ltd., Zhejiang Anfu New Energy Technology Co., Ltd., Shenzhen Kelu Electronic Technology Co., Ltd., State Grid Heilongjiang Electric Power Co., Ltd. Electric Power Research Institute, State Grid Chongqing Electric Power Company Marketing Service Center, China Southern Power Grid Co., Ltd. Ultra-high Voltage Transmission Company, Ante Instrument Group Co., Ltd., State Grid Jilin Electric Power Co., Ltd. Marketing Service Center, State Grid Sichuan Electric Power Company Marketing Service Center, Guangdong Power Grid Co., Ltd. Measurement Center, Ningbo Jia Yunnan Intelligent Electric Co., Ltd., Yunnan Power Grid Co., Ltd., State Grid Xinjiang Electric Power Co., Ltd. Electric Power Research Institute, State Grid Beijing City Power Company Urban Power Supply Company, Shandong Guangyun Intelligent Technology Co., Ltd., State Grid Sichuan Power Company Luzhou Power Supply Company, Shandong Electric Electric Group Co., Ltd., Shandong Electric Group New Energy Technology Co., Ltd., Qingdao Dingxin Communication Co., Ltd., China Southern Power Grid Digital Power Grid Research Institute Co., Ltd., Shaoxing Shangyu District Standardization Research Institute, Henan High Voltage Electrical Equipment Research Institute Co., Ltd., Zhejiang Wansheng Intelligent Technology Technology Co., Ltd., Jiangxi Yifa Electric Power Technology Co., Ltd., Shenzhen Hongxing Zhilian Technology Co., Ltd., Jiangsu Huapeng Intelligent Instrument Technology Technology Co., Ltd., Shengli Oilfield Hengda Electric Co., Ltd., Zhejiang Chentai Technology Co., Ltd., Jiangsu Zhinengjie Energy Technology Co., Ltd., Northeast Electric Power University, Tianjin Baofu Electric Co., Ltd., Beijing Yubang Electric Power Technology Co., Ltd., Henan Tailong Electric Power Equipment Co., Ltd. Co., Ltd., Beijing Jiaotong University, China Railway 25th Bureau Group Electric Engineering Co., Ltd., Liaocheng Huarui Electric Co., Ltd., Zhejiang Nanjin Electric Co., Ltd., State Grid Henan Electric Power Company Kaifeng Power Supply Company, Xiamen Tuobao Technology Co., Ltd., China Railway Third Engineering Bureau Group Electric Engineering Cheng Co., Ltd., Chongqing Rongkai Chuanyi Instrument Co., Ltd. The main drafters of this document are. Jiang Bin, Yao Haiyan, Gu Zhangping, Zeng Shitu, Cheng Pin, Liu Jia, Wang Lei, Cheng Yingying, Wen Caiquan, Zhang Zongji, Tang Weining, Kong Fanqiang, Yao Wenbo, Liu Lina, Pan Feng, Yang Yuyao, Zhang Enyou, Shen Xin, Zhang Jingmin, Yuan Longxiang, Li Hongchuan, Li Bin, Cheng Xingliang, Zhao Yongzhi, Han Kejun, Wang Shijun, Li Hongquan, Diao Ruipeng, Lü Chao, Xing Wenqi, Ding Yi, Zheng Shengyou, Li Keguang, Dai Wenjun, Zhang Chao, Liu Gengxing, He Ziang, Yang Kuigang, Chen Qifang, Wang Bin, Wang Honggang, Xie Hua, Cui Jindong, Zhang Mi, Zhao Ruichen, Ji Nannan, Ma Taiyuan, Fang Hui, Chen Binghua, Qian Chun, Xu Guohui, Zuo Yunhong.

