Path: Home > GB > Page178 > GB 26875.9-2026 || Home > Standard_List > GB > Page178 > GB 26875.9-2026
Price & DeliveryUS$459.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 26875.9-2026: Remote-monitoring system of urban fire protection - Part 9: User information transmission device Status: Valid
| Std ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status |
| GB 26875.9-2026 | English | 459 |
Add to Cart
|
4 days [Need to translate]
|
Remote-monitoring system of urban fire protection - Part 9: User information transmission device
| Valid |
Basic data | Standard ID | GB 26875.9-2026 (GB26875.9-2026) | | Description (Translated English) | Remote-monitoring system of urban fire protection - Part 9: User information transmission device | | Sector / Industry | National Standard | | Classification of Chinese Standard | C81 | | Classification of International Standard | 13.220.20 | | Word Count Estimation | 22,285 | | Date of Issue | 2026-02-27 | | Date of Implementation | 2027-03-01 | | Older Standard (superseded by this standard) | GB 26875.1-2011 | | Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB 26875.9-2026: Remote-monitoring system of urban fire protection - Part 9: User information transmission device ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 13.220.20
CCSC81
National Standards of the People's Republic of China
Replaces GB 26875.1-2011
Urban fire remote monitoring system
Part 9.User Information Transmission Device
Published on 2026-02-27
Implemented on 2027-03-01
State Administration for Market Regulation
The State Administration for Standardization issued a statement.
Table of contents
Preface III
Introduction IV
1.Scope 1
2 Normative References 1
3.Terms and Definitions 1
4.Classification 1
5.Technical Requirements 2
5.1 Appearance 2
5.2 Main Components 2
5.3 Receiving and transmitting information on the operational status of fire protection facilities 3
5.4 Inspection 3
5.5 Self-inspection 3
5.6 Resuming interrupted downloads 3
5.7 Time synchronization reception 3
5.8 Machine fault alarm 3
5.9 Manual Alarm 3
5.10 Response to Check-in 4
5.11 Power Supply 4
5.12 Power Parameter Fluctuation Performance 4
5.13 Insulation performance 4
5.14 Leakage Current 4
5.15 Electrical strength performance 4
5.16 Electromagnetic compatibility performance 4
5.17 Climate and Environmental Tolerance 6
5.18 Mechanical environmental tolerance 6
5.19 Software Requirements 6
5.20 Operational Level 7
6.Test Methods 7.
6.1 General Rules 7
6.2 Inspection of appearance and main components 7
6.3 Test on Receiving and Transmitting Fire Protection Facility Operation Status Information 8
6.4 Inspection Test 8
6.5 Self-test 8
6.6 Resuming Downloads After Breakpoints Test 8
6.7 Time synchronization and reception test 8
6.8 Machine fault alarm test 8
6.9 Manual Alarm Test 9
6.10 On-duty inspection response test 9
6.11 Power Supply Test 9
6.12 Power Parameter Fluctuation Performance Test 9
6.13 Insulation Resistance Test 9
6.14 Leakage Current Test 10
6.15 Electrical strength test 10
6.16 Radio Frequency Electromagnetic Field Radiation Immunity Test 10
6.17 Conducted Interference Immunity Test Based on Radio Frequency Field Induction 11
6.18 Electrostatic Discharge Immunity Test 11
6.19 Electrical Fast Transient/Bulk Immunity Test 11
6.20 Surge (Impulse) Immunity Test 11
6.21 Power Transient Test 12
6.22 Immunity Tests for Voltage Sags, Short Interruptions, and Voltage Variations 12
6.23 Low Temperature (Operation) Test 12
6.24 Constant Temperature and Humidity (Operation) Test 13
6.25 Constant Damp Heat (Durability) Test 13
6.26 Vibration (Sine) (Running) Test 13
6.27 Crash Test 13
7.Inspection Rule 14
7.1 Factory Inspection 14
7.2 Type Testing 14
8.Markings and Instruction Manual 15
8.1 Product Marking 15
8.2 Quality Inspection Mark 15
8.3 Instruction Manual 15
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents".
Drafting.
This document is Part 9 of GB (/T) 26875 "Urban Fire Remote Monitoring System". GB (/T) 26875 has the following publications.
part.
---Part 1.General Technical Requirements;
---Part 2.Functional Requirements for Communication Service Software;
---Part 3.Alarm Transmission Network Communication Protocol;
---Part 4.Basic Data Items;
---Part 5.Software Functional Requirements;
---Part 6.Functional Requirements for Information Management Software;
---Part 7.Functional Requirements for Fire Protection Facility Maintenance and Management Software;
---Part 8.Monitoring Center External Data Exchange Protocol;
---Part 9.User Information Transmission Device;
---Part 10.Requirements for fire protection facility information collection devices and interfaces.
This document supersedes GB 26875.1-2011 "Urban Fire Remote Monitoring System Part 1.User Information Transmission Device" and is consistent with...
Compared with GB 26875.1-2011, apart from structural adjustments and editorial changes, the main technical changes are as follows.
a) Added "Categories" (see Chapter 4);
b) Added appearance requirements (see 5.1);
c) The main power requirements have been changed (see 5.2.1.2, 5.2.1.3, and 4.1.1.1 in the.2011 version);
d) The requirements for indicator lights (see 5.2.2, 4.2.2 of the.2011 version);
e) The requirements for receiving and transmitting information have been changed (see 5.3, 4.1.2 and 4.1.3 in the.2011 version);
f) Added the requirement for resuming interrupted downloads (see 5.6);
g) Added timing reception requirements (see 5.7);
h) Modified the local fault alarm requirements (see 5.8, 4.1.6 of the.2011 version);
i) Power requirements have been changed (see 5.11, 4.1.8 of the.2011 version);
j) Increased requirements for power parameter fluctuation performance (see 5.12);
k) The insulation performance requirements have been changed (see 5.13,.2011 version 4.1.9);
l) Increased leakage current requirements (see 5.14);
m) The "Test Methods" have been changed (see Chapter 6, Chapter 5 of the.2011 edition);
n) The "Inspection Rules" have been changed (see Chapter 7, Chapter 6 of the.2011 edition).
