HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB/T 14984.2-2010 English PDF

US$189.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 14984.2-2010: Ferroalloys -- Vocabulary -- Part 2: Sampling and sample preparation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 14984.2-2010English189 Add to Cart 3 days [Need to translate] Ferroalloys -- Vocabulary -- Part 2: Sampling and sample preparation Valid GB/T 14984.2-2010

PDF similar to GB/T 14984.2-2010


Standard similar to GB/T 14984.2-2010

GB/T 16865   GB/T 17394.4   GB/T 17394.1   GB/T 45169   GB/T 45597   GB/T 14984.1   

Basic data

Standard ID GB/T 14984.2-2010 (GB/T14984.2-2010)
Description (Translated English) Ferroalloys -- Vocabulary -- Part 2: Sampling and sample preparation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard H22
Classification of International Standard 77.100
Word Count Estimation 8,819
Date of Issue 2010-09-02
Date of Implementation 2011-06-01
Older Standard (superseded by this standard) GB/T 14984-1994
Adopted Standard ISO 8954-2-1990, MOD
Regulation (derived from) National Standard Approval Announcement 2010 No.4 (Total No.159)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the ferroalloy assay sampling and sample preparation related terminology. This section applies to the technical requirements of ferroalloys, delivery conditions, sampling and sample preparation.

GB/T 14984.2-2010: Ferroalloys -- Vocabulary -- Part 2: Sampling and sample preparation

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
. Ferroalloys Vocabulary Part 2. Sampling and sample preparation ICS 77.100 H22 National Standards of People's Republic of China Replacing GB/T 14984-1994 Base section Ferroalloys - Terminology - Part 2. Sampling and sample preparation Ferroaloys-Vocabulary-Part 2. Samplingandsamplepreparation (ISO 8954.2.1990, MOD) Issued on. 2010-09-02 2011-06-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

GB/T 14984 "Ferroalloy term" is divided into three parts. --- Part 1. Materials; --- Part 2. Sampling and sample preparation; --- Part 3. Screening. This is Part 2. The partial modification of the use of ISO 8954-2.1990 "Ferroalloys - Vocabulary - Part 2. Sampling and sample preparation" (in English). This section according to ISO 8954-2.1990 redrafted. This section lists the control provisions of international standards and a clause in Appendix A Lanbiao relevant technical differences have been incorporated into the text, and they are involved in terms of the margin of a single vertical line identified in Appendix B It gives a list of the technical differences and the reasons for the reference. This part of the international standard and also made the following editorial changes. --- "This International Standard" be replaced by "this section"; "." --- With a decimal point instead of a comma as the decimal point, ""; --- Introduction of international standards and delete references. This Part replaces GB /"Ferroalloy term" corresponding section T 14984-1994. This section compared with the GB/T 14984-1994, mainly revised in the following areas. --- Remove the general terms and ferroalloy product nomenclature; --- Deleted the term ferroalloy screening; --- Increasing the reduction of sub-term. This section in Appendix A and Appendix B is an informative annex. This part is proposed by the China Iron and Steel Association. This part of pig iron and ferroalloy by the National Standardization Technical Committee. This section is drafted. Sinosteel Jilin Ferroalloy Co., Ltd., Metallurgical Industry Information Standards Institute, Shougang Corporation. The main drafters of this section. Liuxian Cheng, Wang Shuang, Sun Yan Duo, Shi Wanli Ma Qin, Zhang Rui Hong, Chenzi Bin, Zhang Lei. This part of the standard replaces the previous editions are. --- GB/T 14984-1994. Ferroalloys - Terminology - Part 2. Sampling and sample preparation

1 Scope

GB/T 14984 and the present section defines the ferroalloy assay sampling and sample preparation-related terminology. This section applies to the technical requirements of ferroalloy, delivery conditions, sampling and sample preparation.

2 sampling and sample preparation

2.1 Sampling sampling The process of sampling. 2.2 Consignment consignment Once delivered, the same production process, and chemical composition and size distribution within a certain range, and with the appropriate quality certificates ferroalloy A certain amount of ferroalloy. 2.3 Furnace batch tappedlot By a group of furnace alloy composition. 2.4 Grade batch gradedlot Several heats of the alloy of the same grade in the same delivery group classified as a group of ferroalloy. 2.5 Typical quality characteristics representativequalitycharacteristic Sampling parameters and determine the value of ferroalloy one element (or multiple elements) content or particle size distribution. 2.6 Sample sample By a group of ferroalloy taken out and represent the characteristics of the part-iron alloy. 2.7 Increment increment With a sampling device or hand pick from a bulk consignment or a package taken once a certain number of ferroalloy. 2.8 Subsample subsample Ferroalloy consignment from a portion of the obtained mixture of two or more parts of the sample composition. 2.9 Large sample grosssample From ferroalloy consignment, all parts of the sample or sub-samples made of a mixture. 2.10 Manual sampling manualsampling Hand picking up or sampling tool (spatula sampling or sampling brazing) manual sampling carried out.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 14984.2-2010_English be delivered?

Answer: Upon your order, we will start to translate GB/T 14984.2-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 14984.2-2010_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 14984.2-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.