US$859.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 18037-2008: Technical requirements and design guide for live working tools Status: Valid GB/T 18037: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 18037-2008 | English | 859 |
Add to Cart
|
6 days [Need to translate]
|
Technical requirements and design guide for live working tools
| Valid |
GB/T 18037-2008
|
GB/T 18037-2000 | English | RFQ |
ASK
|
9 days [Need to translate]
|
Live working tools, technical requirements and design guide
| Obsolete |
GB/T 18037-2000
|
PDF similar to GB/T 18037-2008
Basic data Standard ID | GB/T 18037-2008 (GB/T18037-2008) | Description (Translated English) | Technical requirements and design guide for live working tools | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | K47 | Classification of International Standard | 29.240.20 | Word Count Estimation | 39,376 | Date of Issue | 2008-09-24 | Date of Implementation | 2009-08-01 | Older Standard (superseded by this standard) | GB/T 18037-2000 | Quoted Standard | GB 311.1; GB/T 14286; DL 409; DL/T 974 | Regulation (derived from) | Announcement of Newly Approved National Standards No. 16 of 2008 (No. 129 overall) | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the AC 10kV ~ 750kV, DC �� 500kV live working tools should have the basic technical requirements, proposed tool design, checking, storage, inspection and other technical specifications and guidelines. |
GB/T 18037-2008: Technical requirements and design guide for live working tools---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements and design guide for live working tools
ICS 29.240.20
K47
National Standards of People's Republic of China
Replacing GB/T 18037-2000
Live working tools Technical requirements and design guide
Posted 2008-09-24
2009-08-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 live work tool selection principle 2
5 mechanical design principles and requirements 9
6 electrical design principles and requirements 12
7 craft structure design requirements 17
8 Packaging Design Requirements 19
9 warehouse design tool 20
10 20 Test Tools
Appendix A (normative) Mechanical checking 21
Appendix B (normative) main tool of Series 33
Annex C (informative) live working clearance altitude correction 35
Foreword
This standard replaces GB/T 18037-2000 "live working tools Technical requirements and design guidelines."
The main difference compared with the standard GB/T 18037-2000 as follows.
--- The indicator increased moisture and high insulation strength of the insulating rope rope;
--- Information about 750kV AC line tools for live working principle and electrical design requirements;
--- Increasing the production of insulating materials, protective equipment selection principles, design principles and requirements;
--- Part of the tool warehouse design was modified.
The Standard Appendix A, Appendix B is normative appendix, Appendix C is informative appendix.
The standard proposed by China Electricity Council.
This standard by the National Standardization Technical Committee work and live under the jurisdiction responsible for the interpretation.
This standard is mainly drafted by. State Grid Wuhan High Voltage Research Institute, Jinzhou Power Supply Company, Huludao power company.
The main drafters of this standard. An annual party, Hu Yi, Xue Yan, Xiao Kun, Wang Linong, Xu Ying.
This standard replaces the standards previously issued as follows.
--- GB/T 18037-2000.
Live working tools Technical requirements and design guide
1 Scope
This standard specifies the exchange 10kV ~ 750kV, DC ± 500kV live working tools should have the basic technical requirements proposed
Design tools, checking, storage, technical specifications and guidelines for testing and other aspects.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB 311.1 insulation with high-voltage power transmission equipment (GB 311.1-1997, neqIEC 60071-1.1993)
GB/T 14286 live working tools and equipment term (GB/T 14286-2008, IEC 60743.2001, MOD)
Electrical safety regulations DL409
DL/T 974 live working tools warehouse
3 Terms and Definitions
GB/T 14286 and determined the following terms and definitions apply to this standard.
3.1 Tool Name
3.1.1
In rigid insulation plates, tubes, rods and various profiles based tool member made, including general operating lever, bearing rod, hard ladder, prop bottle holder,
Operating platform, tackle, arm car, pole, etc.
3.1.2
A flexible member made of insulating material based tools, including various ropes and their products and a variety of hose, soft board, soft rods manufactured goods.
3.1.3
Charged workers use safety equipment in general, comprises an insulating shield appliances, utensils and electric insulating protective shield appliances.
3.1.4
For persons charged with the job of insulating material dedicated security products, including insulated gloves, insulating sleeve, insulated shoes, insulated
Blanket.
3.1.5
A strong electric field shielding supplies with a conductive material, including shielding clothing, anti-static clothing, conductive shoes, conductive gloves.
3.1.6
To isolate the operator from live body, and meet certain levels of insulation shielding equipment, including a variety of soft and hard masking cover, bezel, and must
Edge coverings and the like.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 18037-2008_English be delivered?Answer: Upon your order, we will start to translate GB/T 18037-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 18037-2008_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 18037-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 18037-2008?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 18037-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|