Introduction

Low voltage power distribution grounding systems are divided into three types. IT system, TT system and TN system. IEC 60364﹘6 specifies the grounding system of the above systems. Standardized conditions for initial testing of power installation equipment, for continuous monitoring, and for testing of these equipment after adjustment. In addition to the applicable standards, IEC 60364﹘6 also includes requirements that need to be verified by measurement. Only in a few cases, such as when measuring absolute When measuring insulation resistance, IEC 60364﹘6 includes details of the characteristics of the measuring device used. Circuit diagrams cited in the text are generally not suitable for actual use. When dangerous voltages are present in electrical installations or equipment is used improperly or is damaged, testing in electrical installations can easily cause accidents. Therefore, technicians need to rely on measuring devices that ensure the safety of the measuring method in addition to simplifying the measurement. Applying the general rules for safety of electrical and electronic measuring devices (IEC 61010﹘1) to perform protective measures testing is not sufficient in itself. Measurements in power installations can pose a hazard not only to the technicians but also to third parties due to different measurement methods. Likewise, in order to obtain an objective assessment of the equipment, for example, periodic testing, continuous insulation monitoring or In the case of performance assurance, an important prerequisite is to obtain reliable and comparable measurement results with measuring devices from different manufacturers. GB/T 18216 "Test, The purpose of the "Measuring or Monitoring Equipment" is to provide uniform principles for compliance with the above characteristics, which apply to nominal voltage AC Measuring and monitoring equipment for electrical safety tests and performance tests in systems with a voltage of 1 000 V and DC 1 500 V and below. GB/T 18216 It consists of seventeen parts. Part 1.General requirements. The purpose is to establish the low voltage distribution system with a nominal voltage of 1 000 V AC and 1 500 V DC and below. General requirements for test equipment for measuring and monitoring electrical safety. Part 2.Insulation resistance. The purpose is to establish the insulation resistance of equipment and electrical installations in the non-energized state. Requirements for resistance equipment. Part 3.Loop impedance. The purpose is to establish the impedance between the line conductor and the protective conductor, between the line conductor and the neutral conductor, or between the two. Requirements for loop impedance equipment between line conductors. Part 4.Earth resistance and equipotential earth resistance. The purpose is to establish the earth conductor of the measuring equipment, the protective earth conductor and And related requirements for equipotential bonding conductor resistance. Part 5.Resistance to Earth. The purpose is to establish requirements for measuring equipment that uses an alternating voltage to measure resistance to earth. Part 6.Effectiveness of residual current devices (RCD) in TT, TN and IT systems. The purpose is to establish the effectiveness of residual current devices (RCD) in TT, TN and IT systems. Requirements for measuring equipment for the effectiveness of protective measures taken by residual current devices in TT, TN and IT systems. Part 7.Phase sequence. The purpose is to establish the requirements for measuring equipment used to measure the phase sequence of three-phase power distribution systems. Part 8.Insulation monitoring devices in IT systems. The purpose is to establish the requirements for insulation monitoring devices in IT systems. Part 9.Insulation fault location equipment in IT systems. The purpose is to establish the relevant Require. Part 10.Combined measuring equipment for testing, measuring or monitoring protective measures. The purpose is to establish the Combined measuring equipment that combines several measuring functions or test methods for testing, measuring or monitoring in accordance with the respective parts of this series of standards requirements. Part 11.Effectiveness of residual current monitors (RCM) in TT, TN and IT systems. The purpose is to establish Requirements for equipment for testing the effectiveness of residual current monitors installed in power distribution systems. Part 12.Quantity Measuring and Monitoring Devices (PMD). The purpose is to establish a comprehensive system for measuring and monitoring electrical parameters in power distribution systems. Relevant requirements for combined electrical quantity measuring and monitoring devices. Part 13.Hand-held and hand-operated current clamps and sensors for measuring leakage current in distribution systems. Requirements for hand-held and hand-operated current clamps and sensors for measuring leakage current in systems. Part 14.Equipment for testing the safety of electrical equipment of machinery. The purpose is to specify the equipment used to test the safety of electrical equipment of machinery. Special requirements for equipment. Part 15.Functional safety requirements for insulation monitoring devices and insulation fault location equipment in IT systems. The purpose is to specify the functional safety requirements for insulation monitoring devices and insulation fault location equipment in IT systems. Functional safety requirements for insulation monitoring devices and insulation fault location equipment. Part 16.Equipment for testing the effectiveness of protective measures for electrical equipment and/or medical electrical equipment. Particular requirements for equipment to assess the effectiveness of protective measures for medical electrical equipment and/or medical electrical equipment. Part 17.Non-contact voltage indicators. The purpose is to specify the minimum performance requirements for non-contact voltage indicators. - AC 1 000 V and DC 1 500 V and below Electrical safety of low voltage power distribution system Equipment for testing, measuring or monitoring protective measures Part 7.Phase Sequence

1 Scope

This document specifies the requirements for measuring equipment used to test the phase sequence of three-phase power distribution systems. The indication of phase sequence may be mechanical, visual or and/or auditory. This document does not apply to additional measurements of other quantities nor to monitoring relays. Note. Appendix I of IEC 61010﹘1.2016 describes common three-phase power distribution systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies. in this document. GB/T 18216.1-2021 Test Method for Electrical Safety Protection Measures for Low Voltage Distribution Systems with AC 1 000 V and DC 1 500 V and Below Testing, measuring or monitoring equipment Part 1.General requirements (IEC 61557﹘1.2019, IDT) IEC 61010﹘1.2016 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1.General requirements requirements for electrical equipment for measurement, control, and laboratory use-Part 1.General requirements Note. GB 4793.1-2007 Safety requirements for electrical equipment for measurement, control and laboratory use Part 1.General requirements (IEC 61010﹘1..2001, IDT IEC 61010﹘2﹘030 Safety requirements for electrical equipment for measurement, control and laboratory use Part 2﹘030.Test or measuring circuits Safety requirements for electrical equipment for measurement, control, and laborat ory use-Part 2﹘030:Particular requirements for equipment having testing or measuring circuits) IEC 61010﹘031 Safety requirements for electrical equipment for measurement, control and laboratory use Part 031.Handheld instruments for electrical measurement and testing Safety requirements for electrical equipment for measurement, control and laboratory use-Part 031.Safety requirements for hand﹘held and hand﹘manipulated probe assem﹘ blies for electrical test and measurement) Note. GB 4793.5-2008 Safety requirements for electrical equipment for measurement, control and laboratory use Part 5.Hand-held probe assemblies for electrical measurement and test Safety requirements (IEC 61010﹘031.2002, IDT)

3 Terms and definitions

The terms and definitions defined in GB/T 18216.1-2021 and the following apply to this document. The URLs for terminology databases used for standardization maintained by ISO and IEC are as follows.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18216.7-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18216.7-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18216.7-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18216.7-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.