|
US$119.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB 15359-2021: Maritime light vessels and large navigational buoys system, China Status: Valid GB 15359: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB 15359-2021 | English | 119 |
Add to Cart
|
3 days [Need to translate]
|
Maritime light vessels and large navigational buoys system, China
| Valid |
GB 15359-2021
|
| GB 15359-1994 | English | 199 |
Add to Cart
|
2 days [Need to translate]
|
Maritime light vessels and large buoys system, China
| Obsolete |
GB 15359-1994
|
Standard similar to GB 15359-2021 GB 5863
Basic data | Standard ID | GB 15359-2021 (GB15359-2021) | | Description (Translated English) | Maritime light vessels and large navigational buoys system, China | | Sector / Industry | National Standard | | Classification of Chinese Standard | R62 | | Word Count Estimation | 6,636 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB 15359-2021: Maritime light vessels and large navigational buoys system, China---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Maritime light vessels and large navigational buoys system, China
ICS 03.220.40
R62
National Standards of People's Republic of China
Replace GB 15359-1994
Lightship and large-scale navigation buoy system in China Sea
Released on 2021-10-11
2022-05-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Logo features 1
5 Audio and radio navigation aids 2
6 Dedicated logo 3
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB 15359-1994 "Standards for Lightships and Large Buoys in China Seas". Compared with GB 15359-1994, except for editorial
The main technical changes outside the modification are as follows.
---Modified the terms and definitions of "light boat" and "large navigation aid buoy" (see 3.1, 3.2, 3.1 and 3.2 of the.1994 edition);
---Modified the requirements for the name in the logo feature (see 4.1.3, 4.1.3 of the.1994 edition);
---Modified the requirements of the night feature in the sign feature (see 4.2, 4.2 in the.1994 edition);
---Modified the requirements of chart patterns in the sign features (see 4.3, 4.5 in the.1994 edition);
---The requirements for audio navigation aids have been revised (see 5.1, 4.4 in the.1994 edition);
---Modified the requirements of radar transponder (see 5.2, 4.3 in.1994 edition);
---Added the requirements for the navigation mark of the entity automatic identification system (see 5.3);
This standard was proposed and managed by the Ministry of Transport of the People's Republic of China.
The previous versions of the standard replaced by this standard are as follows.
---GB 15359-1994.
Lightship and large-scale navigation buoy system in China Sea
1 Scope
This standard specifies the marking characteristics, audio and radio navigation aids and special marking requirements for light boats and large navigable buoys in the China Sea.
This standard is applicable to light ships and large navigable buoys installed in the sea areas of China and its seaports, and the mouth of Tonghai estuary.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated reference documents, the latest version (including all amendments) is applicable to this document.
GB 4696 Water Navigation Aid Marks in China Sea
GB 12319 Chinese chart scheme
GB 12708 navigation mark light signal color
GB 17381 China Sea Area Visual Navigation Mark Surface Color Regulations
GB/T 17765 Terms of aids to navigation
3 Terms and definitions
The following terms and definitions defined in GB/T 17765 apply to this document. For ease of use, the following is repeated
Certain terms and definitions in GB/T 17765.
3.1
Lightvessel; lightship
It is equipped with high-intensity lights, and can also be equipped with audio or radio navigation aids, usually located at seaport gates, turning points or other important water
The boat-shaped floating flag of the domain.
[GB/T 17765-2021, definition 3.6.1]
3.2
Large navigationalbuoy; LANBY
Lambi
The waterline has a diameter of more than 8m and is equipped with high-intensity lamps, and can also be equipped with buoys with audio or radio navigation aids.
[GB/T 17765-2021, definition 3.6.2]
4 Logo features
4.1 Daytime characteristics
4.1.1 Shape
4.1.1.1 The shape of the floating body above the waterline of the lightship is a ship, as shown in Figure 1.
4.1.1.2 The shape of the large-scale navigation buoy is cylindrical, and the schematic diagram is shown in Figure 2.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 15359-2021_English be delivered?Answer: Upon your order, we will start to translate GB 15359-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB 15359-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB 15359-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB 15359-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 15359-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|