|
US$909.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 10863-2011: Thermal test method for gas pass heat recovery boiler Status: Valid GB/T 10863: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 10863-2011 | English | 909 |
Add to Cart
|
7 days [Need to translate]
|
Thermal test method for gas pass heat recovery boiler
| Valid |
GB/T 10863-2011
|
| GB/T 10863-1989 | English | RFQ |
ASK
|
9 days [Need to translate]
|
Thermal test method for gas pass waste heat boiler
| Obsolete |
GB/T 10863-1989
|
PDF similar to GB/T 10863-2011
Basic data | Standard ID | GB/T 10863-2011 (GB/T10863-2011) | | Description (Translated English) | Thermal test method for gas pass heat recovery boiler | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J98 | | Classification of International Standard | 27.060.30 | | Word Count Estimation | 41,472 | | Date of Issue | 2011-12-30 | | Date of Implementation | 2012-07-01 | | Older Standard (superseded by this standard) | GB/T 10863-1989 | | Quoted Standard | GB/T 2900.48-2008 | | Regulation (derived from) | Announcement of Newly Approved National Standards No. 23 of 2011 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the primary and secondary schools to carry out the general requirements for health education, the implementation of objectives, educational content, implementation approaches and evaluation recommendations. This standard applies to primary and secondary schools (including nine years of compulsory education, high school) students at school. |
GB/T 10863-2011: Thermal test method for gas pass heat recovery boiler---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Thermal test method for gas pass heat recovery boiler
ICS 27.060.30
J98
National Standards of People's Republic of China
Replacing GB/T 10863-1989
Flue waste heat boiler thermal test methods
Issued on. 2011-12-30
2012-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Symbols and units 2
5 General 4
6 test preparation 5
7 Test Requirements 5
8 formula 6
9 measurement methods and apparatus 11
10 20 Test Report
Appendix A (normative) waste heat boiler furnace heat loss 22
Density and heat of Annex B (informative) gas 24
Annex C (informative) commonly average gas volumetric specific heat at constant pressure 25
Determination of Annex D (normative) Chloride Titration formulated chemical reagents and steam humidity 26
Calibration coefficient of Appendix E (normative) Determination of the dynamic pressure measuring tube 27
Annex F (normative) smoke isokinetic sampling method 29
Annex G (informative) design data and comprehensive calculation of the test data table 32
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard replaces GB/T 10863-1989, compared with the GB/T 10863-1989, the main changes are as follows.
--- Expanding the scope, not only for low-pressure waste heat boiler can also be used for high-pressure waste heat boiler (1989 Edition Chapter 1; Excerpts
Chapter 1);
--- The test conditions and its provisions were refined (1989 Edition Chapter 4; Chapter 5,6,7 this edition);
The sampling time --- calculate the heat output of superheated steam boiler, sewage, reducing water, steam as well as for personal use with a reheat unit situation
Conditions are taken into consideration [1989 Edition formula (10); Excerpts of the formula (12)];
When saturated steam boiler --- calculation takes into account the sample water heat output of the heat [1989 Edition formula (11); Excerpts of the formula (13)];
--- Fixed low calorific value gaseous fuel formulas [1989 Edition formula (15); Excerpts of the formula (17)];
--- Fixed combustible gas is calculated incomplete combustion heat loss [1989 Edition formula (18); Excerpts of the formula (20)];
--- Fixed flue gas volume flow formulas [1989 Edition formula (23), equation (24); Excerpts of the formula (25), equation (26)];
--- Fixed amount of air leakage into the formula of [1989 Edition formula (32); Excerpts of the formula (34)];
--- Increased steam flow measurement density correction [Excerpts of the formula (37)];
--- Referenced standard terminology, symbols, formulas, etc. to coordinate with the relevant professional standards.
This standard by the National Standardization Technical Committee of the boiler pressure vessel (SAC/TC262) and focal points.
This standard was drafted. Hangzhou Boiler Group Co., Ltd., Zhejiang Special Equipment Inspection and Research Institute, Shanghai Power Equipment provided
Meter Institute.
The main drafters of this standard. Wang Zhong, Jiang Jianmin, Yu Ying, a Defang, ECHNOLOGY Shugu Ying.
This standard replaces the standards previously issued as follows.
--- GB/T 10863-1989.
Flue waste heat boiler thermal test methods
1 Scope
This standard specifies the flue waste heat boiler thermal test methods, as flue waste heat boiler performance and acceptance tests of the product type
in accordance with.
This standard applies to water as the working fluid waste heat boiler flue.
This standard does not apply to shell and tube heat recovery boiler.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For cited documents without a date. The latest version (including any amendments) applies to this document.
GB/T 2900.48-2008 Electrotechnical terminology boiler
3 Terms and Definitions
GB/T 2900.48-2008 defined and the following terms and definitions apply to this document.
3.1
Waste heat boiler flue gaspassheatrecoveryboiler
Use of waste heat medium (a variety of industrial process waste gas, waste or waste) sensible heat contained in or (and) after the burning of combustible substances
Heat (necessary, to add afterburning), and is arranged in the flue of the heating surface heat exchange to generate steam or hot water boiler, a structure similar to
Water tube or shell type boilers.
3.2
Heat input heatinput
The total heat input per unit time HRSG heat resources.
3.3
Effective heat output heatoutput
Total calories per unit time in the boiler working fluid absorbed, including heat and water vapor absorption, as well as sewage water and steam consumption for personal use
Consumption of calories.
3.4
Calorific netcalorificvalue
It refers to combustible materials per unit volume or unit mass of waste heat contained under certain conditions, complete combustion heat released in the buckle
In addition to heat water vapor condenses into water after the latent heat of vaporization obtained.
3.5
Reference temperature referencetemperature
To calculate the energy balance of the boiler heat input and the heat loss to the determined threshold temperature.
3.6
Waste heat utilization utilizationratioofwasteheat
Effective heat output accounted for the percentage of heat input, which represents the formula.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 10863-2011_English be delivered?Answer: Upon your order, we will start to translate GB/T 10863-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 10863-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 10863-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 10863-2011?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 10863-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|