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed and is under the jurisdiction of the State Fire and Rescue Administration.
The release history of this document and the document it replaces is as follows.
---First published in.2011 as GB 26875.1-2011;
---This is the first revision.
Introduction
Urban fire remote monitoring systems, as an important component of "smart city" and "smart fire protection" construction, play a crucial role in improving the completeness of building fire protection facilities.
It has played a positive role in improving the fire safety rate, enabling timely identification and rapid response to initial fires, and enhancing the fire safety management level of social units.
With the deepening of a new round of technological revolution and industrial transformation, a large number of new technologies, systems, and business models with higher security are emerging, and the Internet of Things (IoT) is becoming increasingly important.
High-tech technologies such as the Internet, cloud computing, big data, and artificial intelligence have been deeply integrated and applied in the fire protection field, and urban fire remote monitoring systems are keeping pace with the times.
The demand, through technological iteration, plays a vital role in reducing fire safety risks, and empowers the transformation and upgrading of fire protection work. In order to adapt to the information age...
The development of information technology will promote the implementation of the main responsibilities of social entities, enhance the social fire safety governance capabilities and urban risk monitoring and early warning capabilities, and improve the system.
GB (/T)26875 "Urban Fire Remote Monitoring System" is ordered. GB (/T)26875 is planned to consist of ten parts.
---Part 1.General Technical Requirements. The purpose is to specify the architecture and composition of urban fire remote monitoring systems and to clarify system functions.
Requirements related to energy, performance, and safety.
---Part 2.Functional Requirements for Communication Service Software. The purpose is to specify the functional requirements of the application support platform in the urban fire remote monitoring system.
The functions implemented by the messaging service software.
---Part 3.Communication Protocol between User Information Transmission Device and Application Support Platform. The purpose is to specify the communication protocol between the user information transmission device and the application support platform.
Transmission protocols between application support platforms.
---Part 4.Basic Data Items. The purpose is to define the basic data items included in an urban fire remote monitoring system.
---Part 5.Software Functional Requirements. The purpose is to specify the manual requirements for the support platform used in urban fire remote monitoring systems.
The functions implemented by the agent handling software.
---Part 6.Functional Requirements for Information Management Software. The purpose is to specify the functional requirements of the supporting platform used in urban fire remote monitoring systems.
The functions implemented by information management software.
---Part 7.Functional Requirements for the Maintenance and Repair Unit's Application Platform. The purpose is to specify the maintenance and repair requirements for the urban fire remote monitoring system.
The functions implemented by the application platform of the nursing unit.
---Part 8.System External Data Exchange Protocol. The purpose is to define the data exchange protocol between the urban fire remote monitoring system and external systems.
Data exchange protocol.
---Part 9.User Information Transmission Devices. The purpose is to specify the user information transmission devices in urban fire remote monitoring systems.
Functional and performance technical requirements.
---Part 10.Requirements for Fire Protection Facility Information Acquisition Devices and Interfaces. The purpose is to specify the requirements for fire protection facility information acquisition devices and interfaces in urban fire protection remote monitoring systems.
Requirements for information collection devices and interfaces for fire protection facilities.
Urban fire remote monitoring system
Part 9.User Information Transmission Device
1 Scope
This document specifies the classification, technical requirements, inspection rules, and markings for user information transmission devices in urban fire remote monitoring systems.
The instruction manual describes the corresponding test methods.
This document applies to the design of user information transmission devices for urban fire remote monitoring systems installed in general industrial and civil buildings.
Design, manufacturing and inspection.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 9969 General Rules for Instructions for Use of Industrial Products
GB 12978 Inspection Rules for Fire Protection Electronic Products
GB/T 16838 Environmental testing methods and severity levels for fire protection electronic products
GB/T 17626.2 Electromagnetic compatibility testing and measurement techniques - Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility testing and measurement techniques – Part 3.Radio frequency electromagnetic field radiated immunity testing
GB/T 17626.4 Electromagnetic compatibility testing and measurement techniques - Electrical fast transient/burst immunity test
GB/T 17626.5 Electromagnetic compatibility testing and measurement techniques - Surge (impulse) immunity test
GB/T 17626.6 Electromagnetic compatibility testing and measurement techniques - Conducted disturbance immunity induced by radio frequency fields
GB/T 17626.11 Electromagnetic compatibility testing and measurement techniques – Part 11.Testing for input currents less than or equal to 16A per phase
Voltage sag, short interruption and voltage change immunity tests
GB 25506-2010 General Technical Requirements for Fire Control Rooms
GB/T 26875.1 Urban Fire Remote Monitoring System - Part 1.General Technical Requirements
GB/T 26875.3 Urban Fire Remote Monitoring System - Part 3.Alarm Transmission Network Communication Protocol
3 Terms and Definitions
The terms and definitions defined in GB/T 26875.1 apply to this document.
4.Classification
User information transmission devices (hereinafter referred to as "transmission devices") are classified according to their functions as follows.
a) General-purpose type (with local information display and query control functions);
b) Gateway type (does not have local information display and query control functions).

Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 26875.9-2026_English be delivered?Answer: Upon your order, we will start to translate GB 26875.9-2026_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 26875.9-2026_English with my colleagues?Answer: Yes. The purchased PDF of GB 26875.9-2026_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|